Technical, legal and statutory requirements of a boiler
Technical requirements include proper installation, maintenance, and operation of the boiler
Legal requirements include obtaining necessary permits and complying with safety regulations
Statutory requirements include regular inspections and adherence to industry standards
Examples of technical requirements include proper ventilation and fuel supply
Examples of legal re...
IBR recommends various measures for safe running of boilers.
Regular inspection and maintenance of the boiler
Ensuring proper water level and pressure
Using high-quality fuel and maintaining proper combustion
Regular cleaning of the boiler and its components
Following safety guidelines and procedures
Training and certification of boiler operators
Maintaining proper records and documentation
ARC stands for Adaptive Replacement Cache. It is used for efficient caching of data in computer systems.
ARC is a caching algorithm used in computer systems to improve performance.
It is designed to adapt to changing workloads and optimize cache usage.
ARC maintains two lists, one for recently used items and another for frequently used items.
It dynamically adjusts the size of each list based on the workload.
ARC is used in...
I appeared for an interview in Aug 2024.
I worked in a company that specialized in designing and implementing electrical systems for commercial buildings.
Designed electrical systems for commercial buildings
Implemented electrical systems according to specifications
Collaborated with architects and contractors to ensure smooth project execution
I applied via Walk-in and was interviewed in Sep 2024. There was 1 interview round.
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Yes, I have previously worked as a software engineer for 5 years at XYZ company.
Worked as a software engineer for 5 years at XYZ company
Experience in developing web applications using Java and Angular
Collaborated with cross-functional teams to deliver projects on time
Monomark Engineering interview questions for popular designations
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
A bearing puller is used to remove the bearing.
A bearing puller is a specialized tool designed to safely and efficiently remove bearings from their housing.
It consists of a central screw or rod that applies force to the bearing, along with arms or jaws that grip the bearing and allow it to be pulled out.
The arms or jaws of the bearing puller are adjustable to accommodate different sizes of bearings.
Some bearing pullers...
There are 25.4 mm in 1 inch.
1 inch is equal to 25.4 millimeters.
The conversion factor from inches to millimeters is 25.4.
To convert inches to millimeters, multiply the number of inches by 25.4.
For example, 2 inches is equal to 50.8 millimeters (2 x 25.4).
The list count of vernier refers to the number of divisions on the vernier scale.
The list count of vernier is typically determined by the number of divisions on the vernier scale.
It is used to measure the difference between the main scale and the vernier scale.
The list count can vary depending on the precision required for the measurement.
For example, a vernier caliper may have a list count of 20 divisions on the verni
I applied via Referral and was interviewed in Apr 2022. There was 1 interview round.
Top trending discussions
posted on 6 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
based on 14 interviews
Interview experience
based on 136 reviews
Rating in categories
Mechanical Engineer
35
salaries
| ₹2 L/yr - ₹5 L/yr |
Safety Officer
17
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Electrical Engineer
17
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
HR Executive
11
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Instrument Engineer
11
salaries
| ₹3 L/yr - ₹5 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon