Filter interviews by
My strong area is in software development, particularly in backend development and database management.
Experienced in designing and implementing scalable backend systems
Proficient in various programming languages such as Java, Python, and SQL
Skilled in optimizing database performance and data modeling
Have successfully led and delivered complex software projects on time
Some problem analysing tools include Fishbone Diagram, 5 Whys, SWOT Analysis, and Root Cause Analysis.
Fishbone Diagram
5 Whys
SWOT Analysis
Root Cause Analysis
I have learned various technical basics including engineering principles, materials science, and project management during my studies.
Understanding of fundamental engineering principles such as statics and dynamics.
Knowledge of materials science, including properties of metals, polymers, and composites.
Experience with CAD software for designing and modeling engineering projects.
Familiarity with project management ...
Manpower can be handled by effective communication, training, delegation, and motivation.
Communicate clear expectations and goals
Provide necessary training and resources
Delegate tasks based on skills and strengths
Motivate through recognition and rewards
Address any performance issues promptly
Encourage teamwork and collaboration
Vernier least count is the smallest measurement that can be made using a Vernier scale.
Vernier least count is determined by the difference between one main scale division and one Vernier scale division.
It helps in increasing the accuracy of measurements made using a Vernier scale.
For example, if the main scale has divisions of 1 mm and the Vernier scale has divisions of 0.1 mm, the least count would be 0.1 mm.
The least count of a micrometer is the smallest measurement that can be accurately read on the micrometer scale.
The least count is determined by the number of divisions on the micrometer scale and the pitch of the screw.
It is usually expressed in micrometers or millimeters.
For example, if a micrometer has 50 divisions on the scale and the pitch of the screw is 0.5 mm, then the least count would be 0.01 mm (0.5 mm ...
Root cause analysis identifies the underlying reasons for defects or problems to prevent recurrence.
Use the 5 Whys technique: Ask 'why' repeatedly to drill down to the root cause. Example: Why did the machine fail? Because it overheated. Why did it overheat? Because it lacked lubrication.
Employ Fishbone diagrams to visualize potential causes. Example: Categorize causes into people, processes, materials, and equipm...
Gear manufacturing is the process of creating gears for various applications.
It involves cutting, shaping, and finishing metal or plastic to create gears of different sizes and shapes.
Gears can be manufactured using various methods such as hobbing, shaping, milling, and broaching.
The manufacturing process requires precision and accuracy to ensure the gears function properly.
Gears are used in a variety of applicati...
Vernier caliper is a measuring tool used to measure the length, diameter, and thickness of objects.
It has two jaws, one fixed and one movable, which can be adjusted to fit the object being measured.
It has a main scale and a vernier scale, which allows for precise measurements.
It can measure both internal and external dimensions.
It is commonly used in engineering, machining, and woodworking.
Example: measuring the d...
Customer complaints and audits can be handled by addressing the root cause, providing corrective actions, and ensuring continuous improvement.
Listen to the customer's complaint and empathize with their situation
Investigate the issue thoroughly to identify the root cause
Provide corrective actions to prevent the issue from recurring
Communicate the corrective actions to the customer and follow up to ensure satisfacti...
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
I bring a wealth of experience, expertise, and a proven track record of delivering high-quality engineering solutions.
Over 10 years of experience in engineering roles
Strong technical skills in [specific technologies/tools]
Proven track record of successfully leading and delivering complex projects
Excellent problem-solving and analytical skills
Strong communication and collaboration abilities
Passionate about continuous le...
My strong area is in software development, particularly in backend development and database management.
Experienced in designing and implementing scalable backend systems
Proficient in various programming languages such as Java, Python, and SQL
Skilled in optimizing database performance and data modeling
Have successfully led and delivered complex software projects on time
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
Basically question were asked from diploma
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
The last breakdown was related to hydraulic systems.
The breakdown occurred due to a leak in the hydraulic system.
The hydraulic symbols were used to identify and troubleshoot the issue.
The maintenance engineer had to repair or replace the faulty hydraulic component.
Proper maintenance and regular inspections can help prevent future breakdowns.
MTTR stands for Mean Time To Repair, which is a measure of the average time it takes to repair a machine or equipment.
MTTR is an important metric used in maintenance engineering to assess the efficiency of maintenance processes.
It is calculated by dividing the total downtime by the number of repairs performed.
A lower MTTR indicates a more efficient maintenance process and better equipment reliability.
MTTR can be used t...
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Customer complaints and audits can be handled by addressing the root cause, providing corrective actions, and ensuring continuous improvement.
Listen to the customer's complaint and empathize with their situation
Investigate the issue thoroughly to identify the root cause
Provide corrective actions to prevent the issue from recurring
Communicate the corrective actions to the customer and follow up to ensure satisfaction
Pre...
Manpower can be handled by effective communication, training, delegation, and motivation.
Communicate clear expectations and goals
Provide necessary training and resources
Delegate tasks based on skills and strengths
Motivate through recognition and rewards
Address any performance issues promptly
Encourage teamwork and collaboration
Problem solving of major rejection
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
Top trending discussions
The duration of Musashi Auto Parts interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 41 interview experiences
Difficulty level
Duration
based on 765 reviews
Rating in categories
Assistant Engineer
636
salaries
| ₹2 L/yr - ₹5.7 L/yr |
Engineer
183
salaries
| ₹2.8 L/yr - ₹6.6 L/yr |
Assistant Manager
138
salaries
| ₹6.5 L/yr - ₹14.2 L/yr |
Deputy Manager
89
salaries
| ₹7.3 L/yr - ₹17 L/yr |
Production Engineer
82
salaries
| ₹2.2 L/yr - ₹7.1 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Belrise Industries
Krishna Maruti