Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Montecarlo Construction Team. If you also belong to the team, you can get access from here

Montecarlo Construction Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 355 Reviews

Filter interviews by

Montecarlo Construction Senior Construction Manager Interview Questions and Answers

Updated 14 Jan 2022

Montecarlo Construction Senior Construction Manager Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed before Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Related structures works.
  • Q2. Related Bridges, Flyovers, Railway Bridges etc.
  • Q3. Related Road Projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - My advice is Online interview one is Zoom option.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Enclosure Required to start Interior Fitout or not
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Past Experience & Salary Negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Clarity on Project & Job Responsibility for your Valuable Guidance
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Asked any type of fild experience questions based on civil construction fild.
Round 3 - Aptitude Test 

Questions upon aptitude.

Round 4 - Assignment 

Project details with cost.

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Per m3 how much numbers brick required
  • Ans. 

    The number of bricks required per cubic meter varies depending on the size and type of brick used.

    • The number of bricks required per cubic meter can range from 400 to 700 depending on the size and type of brick.

    • For example, standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.

    • Larger or smaller bricks will require more or fewer bricks per cubic meter respectively.

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Personal details asking

Interview Preparation Tips

Interview preparation tips for other job seekers - Congratulate all of you, very very fantastic company for construction work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Acquaintances with Minor irrigation systems
  • Ans. 

    I have experience working with minor irrigation systems, including design, installation, and maintenance.

    • Designed irrigation systems for small-scale agricultural projects

    • Installed drip irrigation systems for gardens and landscaping

    • Performed routine maintenance on irrigation pumps and pipes

    • Troubleshooted and repaired irrigation system malfunctions

  • Answered by AI
  • Q2. QA and QC related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is EVM and significance of EVM
  • Ans. 

    EVM stands for Earned Value Management. It is a project management technique used to track the performance and progress of a project.

    • EVM integrates project scope, schedule, and cost to provide a comprehensive view of project performance.

    • It helps in measuring project performance against the baseline plan and identifying variances.

    • Key EVM metrics include Planned Value (PV), Earned Value (EV), Actual Cost (AC), Cost Perfo...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

Job specific questions.

Round 3 - HR 

(3 Questions)

  • Q1. Regarding skill and why you're join this firm.
  • Q2. Why you'rejoin this firm.
  • Q3. Why you left previous company
Round 4 - Technical 

(3 Questions)

  • Q1. Only job related question as per your designation.
  • Q2. What we should do when any emergency come during job.
  • Q3. How many tons load taken a single weld tick .
  • Ans. 

    The load taken by a single weld tick depends on various factors such as the type of weld, material being welded, and welding technique.

    • The load taken by a single weld tick can vary depending on the type of weld being used (e.g. fillet weld, groove weld, plug weld).

    • The material being welded also plays a significant role in determining the load capacity of a single weld tick.

    • The welding technique and quality of the weld ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always talk politely and clear pitch and experience more than 6 years.

Interview Questionnaire 

2 Questions

  • Q1. Define what is quality
  • Ans. 

    Quality is meeting or exceeding customer expectations through consistent and reliable performance.

    • Quality is a measure of how well a product or service meets the needs and expectations of the customer.

    • It involves meeting or exceeding established standards and specifications.

    • Quality is achieved through consistent and reliable performance, attention to detail, and continuous improvement.

    • Examples of quality in constructio...

  • Answered by AI
  • Q2. What is the construction cost per sqm/sft for a commercial complex
  • Ans. 

    The construction cost per sqm/sft for a commercial complex varies depending on location, materials used, and other factors.

    • Factors affecting cost include location, materials, labor, and design

    • In the US, the average cost for a commercial building is $150-$200 per sqft

    • In India, the cost can range from INR 1500-5000 per sqft depending on location and materials

    • It's important to consider long-term maintenance and operating

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Project Cost analysis
  • Q2. How to calculate labor cost
  • Ans. 

    Labor cost can be calculated by multiplying the total hours worked by the labor rate.

    • Determine the total hours worked by each laborer

    • Identify the labor rate per hour

    • Multiply the total hours worked by the labor rate to get the labor cost

    • Consider any additional costs such as benefits or overtime pay

  • Answered by AI
  • Q3. How to calculate material cost
  • Ans. 

    Material cost can be calculated by determining the quantity of materials needed and multiplying it by the unit cost of each material.

    • Determine the quantity of each material needed for the project

    • Obtain the unit cost of each material

    • Multiply the quantity of each material by its unit cost to get the total cost

    • Add up the total cost of all materials to get the overall material cost

  • Answered by AI
  • Q4. Quality control
  • Q5. Requirement of organisational

Interview Preparation Tips

Interview preparation tips for other job seekers - For senior level Please find another company …

But junior level it’s okay

Montecarlo Construction Interview FAQs

What are the top questions asked in Montecarlo Construction Senior Construction Manager interview?

Some of the top questions asked at the Montecarlo Construction Senior Construction Manager interview -

  1. Related Bridges, Flyovers, Railway Bridges e...read more
  2. Related structures wor...read more
  3. Related Road Projec...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 722 Interviews
Tata Projects Interview Questions
4.2
 • 414 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AECOM Interview Questions
4.3
 • 111 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
View all
Assistant Manager
66 salaries
unlock blur

₹6 L/yr - ₹10.2 L/yr

Assistant Engineer
47 salaries
unlock blur

₹2.1 L/yr - ₹4.2 L/yr

Deputy Manager
37 salaries
unlock blur

₹8.5 L/yr - ₹12 L/yr

Senior Engineer
35 salaries
unlock blur

₹4.8 L/yr - ₹8 L/yr

Engineer
21 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Explore more salaries
Compare Montecarlo Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview