posted on 27 Nov 2019
I applied via Company Website and was interviewed in Oct 2019. There were 3 interview rounds.
Flywheel work refers to the energy stored in a rotating mass that helps maintain a constant speed in a machine.
Flywheel work is the energy stored in a rotating mass that helps maintain a constant speed in a machine
It is used in machines such as engines, turbines, and generators
The flywheel absorbs excess energy during the power stroke and releases it during the compression stroke
It helps to reduce fluctuations in speed...
OEE calculates the overall efficiency of a production process.
OEE stands for Overall Equipment Effectiveness
It takes into account three factors: availability, performance, and quality
It is calculated by multiplying the three factors together
OEE can be used to identify areas for improvement in a production process
Top trending discussions
I was interviewed in Dec 2024.
If you encounter a problem while answering, please consult your friends sitting nearby.
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
I implemented new production processes and technologies to improve efficiency and quality.
Introduced automated systems to streamline production processes
Implemented lean manufacturing principles to reduce waste and improve productivity
Led training sessions for employees to ensure smooth transition to new processes
Collaborated with cross-functional teams to identify areas for improvement
I applied via Recruitment Consulltant
Glass manufacturing involves melting raw materials, shaping the molten glass, and cooling it to form the final product.
Raw materials such as silica sand, soda ash, and limestone are melted in a furnace at high temperatures.
The molten glass is then shaped using various techniques like blowing, pressing, or drawing.
The shaped glass is cooled slowly in an annealing oven to relieve internal stresses and strengthen the glas...
posted on 17 Dec 2024
I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.
posted on 28 Dec 2024
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the ratio of operating time to planned production time.
Performance is the ratio of actual production to maximum possible production.
Quality is the ratio of good parts to total parts produced.
OEE = Availability x Performa...
G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.
G code is used to control the movements of the machine, such as linear or circular interpolation.
M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.
G codes are typically used for positioning and feed rate control, while M codes are used for...
I have used software to create programs.
I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.
Using software allows for more precise and efficient programming compared to manual methods.
Software also helps in simulating and testing programs before implementation.
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
Assembly BIW production process involves various parameters to ensure weld quality.
Ensure proper fit-up of components before welding
Maintain correct welding parameters such as voltage, current, and travel speed
Use appropriate shielding gas and welding consumables
Regularly inspect and maintain welding equipment
Implement quality control measures such as visual inspection and non-destructive testing
Assistant Manager
53
salaries
| ₹5.8 L/yr - ₹10.2 L/yr |
Production Engineer
46
salaries
| ₹2 L/yr - ₹4.4 L/yr |
Senior Engineer
44
salaries
| ₹4.1 L/yr - ₹7.4 L/yr |
Quality Engineer
38
salaries
| ₹1.4 L/yr - ₹4.4 L/yr |
Engineer
37
salaries
| ₹2.6 L/yr - ₹5 L/yr |
Hero MotoCorp
TVS Motor
Bajaj Auto
Mahindra & Mahindra