Filter interviews by
I applied via Company Website and was interviewed in May 2022. There were 3 interview rounds.
5s, 7Qc tools ,
What are the types of production system.
What is the difference between Jig and Fixture.
To increase production, I would focus on optimizing processes, improving efficiency, and investing in new technology.
Analyze current production processes and identify areas for improvement
Implement lean manufacturing principles to eliminate waste and increase efficiency
Invest in new technology and equipment to improve production speed and quality
Train and develop employees to improve skills and knowledge
Implement perfo...
Top trending discussions
posted on 31 May 2024
I was interviewed in May 2024.
The number of Engineering Documents processed in an EPC project varies depending on the size and complexity of the project.
The number of Engineering Documents processed in an EPC project can range from hundreds to thousands.
These documents include drawings, specifications, calculations, reports, and other technical documents.
The exact number of documents will depend on the scope of the project, the number of discipline...
posted on 9 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 3 interview rounds.
posted on 17 Dec 2021
I applied via Referral and was interviewed before Dec 2020. There were 4 interview rounds.
posted on 22 Apr 2021
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.
posted on 27 Mar 2024
I applied via campus placement at Godavari College of Engineering, Jalgaon and was interviewed in Feb 2024. There were 2 interview rounds.
General Science Syllabus
I applied via Recruitment Consulltant and was interviewed before Dec 2023. There was 1 interview round.
The grinding process involves using a rotating abrasive wheel to remove material from a workpiece.
Grinding is a machining process that uses an abrasive wheel to remove material from a workpiece.
The workpiece is held in place while the grinding wheel rotates at high speed, making contact with the material and removing small chips.
Different types of grinding processes include surface grinding, cylindrical grinding, and c...
Establish open communication, respect union rules, negotiate fairly, address concerns promptly
Establish open communication channels with union representatives
Respect union rules and regulations to maintain a positive relationship
Negotiate fairly and transparently during contract discussions
Address any concerns or grievances from unionised manpower promptly and effectively
posted on 13 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
IATF certification ensures that an organization's quality management system meets international standards for automotive industry.
IATF certification is required for any organization that wants to supply products or services to the automotive industry.
It ensures that the organization's quality management system meets international standards for the automotive industry.
It helps to improve the organization's processes and...
Kaizen is continuous improvement while Poka Yoke is mistake-proofing.
Kaizen focuses on making small, incremental improvements to processes and systems over time.
Poka Yoke aims to prevent mistakes from happening by designing processes and systems in a way that makes errors impossible or easily detectable.
Kaizen is a long-term strategy while Poka Yoke is a short-term tactic.
Examples of Kaizen include implementing a sugge...
Points to consider while designing fixtures or gauges.
Understand the purpose of the fixture or gauge
Consider the material and size of the workpiece
Ensure proper clamping and alignment
Design for ease of use and maintenance
Consider the manufacturing process and cost
Test and validate the fixture or gauge before use
based on 3 reviews
Rating in categories
Production Engineer
13
salaries
| ₹1.8 L/yr - ₹3.3 L/yr |
CNC Operator
13
salaries
| ₹1 L/yr - ₹2.2 L/yr |
Maintenance Engineer
13
salaries
| ₹1.7 L/yr - ₹3.6 L/yr |
CNC Machine Operator
12
salaries
| ₹1 L/yr - ₹3 L/yr |
Technician
9
salaries
| ₹1.4 L/yr - ₹3.3 L/yr |
Indian Space Research Organisation
Hindustan Aeronautics
Bharat Electronics
TCS