Filter interviews by
I applied via Referral and was interviewed in Jun 2022. There were 4 interview rounds.
A production line on machining work involves the use of machines to perform various tasks in a sequential manner.
Machining work refers to the process of shaping or altering materials using various tools and machines.
A production line on machining work typically involves multiple machines arranged in a specific order to perform different operations.
Each machine in the production line has a specific function, such as cut...
Production line on machining work involves a series of processes to create a finished product.
The production line involves a series of machines and tools to perform different tasks.
Each machine or tool is responsible for a specific process, such as cutting, drilling, or shaping.
The production line is designed to optimize efficiency and minimize waste.
Quality control is an important aspect of the production line to ensu...
A production line for machining work involves a series of machines and processes to create a finished product.
The production line should be designed to optimize efficiency and minimize downtime.
Each machine in the line should be properly maintained and calibrated to ensure accuracy and consistency.
Quality control measures should be in place to catch any defects or errors in the finished product.
Workers should be traine...
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
Yas
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
Five core tools used in production.
1. CNC machines
2. 3D printers
3. Assembly line robots
4. Welding equipment
5. Industrial sewing machines
VSM objective is to identify and eliminate waste in a process.
VSM stands for Value Stream Mapping
It is a lean manufacturing tool used to analyze and improve a process
The objective is to identify and eliminate waste in the process
Waste can be in the form of overproduction, waiting, defects, excess inventory, unnecessary motion, etc.
By eliminating waste, the process becomes more efficient and effective
Top trending discussions
Fixed stroke refers to a consistent and unchanging distance that a mechanical component moves during each cycle.
Fixed stroke is a term commonly used in production and manufacturing.
It refers to the predetermined and unchanging distance that a mechanical component moves during each cycle.
This distance is fixed and does not vary.
For example, in a piston engine, the stroke length of the piston is fixed and determines the ...
I applied via campus placement at Thiruvalluvar University and was interviewed before Apr 2020. There were 5 interview rounds.
posted on 19 Apr 2024
Don't join in this group
posted on 10 Jun 2024
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
I applied via Company Website and was interviewed in Jul 2022. There were 4 interview rounds.
Production, quality,managing
Production, quality, managing
based on 5 reviews
Rating in categories
Assistant Engineer
898
salaries
| ₹1 L/yr - ₹5.4 L/yr |
Engineer
665
salaries
| ₹2 L/yr - ₹7 L/yr |
Assistant Manager
602
salaries
| ₹4 L/yr - ₹13.2 L/yr |
Senior Engineer
497
salaries
| ₹2.8 L/yr - ₹9.5 L/yr |
Production Engineer
496
salaries
| ₹1 L/yr - ₹6 L/yr |
Bharat Forge
Tata Motors
Mahindra & Mahindra
TVS Motor