Filter interviews by
I was interviewed before Sep 2023.
The number of cubes required per cubic meter of concrete depends on the size of the cubes used in the construction process.
The number of cubes required per m3 of concrete can vary based on the size of the cubes used (e.g. 100mm x 100mm x 100mm cubes vs. 150mm x 150mm x 150mm cubes)
The size of the cubes used will determine the volume of each cube, which will then determine how many cubes are needed to fill a cubic meter...
Compaction is the process of reducing the volume of soil by removing air, while consolidation is the process of reducing the volume of soil by applying pressure.
Compaction involves reducing air voids in soil to increase its density
Consolidation involves applying pressure to soil to squeeze out water and reduce volume
Compaction is typically done before construction to improve soil stability
Consolidation is a natural pro
Volume of a sphere is calculated using the formula V = 4/3 * π * r^3
The formula to calculate the volume of a sphere is V = 4/3 * π * r^3
π is a mathematical constant approximately equal to 3.14159
r represents the radius of the sphere
To find the volume, cube the radius, multiply by 4/3, and then multiply by π
Baughs compound is a type of waterproofing material used in construction.
Baughs compound is a waterproofing material that is applied to surfaces to prevent water penetration.
It is commonly used in construction for sealing roofs, walls, and foundations.
The compound is typically a mixture of bitumen, solvents, and other additives to enhance its waterproofing properties.
UltraTech Cement generates the most heat of hydration in the cement industry.
UltraTech Cement is known for generating the most heat of hydration due to its high-quality materials and production processes.
The heat of hydration is a chemical process that occurs when water is added to cement, resulting in the release of heat.
Other companies in the cement industry may also generate significant heat of hydration, but UltraT...
Deep foundations are used when the soil near the surface is not strong enough to support the structure, while shallow foundations are used when the soil is strong enough.
Deep foundations are typically used for tall buildings, bridges, and large structures
Shallow foundations are commonly used for smaller structures like houses and small buildings
Deep foundations transfer the load of the structure to deeper, more stable ...
Zone III sand is commonly used for plastering due to its fine texture and smoothness.
Zone III sand is finer and smoother compared to other zones
It helps in achieving a smooth and even finish on the plastered surface
Zone III sand is also known for its good workability and bonding properties
Yes, there are specific design codes for steel and concrete structures.
Yes, there are specific design codes for steel structures such as AISC (American Institute of Steel Construction) and Eurocode.
For concrete structures, design codes include ACI (American Concrete Institute) and Eurocode as well.
These codes provide guidelines for the design, construction, and maintenance of steel and concrete structures to ensure saf
Simply supported beams have support at both ends, while cantilever beams have support at one end only.
Simply supported beams have support at both ends, allowing for rotation and deflection at both ends.
Cantilever beams have support at one end only, restricting rotation and deflection at that end.
Simply supported beams are common in bridges and buildings, while cantilever beams are often used in balconies and diving boa
Top trending discussions
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
The end-to-end billing process involves generating invoices, sending them to customers, and collecting payments.
Gathering billing information from various departments
Creating invoices based on services/products provided
Sending invoices to customers via email or mail
Following up on overdue payments
Recording payments received and updating accounts
The AR cycle is the process of managing accounts receivable from invoicing to payment collection.
Key components include invoicing customers for goods/services rendered, tracking payments received, following up on overdue payments, and reconciling accounts.
The cycle starts with generating invoices and ends with receiving payments.
Effective management of the AR cycle is crucial for maintaining cash flow and ensuring time...
Creating a sales order involves multiple steps and key components.
Gather customer information and product details
Enter the order into the system
Verify pricing and discounts
Confirm availability of products
Generate order confirmation for customer
Send order to fulfillment team for processing
Track order status and update customer
Invoice customer upon shipment
Manual invoices are created by inputting customer and service details, assigning an invoice number, and sending to the client.
Gather customer information such as name, address, and contact details.
Input service details including description, quantity, rate, and total amount.
Assign a unique invoice number for tracking and reference purposes.
Include payment terms, due date, and any applicable taxes or discounts.
Send the ...
I prioritize tasks based on deadlines and importance, creating a to-do list with clear objectives and timelines.
I start by assessing the urgency and importance of each task
I use tools like calendars, task management apps, or physical planners to organize my tasks
I break down larger tasks into smaller, manageable steps to avoid feeling overwhelmed
I regularly review and update my to-do list to ensure I am on track and ad
Credit and rebill processes involve correcting billing errors and resubmitting claims for payment.
Credit process involves identifying and correcting billing errors, such as incorrect charges or missing information.
Rebill process involves resubmitting corrected claims to insurance companies or patients for payment.
Both processes require attention to detail and knowledge of billing regulations and procedures.
Examples inc...
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
The aptitude test was hard, with over 70% of people likely to fail. However, by thinking practically and answering seriously, we can pass this round easily. There are 20 questions, but they don't reveal the cut-off marks or our scores. In my opinion, the cut-off may be 15 because I cleared this round and I think I scored 15. This is just my guess, as they didn't tell me my exact score.
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.
Normal questions they asked about education qualification
The green dot in Deloitte represents that the person is currently online and available for communication.
The green dot indicates that the person is active and online on the Deloitte platform.
It signifies that the person is available for communication and can respond promptly.
The green dot helps in identifying who is currently online and can be contacted for immediate assistance.
It is a visual indicator that shows the p
The question is asking for a descriptive answer to a given question.
Provide a detailed response to the question asked
Include relevant examples if applicable
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
I have worked in two organizations in the billing department.
Worked as a Billing Executive at XYZ Company for 3 years
Managed billing processes, including invoicing, payment tracking, and resolving billing discrepancies
Collaborated with cross-functional teams to ensure accurate and timely billing
Implemented process improvements that reduced billing errors by 20%
Experience with billing software such as QuickBooks and SAP
To handle work pressure, I prioritize tasks, practice time management, seek support from colleagues, and maintain a healthy work-life balance.
Prioritize tasks based on urgency and importance
Break down complex tasks into smaller manageable ones
Practice effective time management techniques like setting deadlines and using productivity tools
Delegate tasks to colleagues when necessary
Seek support and guidance from colleagu...
Strategy assignment work process
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 4 interview rounds.
I have experience as a Billing Executive and can provide details about my family and previous company.
I have worked as a Billing Executive for 3 years in XYZ Company.
In my previous company, I was responsible for managing billing processes, generating invoices, and resolving billing discrepancies.
I have a strong understanding of billing software and systems, ensuring accurate and timely billing.
I have a supportive famil...
My area of interest is billing and finance. As for salary expectation, I am looking for a competitive compensation package.
I have a strong interest in the field of billing and finance.
I have experience and knowledge in handling billing processes and financial transactions.
I am detail-oriented and enjoy working with numbers and data.
I am familiar with billing software and systems, and have the ability to analyze and res...
I applied via campus placement at Sangola College, Sangola and was interviewed in Mar 2022. There were 4 interview rounds.
I applied via AmbitionBox and was interviewed in Jun 2022. There were 2 interview rounds.
I'm interested in account,
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Civil Site Engineer
5
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Site Engineer
3
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Civil Engineer
3
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Junior Engineer Civil
3
salaries
| ₹1.4 L/yr - ₹2.4 L/yr |
TCS
Larsen & Toubro Limited
BHEL
Thermax Limited