Upload Button Icon Add office photos

Filter interviews by

Nikhil Comforts Electrical Engineer Interview Questions and Answers

Updated 30 Mar 2021

Nikhil Comforts Electrical Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before Mar 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What are your strengths and weaknesses?

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic electrical questions related to switchgears switches wires transformers relays ups basics batteries transmission line

Interview questions from similar companies

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Theynasked about previous experience
  • Q2. Basic question about panel installation, cable tray work, cable laying, Glanding and termination, earthing system

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare what you mentined in resume.
Question all based of your resume.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Procedure about maintenance
  • Ans. 

    Maintenance procedures involve regular inspections, testing, and repairs to ensure equipment functionality and safety.

    • Regularly schedule maintenance tasks to prevent breakdowns and ensure equipment longevity

    • Conduct thorough inspections to identify potential issues before they escalate

    • Keep detailed records of maintenance activities and equipment history

    • Train staff on proper maintenance procedures and safety protocols

    • Uti...

  • Answered by AI
  • Q2. Knowledge about LOTO
  • Q3. Haw to maintain a battery bank
  • Ans. 

    To maintain a battery bank, regular inspections, proper charging, temperature control, and monitoring electrolyte levels are essential.

    • Perform regular inspections to check for signs of corrosion, leaks, or damage

    • Ensure proper charging by following manufacturer's guidelines and avoiding overcharging

    • Control temperature to prevent overheating or freezing, which can reduce battery life

    • Monitor electrolyte levels and top up ...

  • Answered by AI
  • Q4. Asking about ptw
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What is the process of earthing?
  • Ans. 

    Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.

    • Earthing involves creating a connection between the electrical system and the earth.

    • It is done by burying a metal conductor, such as a copper rod, in the ground.

    • The metal conductor is connected to the electrical system using a wire or cable.

    • Earthing provides a path for...

  • Answered by AI
  • Q2. Which type of DGs used at your Site
  • Ans. 

    The type of DGs used at our site are diesel generators.

    • Diesel generators are commonly used as backup power sources in various industries.

    • They are reliable and can provide a continuous power supply during electrical outages.

    • DGs are often used in remote locations or areas with unreliable grid power.

    • They require regular maintenance and fuel supply to operate efficiently.

    • Examples of DGs used at our site include Cummins, Ca

  • Answered by AI
  • Q3. What is the difference between LT and HT line?
  • Ans. 

    LT line refers to Low Tension line while HT line refers to High Tension line.

    • LT line carries low voltage and is used for domestic and small-scale commercial purposes.

    • HT line carries high voltage and is used for industrial and large-scale commercial purposes.

    • LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.

    • LT lines are usually overhead lines, while HT lines can be both overhead and ...

  • Answered by AI
  • Q4. Which type of Circuit Breakers you used at Site?
  • Ans. 

    We used different types of circuit breakers at the site depending on the specific requirements.

    • We used air circuit breakers (ACBs) for low voltage applications.

    • For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).

    • In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.

    • For specialized applications like generator protection, we used differential ...

  • Answered by AI
  • Q5. How big transformers you used at site
  • Ans. 

    The size of transformers used at the site varied depending on the specific requirements of the project.

    • Transformers used at the site were of different sizes based on the power demand of the electrical system.

    • For smaller projects, transformers with a capacity of around 100 kVA were used.

    • For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.

    • For larger projects, transformers wit...

  • Answered by AI
  • Q6. Which type of Batching Plant you used at Site
  • Ans. 

    We used a stationary type batching plant at the site.

    • We used a stationary type batching plant for our construction project.

    • The stationary batching plant had a higher production capacity compared to mobile plants.

    • It was equipped with multiple storage bins for different types of aggregates.

    • The plant had a conveyor belt system to transfer the aggregates to the mixer.

    • We used this type of batching plant because it provided

  • Answered by AI
  • Q7. At which project you are working

Interview Preparation Tips

Interview preparation tips for other job seekers - It dipends on the interviewer which type of questions he will ask.
But one thing important be confident while interview
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Questions about Transformer, motors,plc and starters and power factor etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and and give proper answer if you know. Be prepared for interviews.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About yourself, how many years are you experienced, about salary and other general questions.
Round 3 - Technical 

(2 Questions)

  • Q1. It's depend on experience and post where we applied.
  • Q2. About your past experience nothing more.

Interview Preparation Tips

Interview preparation tips for other job seekers - They paid high salary if you are coming from MNC and other reputed company this will your weak point and fell down.

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Theynasked about previous experience
  • Q2. Basic question about panel installation, cable tray work, cable laying, Glanding and termination, earthing system

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare what you mentined in resume.
Question all based of your resume.

I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Electrical related

Interview Preparation Tips

Interview preparation tips for other job seekers - Cable gland tramination how cable maggring panels related drawings asked electrical equipment installation

Tell us how to improve this page.

Interview Questions from Similar Companies

J&F Interview Questions
3.8
 • 29 Interviews
Eversendai Interview Questions
3.8
 • 27 Interviews
J K Fenner Interview Questions
3.9
 • 26 Interviews
View all
Nikhil Comforts Electrical Engineer Salary
based on 5 salaries
₹2.1 L/yr - ₹3.2 L/yr
38% less than the average Electrical Engineer Salary in India
View more details

Nikhil Comforts Electrical Engineer Reviews and Ratings

based on 5 reviews

3.3/5

Rating in categories

2.8

Skill development

2.4

Work-life balance

2.2

Salary

2.5

Job security

2.7

Company culture

2.2

Promotions

2.6

Work satisfaction

Explore 5 Reviews and Ratings
Project Engineer
21 salaries
unlock blur

₹2.4 L/yr - ₹3.6 L/yr

Hvac Design Engineer
6 salaries
unlock blur

₹3.2 L/yr - ₹4 L/yr

Safety Officer
6 salaries
unlock blur

₹1.5 L/yr - ₹2.2 L/yr

Design Engineer
5 salaries
unlock blur

₹2.5 L/yr - ₹2.6 L/yr

Electrical Engineer
5 salaries
unlock blur

₹2.1 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Nikhil Comforts with

Rajesh Enterprises

4.9
Compare

Rahul Industries

4.0
Compare

CTS Consulting & Technical Support

3.8
Compare

Patel Infrastructure

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview