user image Anonymous

posted on 5 Oct 2021

I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Experience and exposure to purchasing
  • Q2. Iron and steel project and Beneficiation projects exposure
  • Q3. Worst one , HR follow up and pressurise till resignationjoin and ask for joining ASAP but careful they ask and do similar tactics to other 2-3 candidate to join like this and they will ditch or they will ...

Interview Preparation Tips

Interview preparation tips for other job seekers - No technology or technical discussion as interviewer is in lack of knowledge

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Firing order in 6 cylinder engine
  • Ans. 

    The firing order in a 6 cylinder engine refers to the sequence in which each cylinder fires.

    • The firing order is determined by the engine design and is usually specified by the manufacturer.

    • It is important to follow the correct firing order to ensure proper engine performance and minimize vibrations.

    • The firing order can be found in the engine's service manual or by contacting the manufacturer.

    • For example, a common firin

  • Answered by AI
  • Q2. What is rpm turbo
  • Ans. 

    RPM turbo refers to the revolutions per minute of a turbocharger, which measures how fast the turbocharger's turbine is spinning.

    • RPM turbo is a measure of the speed at which a turbocharger's turbine is rotating

    • It indicates the efficiency and power output of the turbocharger

    • Higher RPM turbo values generally result in increased boost pressure and engine performance

    • For example, a turbo with an RPM turbo of 10,000 would sp

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2019. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About your self
  • Q2. How to execute desputes between contractor and company
  • Ans. 

    Disputes can be resolved through negotiation, mediation, arbitration or litigation.

    • Negotiation involves discussion and compromise to reach a mutually acceptable solution.

    • Mediation involves a neutral third party who helps the parties reach a settlement.

    • Arbitration involves a neutral third party who makes a binding decision after hearing both sides.

    • Litigation involves taking the dispute to court and having a judge or jur...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain your confidence level and be positive & learning attitude
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What are the main objects of project?
  • Ans. 

    The main objects of the project are to achieve specific goals, deliverables, and outcomes within a set timeframe and budget.

    • Define clear project objectives and scope

    • Identify key deliverables and milestones

    • Allocate resources effectively

    • Monitor progress and adjust plans as needed

    • Ensure project goals align with organizational objectives

  • Answered by AI
  • Q2. How you will handle the conflict while doing projects
Round 2 - HR 

(1 Question)

  • Q1. Why you want to switch job
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why SF6 gas use in GIS not other gas?
  • Ans. 

    SF6 gas is used in GIS due to its excellent insulating properties and high dielectric strength.

    • SF6 gas has high dielectric strength, making it an excellent insulator for high voltage equipment like GIS

    • SF6 gas is non-toxic, non-flammable, and chemically stable, making it a safe choice for GIS

    • SF6 gas has a high global warming potential, but its use in GIS is tightly regulated to minimize emissions

    • Other gases like nitroge...

  • Answered by AI
  • Q2. Which type of conductor use in Transmission line?
  • Ans. 

    Various types of conductors are used in transmission lines depending on the application.

    • Aluminum conductors are commonly used due to their lightweight and low cost.

    • Copper conductors are used in high voltage and high current applications.

    • ACSR (Aluminum Conductor Steel Reinforced) conductors are used for long distance transmission lines.

    • High-temperature conductors like AAAC (All Aluminum Alloy Conductors) are used in are...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good company, please join with this company. I suggest to everyone joined with this organization for better future.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Asking about integrated Steel plant.
  • Q2. Asking specific past experience of your jobs profile.

Interview Preparation Tips

Topics to prepare for Mecon Executive interview:
  • Integrated Steel plant O&M
Interview preparation tips for other job seekers - Dnt worry about interview, only confidence require in interview.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About Blast Furnace and Operation details
  • Q2. Question about my previous experience and what kind of problem I faced there

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst working experience ever faced before . Mecon have bad management in NMDC site . Salary delay Lake of HR support and all this things happen with me .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Brief about your current profile.
Round 3 - HR 

(1 Question)

  • Q1. What is the reason for change

Manager Interview Questions & Answers

Metso user image Anonymous

posted on 27 Apr 2024

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. General HR Questions
Round 2 - Group Discussion 

As per JD and current experience

Round 3 - One-on-one 

(1 Question)

  • Q1. As per JD and experience and expectations

Manager Interview Questions & Answers

Metso user image Anonymous

posted on 24 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Mining industry related questions

MSPL Interview FAQs

What are the top questions asked in MSPL Purchaser interview?

Some of the top questions asked at the MSPL Purchaser interview -

  1. Worst one , HR follow up and pressurise till resignationjoin and ask for joinin...read more
  2. Iron and steel project and Beneficiation projects expos...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Metso Interview Questions
4.2
 • 66 Interviews
Mecon Interview Questions
3.9
 • 43 Interviews
Hindustan Zinc Interview Questions
3.8
 • 43 Interviews
View all
Assistant Manager
38 salaries
unlock blur

₹4.4 L/yr - ₹12.9 L/yr

Deputy Manager
22 salaries
unlock blur

₹6 L/yr - ₹14.5 L/yr

Engineer
17 salaries
unlock blur

₹2.4 L/yr - ₹5.8 L/yr

Mechanical Engineer
15 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Senior Engineer
14 salaries
unlock blur

₹4.5 L/yr - ₹8 L/yr

Explore more salaries
Compare MSPL with

Hindustan Zinc

3.8
Compare

Vedanta Aluminium

3.9
Compare

Vedanta Resources

3.7
Compare

Carborundum Universal Limited

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview