The org structure of SAP PP includes plant, storage location, work center, routing, and production version.
Plant is the highest level in the org structure
Storage location is a sub-level of plant
Work center is a sub-level of storage location
Routing is a sub-level of work center
Production version is a sub-level of routing
MRP stands for Material Requirements Planning, a system used to plan and control inventory levels and production schedules.
MRP helps in determining the quantity and timing of raw materials required for production.
It considers factors like lead time, demand, and inventory levels to create a production plan.
MRP is a key component of SAP PP module and helps in optimizing production processes.
It helps in reducing inventory...
SOP stands for Standard Operating Procedure, which is a documented procedure that outlines steps to be followed in a specific process.
SOPs are used to ensure consistency and quality in processes
They are often used in industries such as manufacturing, healthcare, and food service
SOPs can include step-by-step instructions, safety precautions, and quality control measures
Examples of SOPs include a cleaning procedure for a...
Scheduling parameter is a setting that determines the timing and frequency of a process or task.
Scheduling parameters are used in SAP PP to control the production process.
They can be used to set the start and end dates of a production order.
They can also be used to determine the frequency of a recurring task, such as a quality inspection.
Examples of scheduling parameters include start date, end date, lead time, and cyc
Backflushing is a process in SAP PP/QM where the system automatically issues materials to a production order upon completion of the order.
Backflushing is used to reduce manual data entry and improve efficiency.
It is commonly used in industries such as manufacturing and assembly.
The system automatically calculates the quantity of materials used based on the bill of materials (BOM) and issues them to the production order...
Control parameters of MRP include lot size, safety stock, reorder point, and planning horizon.
Lot size determines the quantity of material to be produced or procured in one go.
Safety stock is the buffer stock maintained to meet unexpected demand or supply chain disruptions.
Reorder point is the inventory level at which a new order is triggered.
Planning horizon is the time period for which MRP is planned.
Repetitive and discrete are two types of manufacturing processes in SAP PP module.
Repetitive manufacturing is used for producing high volume, low variety products.
Discrete manufacturing is used for producing low volume, high variety products.
Repetitive manufacturing uses a production line with a fixed sequence of operations.
Discrete manufacturing uses a bill of materials (BOM) to define the components needed for each p...
BOM group is a classification of BOMs based on their usage and characteristics.
BOM group is used to group similar BOMs together.
It helps in managing and maintaining BOMs efficiently.
BOM group can be used for planning, costing, and production purposes.
Examples of BOM groups are engineering BOM, production BOM, sales BOM, etc.
BOM status refers to the current state of a Bill of Materials in a manufacturing process.
BOM status indicates whether a BOM is active or inactive.
It can also indicate whether a BOM is released for production or still in development.
BOM status can affect production planning and inventory management.
Examples of BOM status include 'released', 'obsolete', 'under development', and 'inactive'.
Group and group counter are used in SAP PP to group similar materials and operations.
Group is a classification of materials or operations based on common characteristics.
Group counter is a numerical identifier assigned to each group.
Groups can be used for planning, scheduling, and reporting purposes.
For example, materials with similar properties can be grouped together for easier management.
Similarly, operations with s...
PLD. ORD refers to planned order while PRD. ORD refers to production order.
PLD. ORD is a tentative order created to meet the demand while PRD. ORD is a confirmed order to produce the required quantity.
PLD. ORD is created in the planning stage while PRD. ORD is created in the execution stage.
PLD. ORD does not have any material reservation while PRD. ORD has material reservation.
PLD. ORD can be converted to PRD. ORD afte...
BOM usage is a classification of how a Bill of Materials (BOM) is used in a production process.
BOM usage determines the purpose of a BOM in a production process.
It can be used for production, costing, or engineering purposes.
Examples of BOM usage include production BOM, costing BOM, and engineering BOM.
Production BOM is used for manufacturing finished goods, while costing BOM is used for calculating the cost of a produ...
Integration between PP, MM, SD, FICO, and QM in SAP.
PP creates production plan based on sales orders from SD and material availability from MM.
QM ensures quality control during production process and inspects finished products.
FICO manages financial aspects of production and sales.
MM manages procurement of raw materials and inventory management.
SD manages sales orders and customer data.
MIC stands for Material Identification and Control.
MIC is a process in SAP PP/QM module that ensures the correct identification and control of materials used in production.
It involves assigning unique identification numbers to materials and tracking their usage throughout the production process.
MIC helps in maintaining quality standards and preventing errors or mix-ups in production.
It also helps in traceability and re
An inspection plan is a document that outlines the steps and criteria for inspecting a product or process.
It includes information on the inspection characteristics, sampling procedures, and acceptance criteria.
Inspection plans are used in quality management to ensure that products meet the required standards.
They can be created for individual products or for a group of similar products.
Inspection plans can be created i...
Demand management is the process of forecasting, planning, and managing the demand for products or services.
It involves analyzing historical data and market trends to predict future demand
It helps in optimizing inventory levels and production schedules
It ensures that the right products are available at the right time and in the right quantity
It involves collaboration between sales, marketing, and production teams
Exampl...
Stock requirements list and MRP list are two different reports used in SAP PP module.
Stock requirements list shows the current stock levels and future requirements for a material.
MRP list shows the planned procurement proposals for a material based on the current stock levels and future requirements.
Stock requirements list is used for monitoring stock levels and planning production, while MRP list is used for procureme...
Milestone confirmation is a process of confirming the completion of a significant event or stage in a project or production process.
Milestones are predetermined checkpoints in a project or production process
Confirmation involves verifying that the milestone has been achieved
Milestone confirmation helps to track progress and identify potential delays
Examples of milestones in production process include completion of a sp...
Top trending discussions
I applied via Approached by Company and was interviewed before Sep 2023. There were 4 interview rounds.
Hackerearth platform was provided , Question was based on Tree dsa. Need to run and pass few test cases.
Design patterns , chess LLD
Design blocking queue which can handle the multithreading scenario
Developed a web application for tracking inventory and sales data
Used React for front-end development
Implemented RESTful APIs using Node.js and Express
Utilized MongoDB for database management
posted on 3 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
posted on 9 May 2024
posted on 15 Jul 2024
I applied via Naukri.com and was interviewed before Jul 2023. There were 2 interview rounds.
VLookUp is a function in Excel used to search for a value in a table and return a corresponding value in a specified column.
VLookUp stands for 'Vertical Lookup'
It is used to search for a value in the first column of a table and return a value in the same row from a specified column
Syntax: VLOOKUP(lookup_value, table_array, col_index_num, [range_lookup])
Example: =VLOOKUP(A2, B2:D10, 3, FALSE) - searches for the value in...
My expected CTC is negotiable based on the responsibilities and opportunities provided by the role.
My expected CTC is based on market research and industry standards.
I am looking for a competitive salary package that reflects my experience and skills.
I am open to discussing benefits and bonuses as part of the overall compensation package.
posted on 4 Sep 2024
I applied via Naukri.com and was interviewed before Sep 2023. There were 2 interview rounds.
Managed client relationships, conducted financial analysis, and led project teams in previous role as Senior Analyst at XYZ Company.
Managed client relationships to ensure satisfaction and retention
Conducted financial analysis to identify trends and make recommendations
Led project teams to successful completion within budget and timeline
Collaborated with cross-functional teams to achieve company goals
posted on 30 Sep 2022
I applied via Referral and was interviewed in Aug 2022. There were 2 interview rounds.
In a few years, I see myself as a successful Senior Associate, leading a team and contributing to the growth of the company.
Leading a team of professionals and mentoring them to achieve their goals
Contributing to the growth of the company by bringing in new clients and expanding the business
Continuously learning and upgrading my skills to stay ahead in the industry
Building strong relationships with clients and colleagu...
Yes, I am able to work at night shift.
I have previous experience working night shifts
I am willing to adjust my schedule to accommodate night shifts
I understand the importance of being alert and focused during night shifts
posted on 25 Mar 2023
I applied via Referral and was interviewed before Mar 2022. There were 4 interview rounds.
posted on 19 Aug 2023
I applied via Referral and was interviewed in Feb 2023. There were 3 interview rounds.
Process refers to a series of actions or steps taken to achieve a particular goal or outcome.
Process involves a sequence of tasks or activities
It can be documented and standardized for consistency
Efficient processes can lead to improved productivity and quality
Examples: project management process, manufacturing process, recruitment process
posted on 16 Mar 2024
I applied via Approached by Company
Some of the top questions asked at the Neovatic Technologies Senior SAP Ppqm Consultant interview -
based on 1 review
Rating in categories
SAP MM Consultant
29
salaries
| ₹1.5 L/yr - ₹8.7 L/yr |
Associate Consultant
19
salaries
| ₹1.4 L/yr - ₹6 L/yr |
SAP Abap Consultant
19
salaries
| ₹3 L/yr - ₹10.9 L/yr |
SAP SD Consultant
18
salaries
| ₹2.6 L/yr - ₹11.7 L/yr |
SAP Basis Consultant
14
salaries
| ₹1.5 L/yr - ₹8.7 L/yr |
CMS IT Services
iMerit
Quantiphi Analytics Solutions Private Limited
PrimEra Medical Technologies