Oriental Structural Engineers Site Incharge Interview Questions and Answers

Updated 2 Jun 2022

Oriental Structural Engineers Site Incharge Interview Experiences

1 interview found

I applied via Newspaper Ad and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. How laying process of pqc at site ?
  • Ans. 

    The laying process of PQc at a site involves several steps and considerations.

    • Prepare the subgrade by removing any loose soil or debris.

    • Place a layer of granular material, such as crushed stone or gravel, to provide a stable base.

    • Compact the subgrade and granular layer using rollers or compactors.

    • Apply a tack coat to promote adhesion between the existing pavement and the PQc layer.

    • Spread and level the PQc mixture using...

  • Answered by AI
  • Q2. What is your experience about the structure concrete
  • Ans. My answer was that ours task fully ready and checked and approved by clients than we arrange and pour concrete .
  • Answered Anonymously
  • Q3. How you complete the given target by seniors.
  • Ans. We make first plan about the task and after we execute step by step complete the target.
  • Answered Anonymously
  • Q4. How are your requirement for complete the target.
  • Ans. We meet first our senior and demand the requirements.
  • Answered Anonymously
  • Q5. How face critical problem of local
  • Ans. 

    The critical problem of local can be faced by implementing effective problem-solving strategies and collaborating with local authorities and stakeholders.

    • Identify the critical problems specific to the local area

    • Conduct thorough research and analysis to understand the root causes

    • Develop and implement effective problem-solving strategies

    • Collaborate with local authorities, community leaders, and stakeholders

    • Allocate resou...

  • Answered by AI
  • Q6. How manage requirement of minm t & p.
  • Ans. 

    Minimizing T&P requirement can be managed by optimizing processes and equipment.

    • Optimize processes to reduce T&P requirement

    • Use efficient equipment to minimize T&P usage

    • Regularly monitor and maintain equipment to prevent leaks and wastage

    • Train staff on proper T&P management techniques

    • Implement water conservation measures

    • Consider using recycled water for non-potable purposes

  • Answered by AI
  • Q7. We manage minm machinery required as per site discussed

Interview Preparation Tips

Topics to prepare for Oriental Structural Engineers Site Incharge interview:
  • Structure work
Interview preparation tips for other job seekers - Thanks about the discussion we executed fully completely targets

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Ammonia process
Round 3 - HR 

(2 Questions)

  • Q1. How much salary expectations?
  • Q2. Salary Negotiable

Interview Preparation Tips

Interview preparation tips for other job seekers - All the best
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Field related building materials
  • Q2. Building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company,
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What a IS Code of Design Mix ?
  • Ans. 

    IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.

    • IS 456:2000 provides guidelines for plain and reinforced concrete design.

    • IS 10262:2019 outlines the procedure for concrete mix design.

    • Mix design considers factors like workability, strength, and durability.

    • Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).

    • The...

  • Answered by AI
  • Q2. What are the Welding method of steel?
  • Ans. 

    Welding methods for steel include various techniques like MIG, TIG, and Stick welding, each suited for different applications.

    • MIG Welding (Gas Metal Arc Welding) - Uses a continuous wire feed and is ideal for thin to medium thickness steel.

    • TIG Welding (Gas Tungsten Arc Welding) - Provides high precision and is suitable for thin materials and stainless steel.

    • Stick Welding (Shielded Metal Arc Welding) - Versatile and com...

  • Answered by AI
  • Q3. What are the advantage of steel shuttering?
  • Ans. 

    Steel shuttering offers durability, reusability, and precision in construction, enhancing project efficiency and quality.

    • Durability: Steel shuttering can withstand harsh weather conditions and heavy loads, making it suitable for large-scale projects.

    • Reusability: Unlike timber, steel can be reused multiple times, reducing material costs over time.

    • Precision: Steel shuttering provides a high level of accuracy in dimension...

  • Answered by AI
  • Q4. What are the benefits of using Composite Plate?
  • Ans. 

    Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.

    • High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.

    • Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.

    • Design flexibility: Can be molded into complex shapes, allowing for inn...

  • Answered by AI
  • Q5. How do you lay blocks in block work
  • Ans. 

    Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.

    • Prepare the foundation: Ensure the base is level and clean before starting.

    • Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.

    • Lay the first block: Start at a corner, applying mortar to the bottom and sides.

    • Check alignment: Use a level to ensure blocks are straight and even.

    • Stagger ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As a job seeker, it's essential to be proactive and persistent in your job search. Don't quit for opportunities to come to you. Create your own. 1- Network and make Connection. 2- Tailor your application materials. 3- Follow up 4- Continuous improve. 5- Stay positive and motivate.

Oriental Structural Engineers Interview FAQs

How many rounds are there in Oriental Structural Engineers Site Incharge interview?
Oriental Structural Engineers interview process usually has 2 rounds. The most common rounds in the Oriental Structural Engineers interview process are Resume Shortlist and Technical.
What are the top questions asked in Oriental Structural Engineers Site Incharge interview?

Some of the top questions asked at the Oriental Structural Engineers Site Incharge interview -

  1. How laying process of pqc at sit...read more
  2. How face critical problem of lo...read more
  3. How manage requirement of minm t &...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 117 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 53 Interviews
View all

Oriental Structural Engineers Site Incharge Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

2.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
38 salaries
unlock blur

₹3.4 L/yr - ₹6 L/yr

Assistant Engineer
29 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Junior Engineer Civil
22 salaries
unlock blur

₹1.8 L/yr - ₹3.3 L/yr

Project Engineer
20 salaries
unlock blur

₹6 L/yr - ₹10.3 L/yr

Senior Manager
17 salaries
unlock blur

₹7 L/yr - ₹13 L/yr

Explore more salaries
Compare Oriental Structural Engineers with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview