Filter interviews by
posted on 13 Oct 2020
I applied via Recruitment Consultant and was interviewed before Oct 2019. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed before Aug 2020. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
posted on 19 Jan 2018
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
Improving communication and personality requires self-awareness, active listening, and continuous learning.
Practice active listening to understand others' perspectives
Be aware of your own communication style and adjust as needed
Seek feedback and be open to constructive criticism
Read books or take courses on communication and interpersonal skills
Practice empathy and emotional intelligence
Be respectful and courteous in a
First impressions can be shown through body language, attire, and communication skills.
Body language can convey confidence or nervousness
Attire can show professionalism or lack thereof
Communication skills can demonstrate intelligence and articulation
Eye contact and a firm handshake can also make a positive impression
posted on 23 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
I have a valid driver's license for both cars and motorcycles.
I have a Class C license for cars
I also have a Class M license for motorcycles
I have a clean driving record with no accidents or violations
I ride a road bike for commuting and a mountain bike for leisure.
I prefer road bikes for their speed and efficiency on paved roads.
I enjoy mountain biking for the challenge and adventure of off-road trails.
I also have experience with hybrid bikes for their versatility.
I prioritize safety and always wear a helmet and follow traffic laws.
I have participated in charity rides and group rides for fun and community.
Vehicle testing involves various methods to ensure safety, performance, and compliance with regulations.
Testing can include physical tests such as crash tests, durability tests, and performance tests.
Simulation and modeling can also be used to test vehicle components and systems.
Testing must comply with regulations set by organizations such as the National Highway Traffic Safety Administration (NHTSA) and the European
We conduct various types of homologation testing depending on the product and its intended market.
We conduct safety testing to ensure compliance with local regulations.
We perform emissions testing to ensure compliance with environmental regulations.
We conduct performance testing to ensure the product meets the required standards.
We also conduct durability testing to ensure the product can withstand the expected wear an...
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurement...
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing fail...
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The ...
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
T...
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of...
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
Production Engineer
50
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Engineer
45
salaries
| ₹4.1 L/yr - ₹7.4 L/yr |
Assistant Manager
40
salaries
| ₹5.8 L/yr - ₹10.2 L/yr |
Quality Engineer
38
salaries
| ₹1.4 L/yr - ₹4.4 L/yr |
Engineer
35
salaries
| ₹3 L/yr - ₹5.6 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda