MCCB is used for high current applications while MCB is used for low current applications.
MCCB stands for Molded Case Circuit Breaker while MCB stands for Miniature Circuit Breaker.
MCCB is used for high current applications such as in industries, while MCB is used for low current applications such as in homes.
MCCB has a higher breaking capacity than MCB.
MCCB is more expensive than MCB.
Examples of MCCB include Siemens 3...
MCCBs are not suitable for domestic DB due to their high cost and low fault current rating.
MCCBs are designed for high current applications and have a high fault current rating, which is not required in domestic DBs.
MCCBs are expensive compared to other options like MCBs and RCBOs.
MCBs and RCBOs are more suitable for domestic DBs as they are cost-effective and have a lower fault current rating.
MCCBs are commonly used i...
I see the layout of the building and plan the conduiting accordingly.
I look for the location of the electrical room and the main distribution panel.
I identify the areas where electrical outlets and switches will be needed.
I plan the conduiting route based on the layout of the building and the electrical requirements.
I consider any obstacles such as beams or columns that may affect the conduiting.
I ensure that the condu...
The process of fixing modular box in Mivan sheet for wall conduiting in RCC involves several steps.
First, mark the position of the box on the Mivan sheet.
Then, drill a hole in the Mivan sheet at the marked position.
Insert the modular box into the hole and secure it with screws.
Connect the conduits to the modular box and run them through the RCC wall.
Finally, seal the gap between the modular box and the Mivan sheet with...
posted on 24 Jan 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.
Earthing involves creating a connection between the electrical system and the earth.
It is done by burying a metal conductor, such as a copper rod, in the ground.
The metal conductor is connected to the electrical system using a wire or cable.
Earthing provides a path for...
The type of DGs used at our site are diesel generators.
Diesel generators are commonly used as backup power sources in various industries.
They are reliable and can provide a continuous power supply during electrical outages.
DGs are often used in remote locations or areas with unreliable grid power.
They require regular maintenance and fuel supply to operate efficiently.
Examples of DGs used at our site include Cummins, Ca
LT line refers to Low Tension line while HT line refers to High Tension line.
LT line carries low voltage and is used for domestic and small-scale commercial purposes.
HT line carries high voltage and is used for industrial and large-scale commercial purposes.
LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.
LT lines are usually overhead lines, while HT lines can be both overhead and ...
We used different types of circuit breakers at the site depending on the specific requirements.
We used air circuit breakers (ACBs) for low voltage applications.
For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).
In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.
For specialized applications like generator protection, we used differential ...
The size of transformers used at the site varied depending on the specific requirements of the project.
Transformers used at the site were of different sizes based on the power demand of the electrical system.
For smaller projects, transformers with a capacity of around 100 kVA were used.
For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.
For larger projects, transformers wit...
We used a stationary type batching plant at the site.
We used a stationary type batching plant for our construction project.
The stationary batching plant had a higher production capacity compared to mobile plants.
It was equipped with multiple storage bins for different types of aggregates.
The plant had a conveyor belt system to transfer the aggregates to the mixer.
We used this type of batching plant because it provided
posted on 15 Feb 2024
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
posted on 25 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
posted on 21 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.
Some of the top questions asked at the Nikhil Comforts Electrical Supervisor interview -
based on 1 review
Rating in categories
Project Engineer
21
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Hvac Design Engineer
6
salaries
| ₹3.2 L/yr - ₹4 L/yr |
Safety Officer
6
salaries
| ₹1.5 L/yr - ₹2.2 L/yr |
Design Engineer
5
salaries
| ₹2.5 L/yr - ₹2.6 L/yr |
Electrical Engineer
5
salaries
| ₹2.1 L/yr - ₹3.2 L/yr |
Rajesh Enterprises
Rahul Industries
CTS Consulting & Technical Support
Patel Infrastructure