Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Megha Engineering & Infrastructures Data Entry Operator Interview Questions and Answers

Updated 27 Jan 2024

Megha Engineering & Infrastructures Data Entry Operator Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Do you have any experience
  • Ans. 4 yeas experience in data entry operator & 3 yeas experience in accountent
  • Answered Anonymously
  • Q2. What the qualification
  • Q3. Were you do work in previous company

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is MPLS and flow of labels in MPLS
  • Ans. 

    MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.

    • MPLS stands for Multiprotocol Label Switching

    • Labels are assigned to packets at the ingress router

    • Labels are used to identify the path a packet should take through the network

    • Labels are swapped at each MPLS router along the path

    • The last MPLS router removes the label and forwards the packet based on the IP ad...

  • Answered by AI
  • Q2. What is route reflector in BGP
  • Ans. 

    Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.

    • Route reflector reduces the number of iBGP peerings required in a network.

    • It helps in scaling the network by reducing the number of updates and processing required.

    • Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.

    • It is commonly used in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the role or profile for which you are applying. Brushup basics about all the topics for your role

Skills evaluated in this interview

Contribute & help others!
anonymous
You can choose to be anonymous

Megha Engineering & Infrastructures Interview FAQs

How many rounds are there in Megha Engineering & Infrastructures Data Entry Operator interview?
Megha Engineering & Infrastructures interview process usually has 1 rounds. The most common rounds in the Megha Engineering & Infrastructures interview process are HR.

Recently Viewed

JOBS

Browse jobs

Discover jobs you love

COMPANY BENEFITS

KNR Constructions

20 benefits

COMPANY BENEFITS

IRB Infrastructure

60 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

INTERVIEWS

Eaton India Innovation Center

No Interviews

INTERVIEWS

Cross Country Infotech

20 top interview questions

INTERVIEWS

Eaton India Innovation Center

No Interviews

INTERVIEWS

Eaton India Innovation Center

No Interviews

INTERVIEWS

Hummingbird Web Solutions

No Interviews

Tell us how to improve this page.

Megha Engineering & Infrastructures Data Entry Operator Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
Tata Technologies Interview Questions
3.6
 • 258 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
Dilip Buildcon Interview Questions
4.0
 • 141 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Worley Interview Questions
4.1
 • 109 Interviews
View all
Megha Engineering & Infrastructures Data Entry Operator Salary
based on 5 salaries
₹1.9 L/yr - ₹3 L/yr
18% more than the average Data Entry Operator Salary in India
View more details

Megha Engineering & Infrastructures Data Entry Operator Reviews and Ratings

based on 6 reviews

3.9/5

Rating in categories

4.6

Skill development

4.9

Work-life balance

4.8

Salary

4.6

Job security

4.6

Company culture

4.6

Promotions

4.6

Work satisfaction

Explore 6 Reviews and Ratings
Engineer
898 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
878 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Associate Manager
501 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
412 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
345 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Megha Engineering & Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview