Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There was 1 interview round.
Top trending discussions
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
Five core tools used in production.
1. CNC machines
2. 3D printers
3. Assembly line robots
4. Welding equipment
5. Industrial sewing machines
VSM objective is to identify and eliminate waste in a process.
VSM stands for Value Stream Mapping
It is a lean manufacturing tool used to analyze and improve a process
The objective is to identify and eliminate waste in the process
Waste can be in the form of overproduction, waiting, defects, excess inventory, unnecessary motion, etc.
By eliminating waste, the process becomes more efficient and effective
I am a dedicated and experienced production professional with a strong background in managing manufacturing processes and optimizing efficiency.
Over 5 years of experience in production management
Skilled in implementing lean manufacturing principles
Proven track record of improving production output by 20% through process optimization
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
Yas
posted on 20 Jul 2022
I applied via Referral and was interviewed in Jun 2022. There were 4 interview rounds.
A production line on machining work involves the use of machines to perform various tasks in a sequential manner.
Machining work refers to the process of shaping or altering materials using various tools and machines.
A production line on machining work typically involves multiple machines arranged in a specific order to perform different operations.
Each machine in the production line has a specific function, such as cut...
Production line on machining work involves a series of processes to create a finished product.
The production line involves a series of machines and tools to perform different tasks.
Each machine or tool is responsible for a specific process, such as cutting, drilling, or shaping.
The production line is designed to optimize efficiency and minimize waste.
Quality control is an important aspect of the production line to ensu...
A production line for machining work involves a series of machines and processes to create a finished product.
The production line should be designed to optimize efficiency and minimize downtime.
Each machine in the line should be properly maintained and calibrated to ensure accuracy and consistency.
Quality control measures should be in place to catch any defects or errors in the finished product.
Workers should be traine...
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
Types of gears include spur, helical, bevel, worm, and rack and pinion. Types of beams include I-beams, H-beams, and T-beams.
Types of gears: spur, helical, bevel, worm, and rack and pinion
Types of beams: I-beams, H-beams, and T-beams
I applied via Campus Placement and was interviewed before Feb 2021. There was 1 interview round.
Hydraulic oil is measured by its viscosity, which is determined by its grade or ISO number.
Hydraulic oil is measured by its viscosity, which refers to its resistance to flow.
The viscosity of hydraulic oil is determined by its grade or ISO number.
The higher the grade or ISO number, the thicker the hydraulic oil.
Common grades for hydraulic oil include ISO 32, ISO 46, and ISO 68.
Measures in hydraulic oil are typically expressed in bar.
Bar is a unit of pressure measurement
It is commonly used in hydraulic systems
The pressure range can vary depending on the system and application
Typical values range from 100 to 700 bar
Regular monitoring of hydraulic oil pressure is important for system maintenance
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 28 Oct 2023
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
Where are you going to live
Manpower management involves planning, organizing, and controlling the workforce to ensure optimal productivity and efficiency.
Develop a staffing plan based on workload and project requirements
Assign tasks and responsibilities to employees based on their skills and expertise
Monitor and track employee performance to identify areas for improvement
Provide training and development opportunities to enhance employee skills
Im...
5S is a methodology used to organize a workplace for efficiency and effectiveness. The 5 C's are key components of 5S: Sort, Set in order, Shine, Standardize, Sustain.
Sort - separating necessary items from unnecessary items
Set in order - arranging necessary items in a logical and efficient manner
Shine - cleaning and maintaining the work area
Standardize - establishing consistent procedures and practices
Sustain - ensurin...
Senior Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
17
salaries
| ₹0 L/yr - ₹0 L/yr |
UNO Minda
Sundaram Clayton
Bharat Forge
Rane (Madras)