I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.
Noise is unwanted random fluctuations in a signal, while signal is the desired information being transmitted.
Noise is random and unwanted interference in a signal
Signal is the desired information being transmitted
Noise can distort or degrade the quality of a signal
Signal is the meaningful data that is being communicated
Examples: static on a radio (noise) vs. music being played (signal)
Audio signals are variations in air pressure that are converted into electrical signals by a microphone and then processed and amplified to produce sound.
Audio signals are variations in air pressure caused by sound waves.
Microphones convert these variations into electrical signals.
The electrical signals are then processed and amplified to produce sound.
Examples of audio signals include music, speech, and environmental
The equation for a time domain signal can be converted into the frequency domain using Fourier transform.
The equation for a time domain signal is typically represented as x(t) or f(t).
To convert this signal into the frequency domain, we can use Fourier transform which decomposes the signal into its constituent frequencies.
The Fourier transform equation is given by X(f) = ∫[x(t) * e^(-j2πft)] dt, where X(f) represents t...
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
I applied via Approached by Company
Various t-codes are used in SAP MM module for different purposes.
MM01 - Create Material Master
MM02 - Change Material Master
MM03 - Display Material Master
ME21N - Create Purchase Order
ME22N - Change Purchase Order
ME23N - Display Purchase Order
MIGO - Goods Movement
MIRO - Invoice Verification
MB51 - Material Document List
ME2N - Purchase Orders by PO Number
ME2M - Purchase Orders by Material
ME2L - Purchase Orders by Vendor
ME2
Coding test was on a hacker rank platform
Fair enough with good focus on os and dbms
I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 3 interview rounds.
Yes
Yes, I have audited suppliers and conducted vendor visits.
During my previous role as a Senior Engineer, I was responsible for auditing suppliers to ensure compliance with quality standards and specifications.
I have also conducted vendor visits to assess their capabilities, production processes, and quality control measures.
These audits and visits helped in identifying potential risks, improving supplier performance,...
based on 1 interview
Interview experience
Assistant Engineer
972
salaries
| ₹1 L/yr - ₹5.1 L/yr |
Engineer
646
salaries
| ₹1.8 L/yr - ₹7 L/yr |
Assistant Manager
579
salaries
| ₹4 L/yr - ₹13.8 L/yr |
Production Engineer
485
salaries
| ₹1.1 L/yr - ₹6 L/yr |
Senior Engineer
483
salaries
| ₹2.8 L/yr - ₹9 L/yr |
Bosch
JBM Group
MRF Tyres
Ceat Tyres