Filter interviews by
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
A hanging scaffold with beam coupler can be built by following these steps:
Select the appropriate beam couplers based on the weight and size of the scaffold
Attach the beam couplers to the scaffold tubes using bolts and nuts
Attach the scaffold tubes to the beam couplers using pins
Ensure that the scaffold is level and secure before use
Top trending discussions
The person can escape the island by creating a firebreak or finding a body of water.
Create a firebreak by clearing a path of grass around oneself to prevent the fire from spreading.
Look for a body of water such as a lake, river, or ocean to escape the fire.
If no water source is available, try to find a sheltered area with less dry grass to wait for the fire to pass.
Use any available tools or materials to help create a
Caching is the process of storing frequently used data in a temporary storage to reduce access time. LRU caching removes least recently used data.
Caching improves performance by reducing access time to frequently used data
LRU (Least Recently Used) caching removes the least recently used data to make space for new data
LRU cache can be implemented using a doubly linked list and a hash map
When a cache hit occurs, the acce...
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Site Manager
4
salaries
| ₹4.8 L/yr - ₹6.6 L/yr |
Scaffolding Inspector
4
salaries
| ₹5.4 L/yr - ₹7.5 L/yr |
Software Developer
3
salaries
| ₹7.2 L/yr - ₹16.2 L/yr |
Site Engineer
3
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Credit Controller
3
salaries
| ₹4.2 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company