i
Nisarga Family Homes
Filter interviews by
Be the first one to contribute and help others!
I appeared for an interview in Oct 2021.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
SBU is Strategic Business Unit, BU is Business Unit, and Carpet area is the total area of a building excluding walls and other non-usable spaces.
SBU is a standalone business entity within a larger organization, focusing on a specific market segment.
BU is a division or department within a company that operates independently but is still part of the larger organization.
Carpet area refers to the total usable area of a bui...
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
Relays are classified into different types based on their application and construction. The IEC code is used to identify the type of relay.
Types of relays include electromagnetic, solid-state, thermal, and reed relays
IEC code is a standardized coding system used to identify the type of relay
For example, IEC code for electromagnetic relay is 621-21-1
Solar and wind mills are renewable energy sources that generate electricity using the sun and wind respectively.
Solar panels convert sunlight into electricity through the photovoltaic effect
Wind turbines use the kinetic energy of wind to generate electricity
Both sources are clean and sustainable alternatives to fossil fuels
Solar and wind energy are becoming increasingly popular and cost-effective
Examples of solar and w...
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Company Website and was interviewed in May 2022. There was 1 interview round.
I applied via Apna Jobs and was interviewed before Mar 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2021. There were 3 interview rounds.
Written test on basic agreements relating to real estate
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
BBS of pile involves identifying potential hazards and implementing safety measures to prevent accidents during pile construction.
Identify potential hazards related to pile construction such as unstable ground conditions, heavy machinery operation, and falling objects.
Implement safety measures such as providing proper training to workers, using appropriate personal protective equipment, and conducting regular safety in...
Before roof tile work, proper preparation is essential to ensure a successful installation.
Inspect the roof for any damage or leaks that need to be repaired before installing new tiles
Ensure the roof structure is sound and can support the weight of the tiles
Clean the roof surface to remove any debris or dirt that could affect the adhesion of the tiles
Measure and plan the layout of the tiles to ensure a proper fit and a...
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Sales Executive
4
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Executive Engineer
3
salaries
| ₹2.4 L/yr - ₹5 L/yr |
General Manager Business Development
3
salaries
| ₹16 L/yr - ₹22 L/yr |
Accounts Head
3
salaries
| ₹6.2 L/yr - ₹9.5 L/yr |
Head Customer Support
3
salaries
| ₹8.9 L/yr - ₹8.9 L/yr |
Balaji Enterprises
Viraaj Ventures
Mahaveer Group
Lansum Properties