Medhaj Techno Concept Quality Assurance Quality Control Engineer Interview Questions, Process, and Tips

Updated 21 Jan 2024

Medhaj Techno Concept Quality Assurance Quality Control Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the relation between the Characteristic Strength and Water Cement Ratio of the Concrete ?
  • Ans. 

    The characteristic strength of concrete is influenced by the water-cement ratio.

    • The water-cement ratio is the ratio of the weight of water to the weight of cement used in the concrete mix.

    • A lower water-cement ratio generally results in higher characteristic strength.

    • A higher water-cement ratio can lead to lower characteristic strength and reduced durability.

    • The water-cement ratio affects the hydration process and the o...

  • Answered by AI
  • Q2. What is the density of DI, MS and HDPE Pipes ?
  • Ans. 

    The density of DI, MS, and HDPE pipes varies depending on their composition and manufacturing process.

    • Density is a measure of mass per unit volume.

    • DI (Ductile Iron) pipes have a density of approximately 7.2 g/cm³.

    • MS (Mild Steel) pipes have a density of around 7.85 g/cm³.

    • HDPE (High-Density Polyethylene) pipes have a density ranging from 0.93 to 0.97 g/cm³.

    • The density of pipes is an important factor in determining their ...

  • Answered by AI
  • Q3. What is the difference between the Workability and Durability of the Concrete ?
  • Ans. 

    Workability refers to the ease of handling and placing concrete, while durability refers to its ability to withstand environmental and service conditions.

    • Workability is influenced by factors such as water content, aggregate size, and admixtures.

    • Workable concrete can be easily mixed, transported, and placed without segregation or excessive bleeding.

    • Durability is affected by factors like the water-cement ratio, cement co...

  • Answered by AI
  • Q4. What is the pressure range of DI and HDPE Pipes ?
  • Ans. 

    The pressure range of DI and HDPE pipes varies depending on their size and application.

    • The pressure range of DI (Ductile Iron) pipes typically ranges from 150 psi to 350 psi.

    • HDPE (High-Density Polyethylene) pipes have a pressure range of 100 psi to 300 psi.

    • The pressure rating of pipes also depends on their diameter and wall thickness.

    • For example, a 4-inch DI pipe with a wall thickness of 0.25 inches may have a pressure...

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. Please tell me something about yourself in brief ?
  • Q2. Why you plan switch this company suddenly ?
  • Q3. Can you go to any place for job ?

Interview Preparation Tips

Interview preparation tips for other job seekers - I would like to suggest this to all my visiting friends that working here is very wonderful. The way of working in this company, the culture here, the experience here is excellent and wonderful in itself. If you are a Hard Working and Honest Person then working here will be a great moment for you and you will get full support from the company.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

Electrical and Electronic test

Round 2 - Technical 

(1 Question)

  • Q1. All technical questions do the basic theory properly

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare very well for the interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. IS ans IEC standard testing process and methods.

I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical and management

Interview Preparation Tips

Interview preparation tips for other job seekers - You can do interview without any hesitation.

I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Self introduction
  • Q2. Transformer related questions like Working, types, principle.
  • Q3. Symbols, types of pole, principle of rectifier and it's working.
  • Ans. 

    The question is about symbols, types of pole, principle of rectifier and its working.

    • Symbols used in electrical engineering include resistor, capacitor, inductor, etc.

    • Types of poles include north and south poles in magnets and positive and negative poles in batteries.

    • The principle of rectifier is to convert AC to DC.

    • Rectifiers can be half-wave or full-wave.

    • Working of rectifier involves the use of diodes to allow curren

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The key to success before any interview is preparation and that means looking up important information about the company beforehand.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General question related to profile.
Round 3 - Technical 

(1 Question)

  • Q1. In depth technical questions.
Round 4 - One-on-one 

(1 Question)

  • Q1. Related to presentation skills
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Previous work experience
Round 2 - One-on-one 

(1 Question)

  • Q1. Work experience and achievements

Interview Preparation Tips

Interview preparation tips for other job seekers - Cashify company is not good for sales, marketing, operations, please join only tech team
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2023, where I was asked the following questions.

  • Q1. Define about your previous job role
  • Ans. 

    In my previous role as a Project Engineer, I managed engineering projects from conception to completion, ensuring timely delivery and quality.

    • Led a team of engineers to design and implement a new manufacturing process, resulting in a 20% increase in efficiency.

    • Coordinated with cross-functional teams to ensure project milestones were met, improving communication and collaboration.

    • Conducted risk assessments and developed...

  • Answered by AI
  • Q2. Crane pad compaction detail
  • Q3. Crane pad area detail
  • Q4. Capacity of crane lifting
  • Ans. 

    Understanding crane lifting capacity is crucial for safe and efficient project execution.

    • Crane capacity is determined by the type of crane and its configuration.

    • For example, a tower crane can lift heavier loads than a mobile crane due to its fixed base.

    • The lifting capacity decreases as the radius increases; for instance, a crane may lift 10 tons at 10 meters but only 5 tons at 20 meters.

    • Load charts provided by manufact...

  • Answered by AI
  • Q5. Detail in interacting and movement of major component
  • Ans. 

    Effective interaction and movement of major components ensure project success and efficiency in engineering tasks.

    • Understand the specifications of each component to ensure compatibility.

    • Utilize CAD software for precise modeling and visualization of component interactions.

    • Implement a systematic approach for assembly, such as following a step-by-step guide.

    • Conduct regular checks and tests during the movement phase to ide...

  • Answered by AI
  • Q6. Height and weight of major components
  • Q7. Process of Erection
  • Q8. Requirements of Erection
  • Ans. 

    Erection requirements involve planning, safety measures, and coordination for successful project execution.

    • Site Preparation: Ensure the site is cleared and ready for equipment and materials.

    • Safety Protocols: Implement safety measures like PPE and hazard assessments.

    • Equipment Availability: Confirm that all necessary tools and machinery are on-site.

    • Skilled Workforce: Ensure that qualified personnel are available for the ...

  • Answered by AI
  • Q9. How many manpower required in one crane pakage
  • Q10. How many cranes required in one crane pakage
  • Ans. 

    The number of cranes in a crane package depends on project size, load requirements, and site conditions.

    • Typically, one crane is sufficient for small to medium projects.

    • For larger projects, multiple cranes may be needed for efficiency.

    • Example: A high-rise building may require 2-3 cranes for simultaneous operations.

    • Consideration of crane type (tower, mobile) affects the number needed.

    • Site layout and logistics can also di

  • Answered by AI
  • Q11. Which tools required for tensioning and torquing
  • Ans. 

    Tensioning and torquing tools ensure proper fastening and load distribution in engineering projects.

    • Torque Wrench: Used to apply a specific torque to fasteners, ensuring they are tightened to the correct specification.

    • Tensioning Tool: Devices like hydraulic tensioners that apply a precise amount of tension to bolts, often used in large structures.

    • Torque Angle Gauge: Measures the angle of rotation after a fastener has b...

  • Answered by AI
  • Q12. Complete detail work of preparation for erection
  • Q13. Detail work process of MCC
  • Ans. 

    MCC (Motor Control Center) work process involves design, installation, and maintenance of electrical control systems for motors.

    • Design: Create layout and specifications for the MCC based on project requirements.

    • Installation: Assemble and install MCC components like circuit breakers, contactors, and control panels.

    • Testing: Conduct functional tests to ensure all components operate correctly and safely.

    • Maintenance: Regula...

  • Answered by AI
  • Q14. Process of MCC closing
  • Ans. 

    MCC closing involves safely shutting down a Motor Control Center, ensuring equipment and personnel safety.

    • 1. Ensure all equipment is in a safe state before closing the MCC.

    • 2. Notify all personnel involved in the operation about the MCC closure.

    • 3. Follow lockout/tagout (LOTO) procedures to prevent accidental re-energization.

    • 4. Gradually reduce load on the MCC by shutting down connected equipment.

    • 5. Monitor voltage and c...

  • Answered by AI
  • Q15. Punch point close plan
  • Q16. How you can stop the mishandling of tools and tackle and major components in site
  • Ans. 

    Implementing strict protocols and training can prevent tool mishandling and ensure safety on site.

    • Conduct regular training sessions on proper tool handling and safety protocols.

    • Implement a tool tracking system to monitor the usage and location of tools.

    • Establish a designated storage area for tools and components to prevent loss and damage.

    • Use color-coded tags or labels to identify tools and their designated users.

    • Condu...

  • Answered by AI
  • Q17. How you can control of tools damages
  • Ans. 

    Implementing preventive measures and regular maintenance can effectively control tool damage in engineering projects.

    • Conduct regular inspections to identify wear and tear, e.g., checking drill bits for dullness.

    • Implement proper storage solutions to prevent accidental damage, such as using toolboxes or racks.

    • Train staff on correct usage techniques to minimize misuse, e.g., demonstrating proper handling of power tools.

    • Es...

  • Answered by AI
  • Q18. Process of pre-com
  • Ans. 

    Pre-com is the process of preparing and organizing project components before execution.

    • Define project scope and objectives clearly.

    • Gather and analyze all necessary data and resources.

    • Develop a detailed project plan with timelines.

    • Identify and allocate roles and responsibilities among team members.

    • Conduct risk assessments and develop mitigation strategies.

  • Answered by AI
  • Q19. Post-com plan at site
  • Ans. 

    A post-com plan outlines the steps for project completion and site handover, ensuring all tasks are finalized efficiently.

    • Conduct a final site inspection to ensure all work meets quality standards.

    • Compile and submit all necessary documentation, including as-built drawings and warranties.

    • Organize a handover meeting with stakeholders to discuss project outcomes and address any concerns.

    • Ensure all safety measures are revi...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Basic civil engineering related questions like excavation process, building materials, lab testing ect.

I applied via Referral

Round 1 - Aptitude Test 

Civil engineering

Round 2 - Technical 

(1 Question)

  • Q1. Civil engineering , All important questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Never ever believe in any job provider site, like Naukri,Monster, Times jobs they are all fraud. Don't feel prey to job scammers , just believe in yourself and try your level best. Better always search through newspaper for jobs.

Medhaj Techno Concept Interview FAQs

How many rounds are there in Medhaj Techno Concept Quality Assurance Quality Control Engineer interview?
Medhaj Techno Concept interview process usually has 2 rounds. The most common rounds in the Medhaj Techno Concept interview process are Technical and HR.
What are the top questions asked in Medhaj Techno Concept Quality Assurance Quality Control Engineer interview?

Some of the top questions asked at the Medhaj Techno Concept Quality Assurance Quality Control Engineer interview -

  1. What is the relation between the Characteristic Strength and Water Cement Ratio...read more
  2. What is the difference between the Workability and Durability of the Concret...read more
  3. What is the density of DI, MS and HDPE Pipe...read more

Tell us how to improve this page.

Medhaj Techno Concept Quality Assurance Quality Control Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Bureau Veritas Interview Questions
3.9
 • 117 Interviews
SGS Interview Questions
3.9
 • 98 Interviews
TÜV NORD Interview Questions
3.7
 • 67 Interviews
CMS Infosystems Interview Questions
3.6
 • 56 Interviews
Intertek Interview Questions
3.7
 • 56 Interviews
Cashify Interview Questions
3.8
 • 41 Interviews
Titan Eye Plus Interview Questions
4.3
 • 30 Interviews
Reliance Group Interview Questions
4.2
 • 20 Interviews
Gold Plus Glass Interview Questions
3.6
 • 17 Interviews
View all
Senior Engineer
184 salaries
unlock blur

₹2.3 L/yr - ₹7.6 L/yr

Deputy Manager
164 salaries
unlock blur

₹3.1 L/yr - ₹9.6 L/yr

Field Engineer
135 salaries
unlock blur

₹1.5 L/yr - ₹4.3 L/yr

Electrical Engineer
131 salaries
unlock blur

₹1.4 L/yr - ₹4 L/yr

Site Engineer
101 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Explore more salaries
Compare Medhaj Techno Concept with

Bureau Veritas

3.9
Compare

SGS

3.9
Compare

CMS Infosystems

3.6
Compare

Intertek

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview