Billing detail RCC structre work
Rate analysis for running site involves calculating the cost of various activities on the construction site.
Rate analysis involves breaking down the cost of materials, labor, equipment, and overhead for each activity on the site.
It helps in determining the total cost of the project and making informed decisions on resource allocation.
Examples of activities for rate analysis include excavation, concrete work, masonry, p
Top trending discussions
posted on 15 Aug 2024
A Gantt chart is a visual representation of a project schedule that shows the start and finish dates of various elements of the project.
Gantt charts are used to plan, schedule, and track project progress
They show tasks, milestones, dependencies, and timelines in a graphical format
Commonly used in project management to communicate project status and timelines
Example: Task 1 starts on Monday and ends on Friday, Task 2 st
I applied via LinkedIn and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
posted on 22 Feb 2022
Layout of BBS structure and building construction work involves planning and execution of reinforcement detailing and construction activities.
Prepare detailed bar bending schedules (BBS) for reinforcement detailing
Ensure proper placement and alignment of reinforcement bars as per design drawings
Supervise construction activities and ensure adherence to quality standards
Coordinate with other stakeholders such as architec...
posted on 15 Aug 2024
A Gantt chart is a visual representation of a project schedule that shows the start and finish dates of various elements of the project.
Gantt charts are used to plan, schedule, and track project progress
They show tasks, milestones, dependencies, and timelines in a graphical format
Commonly used in project management to communicate project status and timelines
Example: Task 1 starts on Monday and ends on Friday, Task 2 st
I applied via Shine and was interviewed in Dec 2022. There were 3 interview rounds.
FGD process is feasible for reducing air pollution from power plants.
FGD (Flue Gas Desulfurization) process is used to remove sulfur dioxide from flue gases.
It is a proven technology and has been used in power plants for decades.
FGD systems can reduce sulfur dioxide emissions by up to 95%.
The feasibility of FGD process depends on various factors such as the type of fuel used, the size of the power plant, and the cost o...
I applied via LinkedIn and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Shine and was interviewed in Dec 2022. There were 3 interview rounds.
FGD process is feasible for reducing air pollution from power plants.
FGD (Flue Gas Desulfurization) process is used to remove sulfur dioxide from flue gases.
It is a proven technology and has been used in power plants for decades.
FGD systems can reduce sulfur dioxide emissions by up to 95%.
The feasibility of FGD process depends on various factors such as the type of fuel used, the size of the power plant, and the cost o...
Manager
4
salaries
| ₹6 L/yr - ₹10.8 L/yr |
Mechanical Engineer
3
salaries
| ₹3.6 L/yr - ₹4.8 L/yr |
Site Engineer
3
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Hindalco Industries
Hindustan Zinc
Rungta Mines
Vedanta Resources