Upload Button Icon Add office photos

Filter interviews by

Oman United Engineering Services Site Engineer Interview Questions and Answers for Freshers

Updated 22 Feb 2022

Oman United Engineering Services Site Engineer Interview Experiences for Freshers

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 22 Feb 2022

I applied via Approached by Company and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - HR 

(7 Questions)

  • Q1. Where do you see yourself in 5 years?
  • Q2. What are your salary expectations?
  • Q3. What is your family background?
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. What are your strengths and weaknesses?
  • Q7. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm fresher and wanted to give my best performance to the company

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Describe your technical knowledge about pipe line
  • Ans. 

    I have a strong technical knowledge about pipeline design, construction, and maintenance.

    • I am familiar with different types of pipelines such as oil, gas, water, and sewage pipelines.

    • I have experience in designing pipeline routes, selecting materials, and calculating pressure drops.

    • I am knowledgeable about pipeline construction techniques, including welding, trenching, and backfilling.

    • I am skilled in pipeline inspectio...

  • Answered by AI
  • Q2. What is Bar vending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction.

    • It includes information like bar diameter, length, shape, and number of bars required for each structural element.

    • It helps in estimating the quantity of steel required for a project and ensures that the reinforcement is placed correctly.

    • It is prepared by a structural engineer or a detailer and is used by the site e...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Confident about your knowledge .You should be aware of the work of the firm you are going to and keep your behavior good.

Interview Questionnaire 

1 Question

  • Q1. How to make 90° without mesurment tape
  • Ans. 

    Use the Pythagorean theorem to make a 90° angle without a measurement tape.

    • Mark a point on the ground where you want the right angle to be.

    • From that point, measure out 3 units in one direction and 4 units in another direction.

    • Connect the ends of the 3 and 4 unit lines to form a right triangle.

    • The angle opposite the 3 unit line will be a 90° angle.

    • Alternatively, use a square object like a book or piece of paper to creat

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. How concrete is checked at site?
  • Ans. 

    Concrete is checked at site through various methods to ensure its quality and strength.

    • Visual inspection of concrete surface

    • Slump test to check consistency

    • Compression test to check strength

    • Ultrasonic testing to detect defects

    • Core testing to check strength and uniformity

    • Rebound hammer test to check surface hardness

    • Temperature monitoring during curing process

    • Checking for proper mix proportions and curing conditions

    • Verifi...

  • Answered by AI
  • Q2. What is free fall in terms of concrete.
  • Ans. 

    Free fall in concrete refers to the process of pouring concrete without any external force to assist in its placement.

    • Free fall is a method of placing concrete where it is allowed to fall from the mixer truck or pump without any external force.

    • This method is used for small jobs or in areas where access is limited.

    • It can result in segregation and air pockets in the concrete if not properly managed.

    • Free fall height shoul...

  • Answered by AI
  • Q3. Explain grade of concrete.
  • Ans. 

    Grade of concrete refers to the strength of the concrete mix.

    • Grade of concrete is denoted by the ratio of cement, sand, and aggregate used in the mix.

    • The strength of concrete increases with the increase in the grade of concrete.

    • For example, M20 grade of concrete means the mix contains 1 part cement, 1.5 parts sand, and 3 parts aggregate.

    • Higher grade of concrete is used for structures that require higher strength, such

  • Answered by AI
  • Q4. Define select fill material
  • Ans. 

    Select fill material is a type of soil used to fill in areas where the ground needs to be raised or leveled.

    • Select fill material is typically composed of clay, sand, and gravel.

    • It is used in construction projects to create a stable base for buildings, roads, and other structures.

    • The material is carefully selected and tested to ensure it meets specific engineering requirements.

    • Examples of select fill material include cr...

  • Answered by AI
  • Q5. What is embeded length
  • Ans. 

    Embedded length is the length of a reinforcing bar that is embedded in concrete.

    • It is the length of a reinforcing bar that is embedded in concrete

    • It is used to provide anchorage to the reinforcement in the concrete

    • The length is determined by the diameter of the bar and the strength of the concrete

    • It is important to ensure that the embedded length is sufficient to prevent failure of the structure

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Kindly study civil site practice book. All tests need to do on concrete and materials should review.

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Ask about me like family background my education etc.
Round 2 - Technical 

(2 Questions)

  • Q1. Ask about total station & auto level machine?
  • Q2. Ask about Grades of concrete?

Interview Preparation Tips

Interview preparation tips for other job seekers - ATS is good company you learn more thing about constitution industry. I worked with ATS 4 years.

Interview Questionnaire 

1 Question

  • Q1. Regarding Rock works volume calculations

Interview Questionnaire 

1 Question

  • Q1. Site experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Site experience and leadership

I applied via Walk-in and was interviewed in Jul 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Are you role & responsibility in previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - Self introduction, besic knowledge of which departments

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Motor stator working principle.why it is required. Effects of current in starting time.
  • Ans. 

    Motor stator is required for the conversion of electrical energy into mechanical energy.

    • Motor stator is the stationary part of the motor that houses the winding in which the current flows.

    • It is required for the conversion of electrical energy into mechanical energy.

    • The stator winding produces a magnetic field that interacts with the rotor to produce torque.

    • During starting, the current in the stator winding produces a m...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. ..,...............vbn.....

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and skill oriented.there is always a chance to crack your dream job .just need to allign to match that Post.

I applied via Approached by Company and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - HR 

(7 Questions)

  • Q1. Where do you see yourself in 5 years?
  • Q2. What are your salary expectations?
  • Q3. What is your family background?
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. What are your strengths and weaknesses?
  • Q7. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm fresher and wanted to give my best performance to the company

Oman United Engineering Services Interview FAQs

How many rounds are there in Oman United Engineering Services Site Engineer interview for freshers?
Oman United Engineering Services interview process for freshers usually has 1 rounds. The most common rounds in the Oman United Engineering Services interview process for freshers are HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Best Roadways Interview Questions
3.1
 • 5 Interviews
DIMTS Interview Questions
3.5
 • 4 Interviews
Supreme Interview Questions
3.4
 • 3 Interviews
View all

Oman United Engineering Services Site Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

2.0

Salary

2.0

Job security

2.0

Company culture

2.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Construction Management
3 salaries
unlock blur

₹14.1 L/yr - ₹24 L/yr

Site Engineer
3 salaries
unlock blur

₹6 L/yr - ₹10.8 L/yr

Civil Site Engineer
3 salaries
unlock blur

₹5.4 L/yr - ₹8 L/yr

Land Surveyor
3 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Explore more salaries
Compare Oman United Engineering Services with

Bombardier Transportation

4.2
Compare

Linfox Logistics

4.2
Compare

Maharashtra State Road Transport Corporation

4.2
Compare

Delhi Integrated Multi Modal Transit System

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview