Round 1 - Technical 

(5 Questions)

  • Q1. What is mean by flexible concrete ? What is mean by admixtures ? What is the water cement ratio of workable concrete. ? What is the allowable slump for concrete ?
  • Ans. 

    Flexible concrete is a type of concrete that can bend without cracking or breaking.

    • Flexible concrete is achieved by using special fibers or polymers in the mix.

    • It is commonly used in construction of pavements, bridges, and other structures that may experience movement or vibration.

    • Admixtures are chemicals added to concrete to improve its properties, such as strength, workability, and durability.

    • Water cement ratio of wo...

  • Answered by AI
  • Q2. What is mean by line of colimation. ? What is the difference between price and cost?
  • Ans. 

    Line of colimation is an imaginary line connecting the crosshairs of a surveying instrument. Price is what you pay for a product, while cost includes all expenses associated with producing and selling the product.

    • Line of colimation is used in surveying to ensure accuracy in measurements

    • Price is the amount of money paid for a product or service

    • Cost includes all expenses associated with producing and selling the product,...

  • Answered by AI
  • Q3. What is EPC project?
  • Ans. 

    EPC stands for Engineering, Procurement, and Construction. It is a type of project delivery method commonly used in construction and engineering industries.

    • EPC projects involve a single contractor responsible for the entire project from design to construction.

    • The contractor is responsible for engineering, procurement of materials and equipment, and construction of the project.

    • EPC projects are commonly used in industrie...

  • Answered by AI
  • Q4. What is lumpsum contract?
  • Ans. 

    A lumpsum contract is a fixed-price contract where the contractor agrees to complete the project for a predetermined amount.

    • The contractor is responsible for completing the project within the agreed-upon budget.

    • Any cost overruns are the responsibility of the contractor.

    • This type of contract is commonly used in construction projects.

    • It provides the client with a clear idea of the total cost of the project upfront.

  • Answered by AI
  • Q5. What is a tender includes?
  • Ans. 

    A tender includes a detailed document that outlines the requirements, terms, and conditions of a project or service that needs to be completed.

    • A tender includes project specifications, such as the scope of work, timelines, and budget.

    • It also includes terms and conditions, such as payment terms, warranties, and penalties for non-compliance.

    • Tenders may also require bidders to submit additional documents, such as financia...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Should having market knowledge and experience what we learned. Therotical and practical. Should be confident to answer any questions. If doesn't know no problem.

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Project Management and Scrum
  • Q2. Team Management and appraisal

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for management questions. Team building questions.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What is the first task you typically complete when starting your work?
  • Ans. 

    I begin by assessing project requirements and stakeholder expectations to ensure alignment and clarity.

    • Review project documentation to understand scope and objectives.

    • Conduct stakeholder meetings to gather insights and expectations.

    • Identify key risks and constraints early on to plan mitigation strategies.

    • Establish communication channels for ongoing updates and feedback.

  • Answered by AI
  • Q2. What is the difference between a project charter and a project plan?
  • Ans. 

    A project charter outlines the project's purpose, while a project plan details how to achieve it.

    • The project charter is a high-level document that formally authorizes the project.

    • The project plan is a detailed roadmap that outlines tasks, timelines, and resources.

    • Example of a project charter: A document stating the goal to develop a new software application.

    • Example of a project plan: A Gantt chart showing the timeline

  • Answered by AI
  • Q3. How do you handle risk management in your projects?
  • Ans. 

    I implement a proactive risk management strategy to identify, assess, and mitigate risks throughout the project lifecycle.

    • Conduct a thorough risk assessment during project planning to identify potential risks.

    • Utilize a risk register to document and prioritize risks based on their impact and likelihood.

    • Engage stakeholders in risk identification workshops to gather diverse perspectives.

    • Implement risk mitigation strategie...

  • Answered by AI
  • Q4. Can you define the project life cycle for a project that you managed?
  • Ans. 

    The project life cycle includes initiation, planning, execution, monitoring, and closure phases.

    • Initiation: Defined project goals and objectives; for example, launching a new software product.

    • Planning: Developed a detailed project plan, including timelines and resource allocation.

    • Execution: Coordinated team efforts to implement the project plan; for instance, conducting regular team meetings.

    • Monitoring: Tracked progres...

