Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 2 interview rounds.
To troubleshoot LAN connectivity, check physical connections, IP settings, network adapter settings, and firewall settings.
Check physical connections such as cables and ports
Verify IP settings such as IP address, subnet mask, and default gateway
Check network adapter settings such as DNS server and DHCP settings
Verify firewall settings to ensure they are not blocking network traffic
Use network diagnostic tools such as p...
To troubleshoot in Outlook, check for connectivity issues, repair the application, and verify account settings.
Check internet connectivity and server status
Repair Outlook application using built-in repair tool
Verify account settings such as username, password, and server information
Check for any add-ins causing issues
Clear cache and temporary files
Disable antivirus temporarily to check if it's causing issues
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
I applied via Approached by Company
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
What are the projects done by you in your current company
I appeared for an interview before Mar 2024.
Past experience based questions
Various t-codes are used in SAP MM module for different purposes.
MM01 - Create Material Master
MM02 - Change Material Master
MM03 - Display Material Master
ME21N - Create Purchase Order
ME22N - Change Purchase Order
ME23N - Display Purchase Order
MIGO - Goods Movement
MIRO - Invoice Verification
MB51 - Material Document List
ME2N - Purchase Orders by PO Number
ME2M - Purchase Orders by Material
ME2L - Purchase Orders by Vendor
ME2
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Engineer
852
salaries
| ₹1 L/yr - ₹5.4 L/yr |
Engineer
649
salaries
| ₹1.8 L/yr - ₹7 L/yr |
Assistant Manager
579
salaries
| ₹4 L/yr - ₹13.8 L/yr |
Senior Engineer
483
salaries
| ₹2.8 L/yr - ₹9 L/yr |
Production Engineer
483
salaries
| ₹1.1 L/yr - ₹6.3 L/yr |
Bosch
JBM Group
MRF Tyres
Ceat Tyres