  • Q1. How could you contribute your work

Interview Preparation Tips

Interview preparation tips for other job seekers - They Need machines to work

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What are the OSHA standards applicable to building construction?
  • Ans. 

    OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.

    • Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.

    • Hazard communication standards require employers to provide information about hazardous chemicals used on site.

    • Scaffolding safety regulations cover proper construction, use, and maintenan...

  • Answered by AI
  • Q2. What are the AISC codes applicable to steel structures?
  • Ans. 

    AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.

    • AISC 360 - Specification for Structural Steel Buildings

    • AISC 341 - Seismic Provisions for Structural Steel Buildings

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Whats is stop work application
  • Ans. 

    Stop work application is a procedure used to halt work activities due to safety concerns or violations.

    • Stop work applications are typically used when there is an imminent danger to workers or the environment.

    • Workers are trained to recognize when a stop work application is necessary and how to properly implement it.

    • Examples of reasons for a stop work application include unsafe working conditions, equipment malfunctions,

  • Answered by AI
  • Q2. What is scaffolding
  • Ans. 

    Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.

    • Scaffolding provides a safe working platform at height

    • It is typically made of metal or wood

    • Different types include tube and coupler, frame, and system scaffolding

    • Scaffolding must be inspected regularly for safety

  • Answered by AI
  • Q3. Types of scaffolding
  • Ans. 

    Types of scaffolding include supported scaffolding, suspended scaffolding, and aerial lifts.

    • Supported scaffolding is the most common type and is supported by the ground or a building structure.

    • Suspended scaffolding hangs from the roof or top of a building and is commonly used for window washing or painting.

    • Aerial lifts are platforms lifted by cranes or other equipment and are commonly used for tasks at height.

    • Other typ...

  • Answered by AI
  • Q4. Types of accident/incident
  • Ans. 

    Types of accidents/incidents include slips, trips, falls, machinery accidents, chemical exposures, and fires.

    • Slips, trips, and falls are common in workplaces due to wet floors, cluttered walkways, or uneven surfaces.

    • Machinery accidents can occur when proper safety procedures are not followed or equipment malfunctions.

    • Chemical exposures may result from spills, leaks, or improper handling of hazardous substances.

    • Fires ca...

  • Answered by AI
  • Q5. 0% accident incident work

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare the conduction all work in safety
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Accounting journal entries
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Q2. Tel us the control of confind
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many grade of Bitumen ?
  • Ans. 

    There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.

    • VG-10: Suitable for low-traffic roads

    • VG-20: Suitable for medium-traffic roads

    • VG-30: Suitable for high-traffic roads

    • VG-40: Suitable for heavy-duty traffic areas like airports and container terminals

  • Answered by AI
  • Q2. What is the compressive strength of cement mortar cube 3 days
  • Ans. 

    The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.

    • Compressive strength of cement mortar cube is an important parameter to assess its quality and durability

    • The strength of cement mortar increases with age, so 3 days is an early testing point

    • Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa

  • Answered by AI

Tell us how to improve this page.

Om Construction Company Reviews and Ratings

based on 7 reviews

3.5/5

Rating in categories

3.7

Skill development

3.7

Work-Life balance

3.5

Salary & Benefits

3.5

Job Security

3.5

Company culture

1.6

Promotions/Appraisal

3.8

Work Satisfaction

Explore 7 Reviews and Ratings
Project Manager
4 salaries
unlock blur

₹1.2 L/yr - ₹12 L/yr

Site Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Construction Engineer
3 salaries
unlock blur

₹2.9 L/yr - ₹4.2 L/yr

Project Coordinator
3 salaries
unlock blur

₹2.2 L/yr - ₹2.2 L/yr

Civil Site Engineer
3 salaries
unlock blur

₹3 L/yr - ₹4.5 L/yr

Explore more salaries
Compare Om Construction Company with

Lea Associates South Asia

4.3
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.0
Compare

Nesma & Partners

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview