A Senior SAP Ppqm Consultant was asked
Q. What is an inspection plan?
Ans. 

An inspection plan is a document that outlines the steps and criteria for inspecting a product or process.

  • It includes information on the inspection characteristics, sampling procedures, and acceptance criteria.

  • Inspection plans are used in quality management to ensure that products meet the required standards.

  • They can be created for individual products or for a group of similar products.

  • Inspection plans can be crea...

View all Senior SAP Ppqm Consultant interview questions
A Senior SAP Ppqm Consultant was asked
Q. What is the difference between planned orders and production orders?
Ans. 

PLD. ORD refers to planned order while PRD. ORD refers to production order.

  • PLD. ORD is a tentative order created to meet the demand while PRD. ORD is a confirmed order to produce the required quantity.

  • PLD. ORD is created in the planning stage while PRD. ORD is created in the execution stage.

  • PLD. ORD does not have any material reservation while PRD. ORD has material reservation.

  • PLD. ORD can be converted to PRD. ORD...

View all Senior SAP Ppqm Consultant interview questions
A Senior SAP Ppqm Consultant was asked
Q. What is the BOM status?
Ans. 

BOM status refers to the current state of a Bill of Materials in a manufacturing process.

  • BOM status indicates whether a BOM is active or inactive.

  • It can also indicate whether a BOM is released for production or still in development.

  • BOM status can affect production planning and inventory management.

  • Examples of BOM status include 'released', 'obsolete', 'under development', and 'inactive'.

View all Senior SAP Ppqm Consultant interview questions
A Senior SAP Ppqm Consultant was asked
Q. What is the difference between repetitive and discrete manufacturing?
Ans. 

Repetitive and discrete are two types of manufacturing processes in SAP PP module.

  • Repetitive manufacturing is used for producing high volume, low variety products.

  • Discrete manufacturing is used for producing low volume, high variety products.

  • Repetitive manufacturing uses a production line with a fixed sequence of operations.

  • Discrete manufacturing uses a bill of materials (BOM) to define the components needed for e...

View all Senior SAP Ppqm Consultant interview questions
A Senior SAP Ppqm Consultant was asked
Q. What is a MIC?
Ans. 

MIC stands for Material Identification and Control.

  • MIC is a process in SAP PP/QM module that ensures the correct identification and control of materials used in production.

  • It involves assigning unique identification numbers to materials and tracking their usage throughout the production process.

  • MIC helps in maintaining quality standards and preventing errors or mix-ups in production.

  • It also helps in traceability a...

View all Senior SAP Ppqm Consultant interview questions
A Senior SAP Ppqm Consultant was asked
Q. What is the integration between PP, MM, SD, FICO, and QM?
Ans. 

Integration between PP, MM, SD, FICO, and QM in SAP.

  • PP creates production plan based on sales orders from SD and material availability from MM.

  • QM ensures quality control during production process and inspects finished products.

  • FICO manages financial aspects of production and sales.

  • MM manages procurement of raw materials and inventory management.

  • SD manages sales orders and customer data.

View all Senior SAP Ppqm Consultant interview questions
A Senior SAP Ppqm Consultant was asked
Q. What are group and group counter?
Ans. 

Group and group counter are used in SAP PP to group similar materials and operations.

  • Group is a classification of materials or operations based on common characteristics.

  • Group counter is a numerical identifier assigned to each group.

  • Groups can be used for planning, scheduling, and reporting purposes.

  • For example, materials with similar properties can be grouped together for easier management.

  • Similarly, operations w...

View all Senior SAP Ppqm Consultant interview questions
Are these interview questions helpful?
A Senior SAP Ppqm Consultant was asked
Q. What is a BOM group?
Ans. 

BOM group is a classification of BOMs based on their usage and characteristics.

  • BOM group is used to group similar BOMs together.

  • It helps in managing and maintaining BOMs efficiently.

  • BOM group can be used for planning, costing, and production purposes.

  • Examples of BOM groups are engineering BOM, production BOM, sales BOM, etc.

View all Senior SAP Ppqm Consultant interview questions
A Senior SAP Ppqm Consultant was asked
Q. What are the control parameters of MRP?
Ans. 

Control parameters of MRP include lot size, safety stock, reorder point, and planning horizon.

  • Lot size determines the quantity of material to be produced or procured in one go.

  • Safety stock is the buffer stock maintained to meet unexpected demand or supply chain disruptions.

  • Reorder point is the inventory level at which a new order is triggered.

  • Planning horizon is the time period for which MRP is planned.

View all Senior SAP Ppqm Consultant interview questions
A Senior SAP Ppqm Consultant was asked
Q. What are scheduling parameters?
Ans. 

Scheduling parameter is a setting that determines the timing and frequency of a process or task.

  • Scheduling parameters are used in SAP PP to control the production process.

  • They can be used to set the start and end dates of a production order.

  • They can also be used to determine the frequency of a recurring task, such as a quality inspection.

  • Examples of scheduling parameters include start date, end date, lead time, an...

View all Senior SAP Ppqm Consultant interview questions

Neovatic Technologies Interview Experiences

4 interviews found

Interview Questionnaire 

18 Questions

  • Q1. What is the org structure of sap pp.
  • Ans. 

    The org structure of SAP PP includes plant, storage location, work center, routing, and production version.

    • Plant is the highest level in the org structure

    • Storage location is a sub-level of plant

    • Work center is a sub-level of storage location

    • Routing is a sub-level of work center

    • Production version is a sub-level of routing

  • Answered by AI
  • Q2. What is mrp
  • Ans. 

    MRP stands for Material Requirements Planning, a system used to plan and control inventory levels and production schedules.

    • MRP helps in determining the quantity and timing of raw materials required for production.

    • It considers factors like lead time, demand, and inventory levels to create a production plan.

    • MRP is a key component of SAP PP module and helps in optimizing production processes.

    • It helps in reducing inventory...

  • Answered by AI
  • Q3. What is sop
  • Ans. 

    SOP stands for Standard Operating Procedure, which is a documented procedure that outlines steps to be followed in a specific process.

    • SOPs are used to ensure consistency and quality in processes

    • They are often used in industries such as manufacturing, healthcare, and food service

    • SOPs can include step-by-step instructions, safety precautions, and quality control measures

    • Examples of SOPs include a cleaning procedure for a...

  • Answered by AI
  • Q4. What is scheduling parameter
  • Ans. 

    Scheduling parameter is a setting that determines the timing and frequency of a process or task.

    • Scheduling parameters are used in SAP PP to control the production process.

    • They can be used to set the start and end dates of a production order.

    • They can also be used to determine the frequency of a recurring task, such as a quality inspection.

    • Examples of scheduling parameters include start date, end date, lead time, and cyc...

  • Answered by AI
  • Q5. What is backflushing
  • Ans. 

    Backflushing is a process in SAP PP/QM where the system automatically issues materials to a production order upon completion of the order.

    • Backflushing is used to reduce manual data entry and improve efficiency.

    • It is commonly used in industries such as manufacturing and assembly.

    • The system automatically calculates the quantity of materials used based on the bill of materials (BOM) and issues them to the production order...

  • Answered by AI
  • Q6. What are the control parameter of mrp
  • Ans. 

    Control parameters of MRP include lot size, safety stock, reorder point, and planning horizon.

    • Lot size determines the quantity of material to be produced or procured in one go.

    • Safety stock is the buffer stock maintained to meet unexpected demand or supply chain disruptions.

    • Reorder point is the inventory level at which a new order is triggered.

    • Planning horizon is the time period for which MRP is planned.

  • Answered by AI
  • Q7. What is the difference between repetitive and discrete
  • Ans. 

    Repetitive and discrete are two types of manufacturing processes in SAP PP module.

    • Repetitive manufacturing is used for producing high volume, low variety products.

    • Discrete manufacturing is used for producing low volume, high variety products.

    • Repetitive manufacturing uses a production line with a fixed sequence of operations.

    • Discrete manufacturing uses a bill of materials (BOM) to define the components needed for each p...

  • Answered by AI
  • Q8. What bom group
  • Ans. 

    BOM group is a classification of BOMs based on their usage and characteristics.

    • BOM group is used to group similar BOMs together.

    • It helps in managing and maintaining BOMs efficiently.

    • BOM group can be used for planning, costing, and production purposes.

    • Examples of BOM groups are engineering BOM, production BOM, sales BOM, etc.

  • Answered by AI
  • Q9. What is bom status
  • Ans. 

    BOM status refers to the current state of a Bill of Materials in a manufacturing process.

    • BOM status indicates whether a BOM is active or inactive.

    • It can also indicate whether a BOM is released for production or still in development.

    • BOM status can affect production planning and inventory management.

    • Examples of BOM status include 'released', 'obsolete', 'under development', and 'inactive'.

  • Answered by AI
  • Q10. What is group and group counter
  • Ans. 

    Group and group counter are used in SAP PP to group similar materials and operations.

    • Group is a classification of materials or operations based on common characteristics.

    • Group counter is a numerical identifier assigned to each group.

    • Groups can be used for planning, scheduling, and reporting purposes.

    • For example, materials with similar properties can be grouped together for easier management.

    • Similarly, operations with s...

  • Answered by AI
  • Q11. What is the difference between pld. ord and prd. ord.
  • Ans. 

    PLD. ORD refers to planned order while PRD. ORD refers to production order.

    • PLD. ORD is a tentative order created to meet the demand while PRD. ORD is a confirmed order to produce the required quantity.

    • PLD. ORD is created in the planning stage while PRD. ORD is created in the execution stage.

    • PLD. ORD does not have any material reservation while PRD. ORD has material reservation.

    • PLD. ORD can be converted to PRD. ORD afte...

  • Answered by AI
  • Q12. What is bom usage
  • Ans. 

    BOM usage is a classification of how a Bill of Materials (BOM) is used in a production process.

    • BOM usage determines the purpose of a BOM in a production process.

    • It can be used for production, costing, or engineering purposes.

    • Examples of BOM usage include production BOM, costing BOM, and engineering BOM.

    • Production BOM is used for manufacturing finished goods, while costing BOM is used for calculating the cost of a produ...

  • Answered by AI
  • Q13. What is the integration between pp , mm ,sd ,fico and qm.
  • Ans. 

    Integration between PP, MM, SD, FICO, and QM in SAP.

    • PP creates production plan based on sales orders from SD and material availability from MM.

    • QM ensures quality control during production process and inspects finished products.

    • FICO manages financial aspects of production and sales.

    • MM manages procurement of raw materials and inventory management.

    • SD manages sales orders and customer data.

  • Answered by AI
  • Q14. What is mic
  • Ans. 

    MIC stands for Material Identification and Control.

    • MIC is a process in SAP PP/QM module that ensures the correct identification and control of materials used in production.

    • It involves assigning unique identification numbers to materials and tracking their usage throughout the production process.

    • MIC helps in maintaining quality standards and preventing errors or mix-ups in production.

    • It also helps in traceability and re...

  • Answered by AI
  • Q15. What is inspection plan
  • Ans. 

    An inspection plan is a document that outlines the steps and criteria for inspecting a product or process.

    • It includes information on the inspection characteristics, sampling procedures, and acceptance criteria.

    • Inspection plans are used in quality management to ensure that products meet the required standards.

    • They can be created for individual products or for a group of similar products.

    • Inspection plans can be created i...

  • Answered by AI
  • Q16. What is demand management
  • Ans. 

    Demand management is the process of forecasting, planning, and managing the demand for products or services.

    • It involves analyzing historical data and market trends to predict future demand

    • It helps in optimizing inventory levels and production schedules

    • It ensures that the right products are available at the right time and in the right quantity

    • It involves collaboration between sales, marketing, and production teams

    • Exampl...

  • Answered by AI
  • Q17. What is the difference between stock requirements list and mrp list
  • Ans. 

    Stock requirements list and MRP list are two different reports used in SAP PP module.

    • Stock requirements list shows the current stock levels and future requirements for a material.

    • MRP list shows the planned procurement proposals for a material based on the current stock levels and future requirements.

    • Stock requirements list is used for monitoring stock levels and planning production, while MRP list is used for procureme...

  • Answered by AI
  • Q18. What is milestone confirmation
  • Ans. 

    Milestone confirmation is a process of confirming the completion of a significant event or stage in a project or production process.

    • Milestones are predetermined checkpoints in a project or production process

    • Confirmation involves verifying that the milestone has been achieved

    • Milestone confirmation helps to track progress and identify potential delays

    • Examples of milestones in production process include completion of a sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - must practice all the t code with field with business process.

Skills evaluated in this interview

I applied via Walk-in and was interviewed before Jan 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About subject will ask well and good questions
  • Q2. If experience candidate means will ask about projects in depth and etc
Round 3 - HR 

(5 Questions)

  • Q1. What is your family background?
  • Ans. 

    I come from a close-knit family that values education and hard work, which has greatly influenced my career choices.

    • My father is an engineer, which inspired my analytical skills.

    • My mother is a teacher, instilling in me the importance of education.

    • I have a younger sister who is pursuing her studies in computer science.

    • Family gatherings are frequent, fostering strong relationships and support.

  • Answered by AI
  • Q2. What are your salary expectations?
  • Q3. Why are you looking for a change?
  • Q4. Where do you see yourself in 5 years?
  • Q5. Tell me about yourself.

Interview Preparation Tips

Topics to prepare for Neovatic Technologies SAP SD Consultant interview:
  • SAP SD
  • And which module u belongs to.
Interview preparation tips for other job seekers - For freshers it is well and good company to build a good career growth. Will get good experience by working with multiple clients.

Interview Questions & Answers

user image Anonymous

posted on 14 Jul 2021

Interview Questionnaire 

2 Questions

  • Q1. Basic questions about Sap Cloud What is Cloud Integration
  • Q2. About java and Html css

I applied via AmbitionBox

Interview Questionnaire 

2 Questions

  • Q1. Technical rounds
  • Q2. About SAP

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident. If SAP basis is your choice then fix right on to it. Don't go for it for time pass

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Neovatic Technologies?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Referral and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Basic data annotation questions

Round 2 - One-on-one 

(1 Question)

  • Q1. Question related to the project

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared to answer anything of the Data Annotation related questions. Experience of google sheet and MS excel is a huge plus

I applied via Walk-in and was interviewed before Nov 2020. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. Tell me about yourself
  • Q2. Process details
  • Q3. Company information
  • Q4. Tell me about yourself
  • Q5. Process details
  • Q6. Company information
  • Q7. Tell me about yourself
  • Q8. Process details
  • Q9. Company information

Interview Preparation Tips

Interview preparation tips for other job seekers - Be frank and give proper answers

I applied via Naukri.com and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Financial domain

Interview Preparation Tips

Interview preparation tips for other job seekers - Listen to questions and only answer that.Dont get overexcited.Take a deep breath
Are these interview questions helpful?

I applied via LinkedIn and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Hospital Billing Related
  • Q2. Please be prepared with complete Hospital billing process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prompt in answering the questions

I applied via Referral and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Subject based questions
  • Q2. About radiology
  • Q3. MRI, X-RAY etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was cool and decent. Felt happy after getting selected. No need to be so nervous during interview.

Interview Questionnaire 

2 Questions

  • Q1. Basic procurement questions
  • Q2. Anyone with 1 months of basic pr to po and vendor management exp will crack the interview BUT I DO NOT SUGGEST TO ATTEND THE INTERVIEW - JUST DONT JOIN PRIMERA

Neovatic Technologies Interview FAQs

How many rounds are there in Neovatic Technologies interview?
Neovatic Technologies interview process usually has 3 rounds. The most common rounds in the Neovatic Technologies interview process are Resume Shortlist, Technical and HR.
How to prepare for Neovatic Technologies interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Neovatic Technologies. The most common topics and skills that interviewers at Neovatic Technologies expect are SAP SD, SAP MM, SAP PP, SAP CO and SAP FICO.
What are the top questions asked in Neovatic Technologies interview?

Some of the top questions asked at the Neovatic Technologies interview -

  1. what is the difference between stock requirements list and mrp li...read more
  2. what is the integration between pp , mm ,sd ,fico and ...read more
  3. what is the difference between repetitive and discre...read more
What are the most common questions asked in Neovatic Technologies HR round?

The most common HR questions asked in Neovatic Technologies interview are -

  1. Why are you looking for a chan...read more
  2. Where do you see yourself in 5 yea...read more
  3. What is your family backgrou...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

CMS IT Services Interview Questions
3.1
 • 146 Interviews
iMerit Interview Questions
3.3
 • 108 Interviews
Arcesium Interview Questions
3.5
 • 85 Interviews
QualiZeal Interview Questions
4.3
 • 59 Interviews
Mavenir Systems Interview Questions
3.4
 • 58 Interviews
DotPe Interview Questions
3.1
 • 42 Interviews
NexTurn Interview Questions
4.1
 • 34 Interviews
View all

Neovatic Technologies Reviews and Ratings

based on 45 reviews

4.0/5

Rating in categories

4.2

Skill development

3.7

Work-life balance

3.6

Salary

3.7

Job security

3.8

Company culture

3.5

Promotions

3.9

Work satisfaction

Explore 45 Reviews and Ratings
Sap Pp Qm Functional Consultant

New Delhi,

Delhi/Ncr

7-12 Yrs

Not Disclosed

Sap Sd Functional Consultant

Hyderabad / Secunderabad

6-11 Yrs

Not Disclosed

Sap Sd Lead

Hyderabad / Secunderabad

10-20 Yrs

Not Disclosed

Explore more jobs
SAP MM Consultant
27 salaries
unlock blur

₹1.5 L/yr - ₹10.2 L/yr

Associate Consultant
23 salaries
unlock blur

₹2.5 L/yr - ₹6.2 L/yr

SAP SD Consultant
19 salaries
unlock blur

₹7.5 L/yr - ₹14 L/yr

SAP Abap Consultant
18 salaries
unlock blur

₹3 L/yr - ₹12.6 L/yr

SAP Fico Consultant
16 salaries
unlock blur

₹6.2 L/yr - ₹22.7 L/yr

Explore more salaries
Compare Neovatic Technologies with

CMS IT Services

3.1
Compare

iMerit

3.3
Compare

Quantiphi Analytics Solutions Private Limited

3.2
Compare

PrimEra Medical Technologies

3.5
Compare
write
Share an Interview