The characteristic strength of concrete is influenced by the water-cement ratio.
The water-cement ratio is the ratio of the weight of water to the weight of cement used in the concrete mix.
A lower water-cement ratio generally results in higher characteristic strength.
A higher water-cement ratio can lead to lower characteristic strength and reduced durability.
The water-cement ratio affects the hydration process and the o...
The density of DI, MS, and HDPE pipes varies depending on their composition and manufacturing process.
Density is a measure of mass per unit volume.
DI (Ductile Iron) pipes have a density of approximately 7.2 g/cm³.
MS (Mild Steel) pipes have a density of around 7.85 g/cm³.
HDPE (High-Density Polyethylene) pipes have a density ranging from 0.93 to 0.97 g/cm³.
The density of pipes is an important factor in determining their ...
Workability refers to the ease of handling and placing concrete, while durability refers to its ability to withstand environmental and service conditions.
Workability is influenced by factors such as water content, aggregate size, and admixtures.
Workable concrete can be easily mixed, transported, and placed without segregation or excessive bleeding.
Durability is affected by factors like the water-cement ratio, cement co...
The pressure range of DI and HDPE pipes varies depending on their size and application.
The pressure range of DI (Ductile Iron) pipes typically ranges from 150 psi to 350 psi.
HDPE (High-Density Polyethylene) pipes have a pressure range of 100 psi to 300 psi.
The pressure rating of pipes also depends on their diameter and wall thickness.
For example, a 4-inch DI pipe with a wall thickness of 0.25 inches may have a pressure...
Top trending discussions
I applied via Campus Placement and was interviewed before Oct 2022. There were 2 interview rounds.
Electrical and Electronic test
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
The question is about symbols, types of pole, principle of rectifier and its working.
Symbols used in electrical engineering include resistor, capacitor, inductor, etc.
Types of poles include north and south poles in magnets and positive and negative poles in batteries.
The principle of rectifier is to convert AC to DC.
Rectifiers can be half-wave or full-wave.
Working of rectifier involves the use of diodes to allow curren
I applied via Naukri.com and was interviewed in May 2023. There were 4 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
I appeared for an interview in Mar 2023, where I was asked the following questions.
In my previous role as a Project Engineer, I managed engineering projects from conception to completion, ensuring timely delivery and quality.
Led a team of engineers to design and implement a new manufacturing process, resulting in a 20% increase in efficiency.
Coordinated with cross-functional teams to ensure project milestones were met, improving communication and collaboration.
Conducted risk assessments and developed...
Understanding crane lifting capacity is crucial for safe and efficient project execution.
Crane capacity is determined by the type of crane and its configuration.
For example, a tower crane can lift heavier loads than a mobile crane due to its fixed base.
The lifting capacity decreases as the radius increases; for instance, a crane may lift 10 tons at 10 meters but only 5 tons at 20 meters.
Load charts provided by manufact...
Effective interaction and movement of major components ensure project success and efficiency in engineering tasks.
Understand the specifications of each component to ensure compatibility.
Utilize CAD software for precise modeling and visualization of component interactions.
Implement a systematic approach for assembly, such as following a step-by-step guide.
Conduct regular checks and tests during the movement phase to ide...
Erection requirements involve planning, safety measures, and coordination for successful project execution.
Site Preparation: Ensure the site is cleared and ready for equipment and materials.
Safety Protocols: Implement safety measures like PPE and hazard assessments.
Equipment Availability: Confirm that all necessary tools and machinery are on-site.
Skilled Workforce: Ensure that qualified personnel are available for the ...
The number of cranes in a crane package depends on project size, load requirements, and site conditions.
Typically, one crane is sufficient for small to medium projects.
For larger projects, multiple cranes may be needed for efficiency.
Example: A high-rise building may require 2-3 cranes for simultaneous operations.
Consideration of crane type (tower, mobile) affects the number needed.
Site layout and logistics can also di
Tensioning and torquing tools ensure proper fastening and load distribution in engineering projects.
Torque Wrench: Used to apply a specific torque to fasteners, ensuring they are tightened to the correct specification.
Tensioning Tool: Devices like hydraulic tensioners that apply a precise amount of tension to bolts, often used in large structures.
Torque Angle Gauge: Measures the angle of rotation after a fastener has b...
MCC (Motor Control Center) work process involves design, installation, and maintenance of electrical control systems for motors.
Design: Create layout and specifications for the MCC based on project requirements.
Installation: Assemble and install MCC components like circuit breakers, contactors, and control panels.
Testing: Conduct functional tests to ensure all components operate correctly and safely.
Maintenance: Regula...
MCC closing involves safely shutting down a Motor Control Center, ensuring equipment and personnel safety.
1. Ensure all equipment is in a safe state before closing the MCC.
2. Notify all personnel involved in the operation about the MCC closure.
3. Follow lockout/tagout (LOTO) procedures to prevent accidental re-energization.
4. Gradually reduce load on the MCC by shutting down connected equipment.
5. Monitor voltage and c...
Implementing strict protocols and training can prevent tool mishandling and ensure safety on site.
Conduct regular training sessions on proper tool handling and safety protocols.
Implement a tool tracking system to monitor the usage and location of tools.
Establish a designated storage area for tools and components to prevent loss and damage.
Use color-coded tags or labels to identify tools and their designated users.
Condu...
Implementing preventive measures and regular maintenance can effectively control tool damage in engineering projects.
Conduct regular inspections to identify wear and tear, e.g., checking drill bits for dullness.
Implement proper storage solutions to prevent accidental damage, such as using toolboxes or racks.
Train staff on correct usage techniques to minimize misuse, e.g., demonstrating proper handling of power tools.
Es...
Pre-com is the process of preparing and organizing project components before execution.
Define project scope and objectives clearly.
Gather and analyze all necessary data and resources.
Develop a detailed project plan with timelines.
Identify and allocate roles and responsibilities among team members.
Conduct risk assessments and develop mitigation strategies.
A post-com plan outlines the steps for project completion and site handover, ensuring all tasks are finalized efficiently.
Conduct a final site inspection to ensure all work meets quality standards.
Compile and submit all necessary documentation, including as-built drawings and warranties.
Organize a handover meeting with stakeholders to discuss project outcomes and address any concerns.
Ensure all safety measures are revi...
I applied via Referral
Civil engineering
Some of the top questions asked at the Medhaj Techno Concept Quality Assurance Quality Control Engineer interview -
based on 1 interview
Interview experience
Senior Engineer
184
salaries
| ₹2.3 L/yr - ₹7.6 L/yr |
Deputy Manager
164
salaries
| ₹3.1 L/yr - ₹9.6 L/yr |
Field Engineer
135
salaries
| ₹1.5 L/yr - ₹4.3 L/yr |
Electrical Engineer
131
salaries
| ₹1.4 L/yr - ₹4 L/yr |
Site Engineer
101
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Bureau Veritas
SGS
CMS Infosystems
Intertek