I applied via Approached by Company and was interviewed before Sep 2023. There were 2 interview rounds.
Revit tool test and questions related to BIM
Generator size and transformer size are determined based on the power requirements and load characteristics of the system.
Generator size is determined by the power requirements of the system, taking into account factors such as peak load, average load, and efficiency.
Transformer size is determined by the voltage and current requirements of the system, as well as the power factor and impedance of the load.
It is importan...
I was interviewed in Apr 2023.
Top trending discussions
I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.
It depends on the region, for me they conducted tool test in the 1st round.
I was interviewed in May 2023.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
Some of the top questions asked at the Mott MacDonald Electrical Engineer interview for experienced candidates -
based on 2 interviews
Interview experience
based on 15 reviews
Rating in categories
Mechanical Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Consultant
37
salaries
| ₹0 L/yr - ₹0 L/yr |
IT Analyst
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Consultant
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
Arup