Filter interviews by
I was interviewed in Jan 2025.
English grammer questions
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
English grammer and medical terminologies
I applied via LinkedIn and was interviewed in May 2024. There were 3 interview rounds.
General questions regarding english
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
Few English questions and few anatomy question and one case study which was quite easy
Medilenz interview questions for popular designations
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
English and Medical Knowledged question
I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.
I was interviewed in Dec 2024.
Yes, CICD is implemented in the current organization.
CICD pipelines are set up to automate the build, test, and deployment processes.
Tools like Jenkins, GitLab CI/CD, or CircleCI are used for CICD.
Integration with version control systems like Git for triggering builds.
Automated testing is integrated into the pipeline for quality assurance.
Deployment to various environments like development, staging, and production is a
Creating a Terraform file for infrastructure provisioning
Define provider and required variables
Create resources like instances, networks, and storage
Use modules for reusable code
Implement variables and outputs for flexibility
Leverage Terraform state for tracking changes
Challenges faced with Openshift Kubernetes include complexity, resource management, and learning curve.
Complexity of managing multiple containers and pods
Resource management to ensure optimal performance and scalability
Learning curve for understanding Kubernetes concepts and best practices
Migration from Openshift to Rancher involves planning, testing, and executing the migration process.
Assess the current environment and applications running on Openshift
Plan the migration strategy including timelines, resources, and potential risks
Test the migration process in a non-production environment before executing in production
Execute the migration process in a phased approach to minimize downtime and impact on ...
ELK stack is used for log management in current organization.
ELK stands for Elasticsearch, Logstash, and Kibana.
Elasticsearch is used for indexing and searching logs.
Logstash is used for log collection, parsing, and transformation.
Kibana is used for visualization and analysis of logs.
To handle increased data load in ELK, consider scaling up hardware, optimizing queries, using index sharding, and implementing data retention policies.
Scale up hardware resources such as CPU, memory, and storage to handle increased data load.
Optimize queries to reduce the amount of data being processed and improve search performance.
Implement index sharding to distribute data across multiple nodes for better performanc...
To ensure HA in ELK, utilize multiple nodes, load balancers, and data replication.
Set up multiple Elasticsearch nodes in a cluster for redundancy
Use load balancers to distribute traffic evenly across nodes
Implement data replication to ensure data availability in case of node failure
The approach for migrating from on-premises systems to AWS involves planning, assessment, migration, and optimization.
Conduct a thorough assessment of current on-premises systems and workloads to determine what can be migrated to AWS.
Create a detailed migration plan outlining the steps, timeline, resources, and potential challenges.
Utilize AWS Migration Hub to track the progress of the migration and ensure a smooth tra...
One of the biggest challenges I faced was managing a complex deployment process with multiple dependencies.
Identifying bottlenecks in the deployment process and streamlining them
Implementing automation tools to reduce manual errors and save time
Collaborating with different teams to ensure smooth coordination and communication
Key considerations for security in architecture include network security, data encryption, access control, and monitoring.
Implement network security measures such as firewalls, VPNs, and intrusion detection systems to protect against external threats.
Utilize data encryption techniques like SSL/TLS to secure data in transit and at rest.
Implement access control mechanisms to ensure that only authorized users have access ...
Work assignments are obtained through a combination of team meetings, project management tools, and direct communication with team leads or managers.
Work assignments are often discussed during team meetings where priorities and tasks are allocated.
Project management tools such as Jira or Trello may be used to assign and track work assignments.
Direct communication with team leads or managers can also result in work assi...
My strengths include strong problem-solving skills and attention to detail. My weaknesses include a tendency to overthink and a lack of experience in certain technologies.
Strengths: strong problem-solving skills
Strengths: attention to detail
Weaknesses: tendency to overthink
Weaknesses: lack of experience in certain technologies
I would consider all factors before making a decision.
I would evaluate the new job offer in comparison to the opportunities and benefits offered by your organization.
I would consider the long-term growth potential, company culture, work-life balance, and overall fit with the team.
Ultimately, my decision would be based on which opportunity aligns best with my career goals and values.
posted on 12 Feb 2025
I was interviewed in Jan 2025.
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
P/L stands for profit and loss, which shows the financial performance of a company over a specific period. B/S stands for balance sheet, which provides a snapshot of a company's financial position at a specific point in time.
P/L (Profit and Loss) shows the revenue, expenses, and profits or losses of a company over a specific period.
B/S (Balance Sheet) shows the assets, liabilities, and equity of a company at a specific...
The duration of Medilenz interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 8 interviews
Interview experience
based on 22 reviews
Rating in categories
Bangalore / Bengaluru
2-5 Yrs
Not Disclosed
Medical Reviewer
36
salaries
| â‚ą2.4 L/yr - â‚ą5.5 L/yr |
Medical Record Reviewer
13
salaries
| â‚ą3 L/yr - â‚ą4.8 L/yr |
Team Lead
4
salaries
| â‚ą6 L/yr - â‚ą7.2 L/yr |
Medical Summarizer
4
salaries
| â‚ą3 L/yr - â‚ą3.6 L/yr |
Software Design Engineer
3
salaries
| â‚ą2.4 L/yr - â‚ą4 L/yr |
Practo
PharmEasy
Netmeds.com
Portea Medical