Filter interviews by
I applied via Company Website and was interviewed in Nov 2022. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.
I have 5 years of experience in production engineering.
I have worked in the production engineering field for 5 years.
My experience includes optimizing production processes and improving efficiency.
I have successfully implemented cost-saving measures in previous roles.
I have a strong understanding of manufacturing principles and technologies.
I have experience working with cross-functional teams to achieve production goa
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear organizational structure and job roles
Communicate effectively with the team to ensure understanding of goals and expectations
Provide necessary training and resources for skill development
Motivate and reward employees for their hard work and achievements
Regularly evaluate performance and provide feedback for i
Salary expectations are based on industry standards, experience, and location.
Research industry standards for Production Engineers in your area
Consider your level of experience and skills
Factor in the cost of living in the location of the job
Be prepared to negotiate based on benefits and perks offered
Provide a range rather than a specific number
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
Various machines are used in engineering, depending on the specific task at hand.
Milling machines are used for cutting and shaping solid materials.
Lathe machines are used for shaping metal or wood by rotating the workpiece against a cutting tool.
Drilling machines are used for creating holes in materials.
Grinding machines are used for finishing workpieces by removing excess material.
CNC machines are computer-controlled
Part manufacturers are companies that produce components or parts used in various products.
Part manufacturers specialize in producing specific components or parts.
They often work with engineers to design and create custom parts.
Examples include companies that manufacture screws, gears, circuit boards, etc.
The minimum and maximum tonnage of a machine depends on its type and purpose.
Minimum and maximum tonnage can vary greatly depending on the type of machine (e.g. hydraulic press, injection molding machine)
For example, a hydraulic press may have a minimum tonnage of 10 tons and a maximum tonnage of 500 tons
It is important to consider the intended use of the machine when determining the appropriate tonnage range
posted on 15 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jul 2024. There were 2 interview rounds.
I am passionate about utilizing my skills and knowledge in electrical engineering to contribute to innovative projects and make a positive impact.
Passionate about electrical engineering and eager to contribute to innovative projects
Desire to make a positive impact through my skills and knowledge
Excited about the opportunity to work with a talented team and learn from experienced professionals
What is your role in the company, and how did you achieve your target?
I was interviewed in Apr 2024.
I was interviewed in Sep 2023.
I was interviewed in Aug 2023.
My KPI as a Production Engineer is to ensure efficient production processes, minimize downtime, and optimize product quality.
Monitoring and improving production efficiency
Reducing downtime through preventive maintenance
Implementing quality control measures
Optimizing production output
Analyzing and improving production costs
OEE (Overall Equipment Efficiency) can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing the total operating time by the planned production time.
Calculate Performance by dividing the actual production rate by the maximum production rate.
Calculate Quality by dividing the good units produced by the total units produced.
Multiply the Availability, Performance
4M is a methodology used in production engineering. Retroactive refers to actions taken after an event, while prospective refers to actions taken before an event.
4M is a methodology used in production engineering that stands for Man, Machine, Material, and Method.
Man refers to the human resources involved in the production process.
Machine refers to the equipment and tools used in production.
Material refers to the raw m...
The base documents of a control plan include process flow diagrams, work instructions, and quality standards.
Process flow diagrams outline the sequence of steps in the production process.
Work instructions provide detailed instructions on how to perform each step of the process.
Quality standards define the criteria for acceptable quality and specify the required inspections and tests.
Other base documents may include con...
5W 1H is a technique used to gather information by asking five 'W' questions and one 'H' question.
5W 1H stands for Who, What, When, Where, Why, and How.
It is commonly used in journalism, problem-solving, and project management.
By asking these questions, one can gather comprehensive information about a situation or problem.
For example, in a production engineering context, the 5W 1H questions could be: Who is responsible...
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Senior Engineer
53
salaries
| ₹3.3 L/yr - ₹7 L/yr |
Assistant Manager
46
salaries
| ₹5.5 L/yr - ₹8.5 L/yr |
Engineer
41
salaries
| ₹2.8 L/yr - ₹5.8 L/yr |
Quality Engineer
28
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Deputy Manager
17
salaries
| ₹7 L/yr - ₹11 L/yr |
UNO Minda
Sundaram Clayton
Bharat Forge
Rane (Madras)