Filter interviews by
Be the first one to contribute and help others!
I applied via Naukri.com and was interviewed in Jan 2020. There were 3 interview rounds.
I appeared for an interview before Apr 2021.
IGV stands for Inlet Guide Vane in ID fan which controls the flow of air entering the fan.
IGV is a component of ID fan used to regulate the airflow entering the fan.
It helps in controlling the fan speed and maintaining the required pressure.
IGV is used in various industries like power plants, cement plants, and steel plants.
It is also used in HVAC systems to regulate the airflow in buildings.
Proper maintenance of IGV i
The flow of flue gas can be controlled by adjusting the damper position and regulating the fuel input.
Adjusting the damper position to control the amount of air entering the combustion chamber
Regulating the fuel input to control the temperature and pressure of the flue gas
Using a control system to monitor and adjust the flow of flue gas
Installing a scrubber to remove pollutants from the flue gas before releasing it int
I applied via Shine and was interviewed before Mar 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.
Developed a solution for optimizing a complex algorithm for a client in the finance industry
Client had a large dataset that needed to be processed quickly
Implemented parallel processing to speed up the algorithm
Optimized the code to reduce memory usage
Collaborated with the client to fine-tune the algorithm for their specific needs
I appeared for an interview before May 2021.
Round duration - 90 Minutes
Round difficulty - Medium
You are given a set of 'N' stones, each with a specific weight and color. The goal is to fill a knapsack with exactly 'M' stones, choosing one stone of each color, so that the to...
The goal is to fill a knapsack with exactly 'M' stones, choosing one stone of each color, minimizing the unused capacity.
Use dynamic programming to solve this problem efficiently.
Create a 2D array to keep track of the minimum unused capacity for each color and weight combination.
Iterate through the stones and colors to update the array with the minimum unused capacity.
Return the minimum unused capacity from the array a
Round duration - 24 hours
Round difficulty - Medium
Round duration - 25 minutes
Round difficulty - Easy
Tip 1 : have basic knowledge of web development
Tip 2 : have in depth understanding of workflow and tech stacks you use in your projects
Tip 1 : mention the skills you are comfortable to answer questions on
Tip 2 : have some projects with clear mention of your contribution to it on resume.
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Jul 2020. There were 3 interview rounds.
The design of a power plant involves various components and considerations to ensure efficient generation of electricity.
Power plants are designed to convert various energy sources into electricity.
The design includes selecting the appropriate type of power plant based on the energy source, such as coal, natural gas, nuclear, hydro, or renewable sources.
The design also involves determining the capacity and layout of th...
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
based on 6 reviews
Rating in categories
Information Technology Recruiter
6
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
HR Recruiter
4
salaries
| ₹3 L/yr - ₹4 L/yr |
US IT Recruiter
4
salaries
| ₹2.3 L/yr - ₹3 L/yr |
Software Engineer
3
salaries
| ₹3.5 L/yr - ₹6.5 L/yr |
Database Developer
3
salaries
| ₹3.8 L/yr - ₹5.8 L/yr |
Teleperformance
Optum Global Solutions
FIS
Nagarro