Q1. Tell us about precast structure and where we use them?
Precast structures are pre-made concrete elements that are manufactured off-site and then assembled on-site.
Precast structures are made by pouring concrete into molds and allowing it to cure before being transported to the construction site.
They are commonly used in the construction of buildings, bridges, parking garages, and stadiums.
Precast structures offer advantages such as faster construction time, improved quality control, and reduced labor costs.
Examples of precast ele...read more
Q2. What is the function of stantions wire in launching of segment?
Stantions wire is used in launching of segments to provide stability and support during the construction process.
Stantions wire acts as a temporary support system for the segments during launching.
It helps in maintaining the alignment and position of the segments during the construction process.
Stantions wire also helps in distributing the load evenly across the segments.
It provides stability and prevents any potential movement or displacement of the segments.
Examples of stan...read more
Q3. What is the function of voids in a slab or in a bridge segment?
Voids in a slab or bridge segment serve various functions such as reducing weight, accommodating utilities, and allowing for expansion and contraction.
Voids in slabs or bridge segments help reduce the overall weight of the structure.
They can accommodate utilities such as electrical wiring, plumbing, or HVAC systems.
Voids allow for expansion and contraction of the structure due to temperature changes.
They provide space for inspection, maintenance, and repair of the structure.
E...read more
Q4. How laying process of pqc at site ?
The laying process of PQc at a site involves several steps and considerations.
Prepare the subgrade by removing any loose soil or debris.
Place a layer of granular material, such as crushed stone or gravel, to provide a stable base.
Compact the subgrade and granular layer using rollers or compactors.
Apply a tack coat to promote adhesion between the existing pavement and the PQc layer.
Spread and level the PQc mixture using a paver machine.
Compact the PQc layer using rollers to ac...read more
Q5. What is pile load test how we do it?
Pile load test is a method to determine the load-carrying capacity and behavior of deep foundations.
Pile load test involves applying a known load to a pile and measuring its response.
There are different types of pile load tests, such as static load test, dynamic load test, and statnamic load test.
Static load test is commonly performed by applying a gradually increasing load to the pile and measuring the settlement.
Dynamic load test involves using an impact hammer to generate ...read more
Q6. How to many types of operating system?
There are several types of operating systems including Windows, macOS, Linux, and Unix.
Operating systems can be categorized as single-user or multi-user.
They can also be categorized as single-tasking or multi-tasking.
Examples of operating systems include Windows, macOS, Linux, Unix, Android, iOS, and Chrome OS.
Q7. How face critical problem of local
The critical problem of local can be faced by implementing effective problem-solving strategies and collaborating with local authorities and stakeholders.
Identify the critical problems specific to the local area
Conduct thorough research and analysis to understand the root causes
Develop and implement effective problem-solving strategies
Collaborate with local authorities, community leaders, and stakeholders
Allocate resources and prioritize actions based on the severity of the p...read more
Q8. Define design concrete?
Design concrete refers to the process of creating a specific mix of concrete to meet the structural requirements of a project.
Design concrete involves determining the appropriate proportions of cement, aggregates, water, and admixtures.
The mix design is based on factors such as strength, durability, workability, and environmental conditions.
Design concrete is tailored to meet the specific needs of a project, such as high-strength concrete for tall buildings or low-shrinkage c...read more
Q9. How to work in booting system?
Booting system involves initializing hardware, loading operating system and executing startup scripts.
Power on the computer to start the boot process
BIOS/UEFI firmware checks hardware components
Bootloader loads operating system kernel
Operating system initializes drivers and services
Startup scripts run to configure system settings
Examples: GRUB, Windows Boot Manager
Q10. How to troubleshooting system?
Troubleshooting a system involves identifying and resolving issues that prevent it from functioning properly.
Start by gathering information about the problem and its symptoms
Use diagnostic tools to identify the root cause of the issue
Develop and implement a plan to resolve the problem
Test the system to ensure the issue has been resolved
Document the troubleshooting process and solution for future reference
Q11. How manage requirement of minm t & p.
Minimizing T&P requirement can be managed by optimizing processes and equipment.
Optimize processes to reduce T&P requirement
Use efficient equipment to minimize T&P usage
Regularly monitor and maintain equipment to prevent leaks and wastage
Train staff on proper T&P management techniques
Implement water conservation measures
Consider using recycled water for non-potable purposes
Q12. How to work in linux?
Working in Linux involves using the command line interface to navigate and execute tasks.
Learn basic commands such as ls, cd, mkdir, and rm
Understand file permissions and how to change them with chmod
Use package managers like apt-get or yum to install and update software
Become familiar with text editors like vi or nano
Use shell scripting to automate tasks
Join online communities and forums for support and learning opportunities
Q13. How to work in outlook?
Outlook is a popular email client used for managing emails, calendars, contacts, and tasks.
To work in Outlook, you need to first set up an email account.
You can then compose and send emails, organize your inbox using folders and rules, and schedule appointments and meetings in the calendar.
Outlook also allows you to manage your contacts and tasks, and set reminders for important events.
You can customize the Outlook interface to suit your preferences, and use keyboard shortcut...read more
Q14. Define BBS ?
BBS stands for Bar Bending Schedule.
BBS is a document that provides details of reinforcement steel bars required for a construction project.
It includes information like bar diameter, length, shape, and quantity.
BBS helps in estimating the amount of steel required and ensures proper reinforcement in the structure.
It is prepared based on structural drawings and specifications.
BBS aids in cost estimation, material procurement, and construction planning.
Example: BBS for a column ...read more
Q15. Define workability?
Workability refers to the ease and ability of a material to be manipulated, shaped, and compacted without losing its desired properties.
Workability is a crucial factor in construction and engineering, especially in concrete and other building materials.
It is influenced by factors such as water content, aggregate size and shape, and the use of admixtures.
Good workability allows for easier placement, compaction, and finishing of the material.
Poor workability can lead to difficu...read more