Filter interviews by
Clear (1)
I applied via Recruitment Consulltant and was interviewed in Dec 2021. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness and is a measure of how effectively equipment is being utilized.
OEE takes into account three factors: availability, performance, and quality.
Availability refers to the amount of time the equipment is available for use.
Performance refers to how efficiently the equipment is running.
Quality refers to the number of good units produced by the equipment.
OEE is calculated by mult...
Improving productivity in manufacturing involves optimizing processes, reducing waste, and investing in technology.
Analyze current processes and identify areas for improvement
Implement lean manufacturing principles to reduce waste and increase efficiency
Invest in automation and technology to streamline production
Provide training and development opportunities for employees to improve skills and knowledge
Establish clear ...
Handling unionized manpower requires effective communication, negotiation, and collaboration.
Establish open communication channels with union representatives
Negotiate fair and reasonable terms for both parties
Collaborate with union leaders to address any issues or concerns
Ensure compliance with labor laws and regulations
Provide opportunities for employee feedback and involvement
Maintain a positive and respectful work e...
Operational excellence is the continuous improvement of processes and systems to achieve maximum efficiency and effectiveness.
It involves identifying and eliminating waste and inefficiencies in processes
It focuses on improving quality, reducing costs, and increasing productivity
It requires a culture of continuous improvement and employee engagement
Examples include Lean Six Sigma, Total Quality Management, and Kaizen
Ope...
I applied via Approached by Company and was interviewed in Nov 2021. There was 1 interview round.
Flow of change control refers to the process of managing changes to a project or system.
Change requests are submitted and reviewed by a change control board
The board evaluates the impact of the change and decides whether to approve or reject it
If approved, the change is implemented and tested
Documentation is updated to reflect the change
The change control process ensures that changes are made in a controlled and system
Inprocess check failure of metal detector can be handled by following proper procedures and protocols.
Immediately stop the production line and isolate the affected product.
Investigate the cause of the failure and take corrective actions.
Notify the quality control department and involve them in the investigation.
Conduct a thorough inspection of the metal detector and ensure it is functioning properly before resuming pro...
Factors affecting weight variation during compression include formulation, equipment, and process parameters.
Formulation: particle size, shape, and density, excipient type and concentration
Equipment: type of tablet press, tooling, and compression force
Process parameters: compression speed, dwell time, and pre-compression force
Example: changing the excipient concentration can affect the weight variation of tablets
Exampl...
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jul 2023. There were 2 interview rounds.
I applied via LinkedIn and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
CSV stands for Computer System Validation, which is a process used to ensure that a computerized system is fit for its intended use. Agile and V-Model are software development methodologies.
CSV involves documenting and testing the system to ensure it meets regulatory requirements.
Agile is a flexible and iterative approach to software development, focusing on delivering working software frequently.
V-Model is a software ...
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
ERP implementation strategies involve careful planning, stakeholder involvement, training, and monitoring.
Identify business needs and goals before selecting an ERP system.
Involve key stakeholders from different departments in the decision-making process.
Provide comprehensive training to employees to ensure successful adoption of the new system.
Monitor progress regularly and make adjustments as needed to ensure smooth i...
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
Humidity chambers maintain temperature and relative humidity through a combination of heating, cooling, and humidification systems.
Humidity chambers use a combination of heating and cooling systems to control temperature.
Humidification systems are used to control the relative humidity inside the chamber.
Temperature and humidity sensors are used to monitor and adjust the conditions as needed.
Examples of humidification s...
I would first check the equipment for any malfunctions, adjust settings if necessary, and calibrate the humidity sensor.
Check the equipment for any malfunctions or leaks
Adjust settings on the humidity chamber to reach the desired humidity level
Calibrate the humidity sensor to ensure accurate readings
Monitor the humidity levels regularly to maintain the desired range
I applied via Referral and was interviewed in Nov 2021. There were 3 interview rounds.
based on 20 reviews
Rating in categories
Executive
851
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
597
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
363
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
359
salaries
| ₹0 L/yr - ₹0 L/yr |
Research Associate
258
salaries
| ₹0 L/yr - ₹0 L/yr |
Sun Pharmaceutical Industries
Cipla
DRJ & CO
Biocon Limited