  • Answered by AI
  • Q5. How do you address a situation where one of your team members is underperforming?
  • Ans. 

    I address underperformance through open communication, support, and tailored development plans to help team members improve.

    • Initiate a one-on-one conversation to understand the root cause of underperformance.

    • Provide constructive feedback, focusing on specific behaviors and outcomes rather than personal attributes.

    • Set clear, achievable goals and expectations to guide the team member's performance.

    • Offer resources and sup...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Read PMP
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Related job and skills
  • Q2. Tell me something about yourself?
  • Q3. Why should I hire you?
  • Q4. What was your strength
Round 3 - Technical 

(2 Questions)

  • Q1. Basic knowledge of some skills like MS EXCEL ,MS WORD ,MS POWERPOINT
  • Q2. Can you briefly tell us about the last project you worked on?

Interview Preparation Tips

Topics to prepare for HCLTech Senior Project Manager interview:
  • Communication Skills
  • MS Office
  • ms word
  • Excel
Interview preparation tips for other job seekers - Practice interview skills
Research the company
Informational interview
Create plan
Stay positive
Show how you add value
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Portal and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. 1. Share your entire experience in different roles. 2. What is the main reason you are looking for another job? 3. Tell us about some of the key achievement's in your current/last project 4. Kind of projec...
Round 2 - No 2nd round 

(1 Question)

  • Q1. Same as round 1
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Standard test, similar to DRDO kind of test preparation

Round 3 - Technical 

(1 Question)

  • Q1. Local variable, global variable, Oops concepts
Round 4 - HR 

(1 Question)

  • Q1. Standard - why do you want to join us, where do you see urselft 5 yrs from now, you are not from IT/CS stream then what value add you will bring

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive, confident & original in what you say
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Resource allocation with proper time and Utlization
  • Ans. 

    Resource allocation involves assigning the right people to the right tasks at the right time to maximize efficiency.

    • Understand project requirements and timelines before allocating resources

    • Consider the skills and strengths of team members when assigning tasks

    • Regularly monitor and adjust resource allocation based on project progress

    • Use tools like Gantt charts or project management software to track resource utilization

    • C...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - One must be open to newer tech stack roles

Interview Questionnaire 

2 Questions

  • Q1. Experience on handling projects /risk mgt/POA
  • Ans. 

    I have extensive experience in handling projects, risk management, and developing POA.

    • I have managed multiple projects simultaneously, ensuring timely delivery and quality output.

    • I have identified and mitigated potential risks by developing contingency plans.

    • I have developed and executed POA to achieve project goals and objectives.

    • I have experience in using project management tools such as JIRA, Trello, and Asana.

    • I hav...

  • Answered by AI
  • Q2. We need to be realistic and factful when we share any example. prepared well in advance for your previous projects exp and make sure you share all relevant things.

Interview Preparation Tips

Interview preparation tips for other job seekers - be factful , realistic and say no if you dont know.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What process followed to handle the Project Management in your current organization.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Mostly project management concepts
Round 2 - One-on-one 

(1 Question)

  • Q1. Project management concepts, PMP based

MVK Associates Interview FAQs

How many rounds are there in MVK Associates Senior Project Manager interview?
MVK Associates interview process usually has 2 rounds. The most common rounds in the MVK Associates interview process are Resume Shortlist and Technical.
What are the top questions asked in MVK Associates Senior Project Manager interview?

Some of the top questions asked at the MVK Associates Senior Project Manager interview -

  1. What is mean by flexible concrete ? What is mean by admixtures ? What is the wa...read more
  2. What is mean by line of colimation. ? What is the difference between price and ...read more
  3. What is a tender includ...read more

Tell us how to improve this page.

MVK Associates Senior Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Accountant
5 salaries
unlock blur

₹1 L/yr - ₹2 L/yr

Account Assistant
5 salaries
unlock blur

₹1 L/yr - ₹3.1 L/yr

Audit Executive
4 salaries
unlock blur

₹3.6 L/yr - ₹6 L/yr

Partner
3 salaries
unlock blur

₹27 L/yr - ₹27 L/yr

Civil Engineer
3 salaries
unlock blur

₹2.4 L/yr - ₹4.2 L/yr

Explore more salaries
Compare MVK Associates with

TCS

3.7
Compare

Accenture

3.8
Compare

Wipro

3.7
Compare

Cognizant

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview