Upload Button Icon Add office photos

Filter interviews by

NEXTracker Product Manager Interview Questions and Answers

Updated 15 May 2024

NEXTracker Product Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. About Product Management
Round 2 - One-on-one 

(1 Question)

  • Q1. Product Management

Product Manager Jobs at NEXTracker

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
No response

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Topics covered technical and aptitude questions

Round 2 - Technical 

(2 Questions)

  • Q1. Core technical questions
  • Q2. How does a transformer works. Detailed working and parameters to monitor
  • Ans. 

    A transformer works by transferring electrical energy between two or more circuits through electromagnetic induction.

    • Transformers consist of two coils of wire, known as the primary and secondary coils, wrapped around a core made of iron or other magnetic materials.

    • When an alternating current flows through the primary coil, it creates a changing magnetic field which induces a voltage in the secondary coil.

    • The ratio of t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your technical knowledge at good level. Expect some in-depth questions.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is your biggest achievement and biggest failure so far

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your CV self. Everything in your CV should be written by you only. Be honest about what I know and what not.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Assbly question and press
  • Q2. Scrap control manpower allegation
  • Q3. Shop floor control, material accountable

Interview Preparation Tips

Topics to prepare for Tata Power Production Engineer interview:
  • Production Engineering
  • Communication Skills
Interview preparation tips for other job seekers - Production engineer mobil assbly
And shift incharge
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Earlier experience
Round 2 - Technical 

(1 Question)

  • Q1. Improvement projects
Round 3 - HR 

(1 Question)

  • Q1. Basic background

Interview Preparation Tips

Interview preparation tips for other job seekers - Stick to your CV

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

Test based on technical education and mcq

Round 2 - Technical 

(4 Questions)

  • Q1. Ask about there field.
  • Q2. What you study in your course.?
  • Q3. How you manage a team?
  • Q4. How yourv expection from company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence level. Eye contact, how to connect with other person

Interview Questionnaire 

3 Questions

  • Q1. I have not any digree but iam above 20 years experience in sheet mental fabrication and all rounder except computer technology
  • Q2. ITI incomplete
  • Q3. Should system opparation
  • Ans. 

    Yes, system operation is crucial for efficient production management.

    • Efficient system operation ensures smooth production processes.

    • It helps in reducing downtime and increasing productivity.

    • Regular maintenance and updates are necessary for optimal system performance.

    • Proper training of staff on system usage is important.

    • Examples: ERP systems, inventory management systems, production scheduling software.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience certificates and test

Skills evaluated in this interview

I applied via Referral and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Ac and dc में अन्तर

Interview Preparation Tips

Interview preparation tips for other job seekers - यह करीब 1 घंटा 10 मिनट तक चला। साक्षात्कारकर्ता मेरे ज्ञान और संचार कौशल दोनों का परीक्षण करना चाहता था। मुझसे अधिकांश प्रश्न मेरे बी.टेक पाठ्यक्रम यानी कंप्यूटर विज्ञान से संबंधित विषयों से संबंधित थे। उन्होंने मेरे प्रोजेक्ट विषय से संबंधित मूलभूत बातों पर बहुत जोर दिया। सौभाग्य से मैं अधिकांश प्रश्नों का सही उत्तर देने में सक्षम था। मैंने उदाहरणों के साथ प्रत्येक प्रश्न का उत्तर देने की कोशिश की और अपने सिद्धांतों को समझाया.

NEXTracker Interview FAQs

How many rounds are there in NEXTracker Product Manager interview?
NEXTracker interview process usually has 2 rounds. The most common rounds in the NEXTracker interview process are One-on-one Round.
How to prepare for NEXTracker Product Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at NEXTracker. The most common topics and skills that interviewers at NEXTracker expect are Competitive Analysis, Market Research, Product Launch, Product Management and Strategic Planning.
What are the top questions asked in NEXTracker Product Manager interview?

Some of the top questions asked at the NEXTracker Product Manager interview -

  1. About Product Managem...read more
  2. Product Managem...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 221 Interviews
Adani Power Interview Questions
3.9
 • 198 Interviews
Adani Group Interview Questions
3.9
 • 173 Interviews
NTPC Interview Questions
4.2
 • 156 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
Suzlon Group Interview Questions
4.1
 • 121 Interviews
Torrent Power Interview Questions
3.8
 • 117 Interviews
Eaton Corporation Interview Questions
4.0
 • 112 Interviews
Vestas Interview Questions
4.3
 • 81 Interviews
View all
NEXTracker Product Manager Salary
based on 5 salaries
₹9 L/yr - ₹23.5 L/yr
21% less than the average Product Manager Salary in India
View more details
Product Manager, Solar Trackers

Hyderabad / Secunderabad

10-15 Yrs

Not Disclosed

Explore more jobs
Project Engineer
13 salaries
unlock blur

₹6 L/yr - ₹8 L/yr

Assistant Manager
9 salaries
unlock blur

₹9 L/yr - ₹24.9 L/yr

Assistant Project Engineer
9 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Logistics Analyst
9 salaries
unlock blur

₹5.7 L/yr - ₹8 L/yr

Sales Analyst
8 salaries
unlock blur

₹6 L/yr - ₹14.3 L/yr

Explore more salaries
Compare NEXTracker with

First Solar

4.1
Compare

Sun Power Corporation

1.0
Compare

SolarEdge Technologies

2.8
Compare

Trina Solar

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview