Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Medhaj Techno Concept Team. If you also belong to the team, you can get access from here

Medhaj Techno Concept Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Medhaj Techno Concept Deputy Project Manager Interview Questions, Process, and Tips

Updated 3 Jul 2024

Medhaj Techno Concept Deputy Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(6 Questions)

  • Q1. What is main element of Any Structure
  • Ans. 

    The main element of any structure is its foundation.

    • The foundation provides stability and support for the entire structure

    • It distributes the weight of the structure evenly

    • Examples include concrete footings, pilings, and slabs

  • Answered by AI
  • Q2. Development length of Welded Rod
  • Ans. 

    Development length of Welded Rod is the length of the embedded portion of the rod required to develop the full strength of the rod.

    • Development length is influenced by factors such as diameter of the rod, type of material, and type of welding process used.

    • It is important to calculate the development length accurately to ensure the structural integrity of the welded rod.

    • Examples of factors affecting development length in...

  • Answered by AI
  • Q3. How you will going to manager the work
  • Ans. 

    I will manage the work by setting clear goals, delegating tasks effectively, monitoring progress, and providing support to team members.

    • Set clear goals and objectives for the project

    • Delegate tasks based on team members' strengths and expertise

    • Monitor progress regularly and adjust plans as needed

    • Provide support and guidance to team members to ensure successful completion of tasks

  • Answered by AI
  • Q4. Design factor of steel
  • Ans. 

    Design factor of steel refers to the safety factor used in structural design to account for uncertainties and variations in material properties.

    • Design factor is typically a value greater than 1 to ensure the structure can safely support the intended loads.

    • Common design factors for steel structures range from 1.5 to 2.5, depending on the level of risk and safety required.

    • Factors such as material quality, fabrication pro...

  • Answered by AI
  • Q5. What are the node in Stadd Pro
  • Ans. 

    Nodes in Stadd Pro are points where structural members meet or intersect.

    • Nodes are used to define the geometry of the structure.

    • Nodes are connected by members to form the structural system.

    • Nodes can have different properties assigned to them such as supports or loads.

    • Examples of nodes include column bases, beam ends, and connection points.

  • Answered by AI
  • Q6. Did you know MS Excell
  • Ans. 

    Yes, I am proficient in MS Excel and have experience using it for data analysis and project management tasks.

    • Proficient in creating and managing spreadsheets

    • Experience with data analysis and visualization

    • Used Excel for project management tasks such as tracking progress and creating Gantt charts

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Your Location is in Azamgarh
  • Q2. When you will going to be joined
  • Ans. 

    I will be joining the team on June 1st, 2022.

    • I have accepted the offer and will start on the agreed upon date.

    • I am excited to join the team and contribute to the project.

    • I have already informed my current employer about my resignation.

    • I am in the process of wrapping up my current projects to ensure a smooth transition.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Medhaj is Awesome and a Good culture Associated company and MD is truely inspiring however junior must communicate in a way that foster equality between them and Senior. It is crucial not to let any employee become disrespectful and demoralised to the point of leaving the job

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Previous work experience
Round 2 - One-on-one 

(1 Question)

  • Q1. Work experience and achievements

Interview Preparation Tips

Interview preparation tips for other job seekers - Cashify company is not good for sales, marketing, operations, please join only tech team
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2023, where I was asked the following questions.

  • Q1. Define about your previous job role
  • Ans. 

    In my previous role as a Project Engineer, I managed engineering projects from conception to completion, ensuring timely delivery and quality.

    • Led a team of engineers to design and implement a new manufacturing process, resulting in a 20% increase in efficiency.

    • Coordinated with cross-functional teams to ensure project milestones were met, improving communication and collaboration.

    • Conducted risk assessments and developed...

  • Answered by AI
  • Q2. Crane pad compaction detail
  • Q3. Crane pad area detail
  • Q4. Capacity of crane lifting
  • Ans. 

    Understanding crane lifting capacity is crucial for safe and efficient project execution.

    • Crane capacity is determined by the type of crane and its configuration.

    • For example, a tower crane can lift heavier loads than a mobile crane due to its fixed base.

    • The lifting capacity decreases as the radius increases; for instance, a crane may lift 10 tons at 10 meters but only 5 tons at 20 meters.

    • Load charts provided by manufact...

  • Answered by AI
  • Q5. Detail in interacting and movement of major component
  • Ans. 

    Effective interaction and movement of major components ensure project success and efficiency in engineering tasks.

    • Understand the specifications of each component to ensure compatibility.

    • Utilize CAD software for precise modeling and visualization of component interactions.

    • Implement a systematic approach for assembly, such as following a step-by-step guide.

    • Conduct regular checks and tests during the movement phase to ide...

  • Answered by AI
  • Q6. Height and weight of major components
  • Q7. Process of Erection
  • Q8. Requirements of Erection
  • Ans. 

    Erection requirements involve planning, safety measures, and coordination for successful project execution.

    • Site Preparation: Ensure the site is cleared and ready for equipment and materials.

    • Safety Protocols: Implement safety measures like PPE and hazard assessments.

    • Equipment Availability: Confirm that all necessary tools and machinery are on-site.

    • Skilled Workforce: Ensure that qualified personnel are available for the ...

  • Answered by AI
  • Q9. How many manpower required in one crane pakage
  • Q10. How many cranes required in one crane pakage
  • Q11. Which tools required for tensioning and torquing
  • Ans. 

    Tensioning and torquing tools ensure proper fastening and load distribution in engineering projects.

    • Torque Wrench: Used to apply a specific torque to fasteners, ensuring they are tightened to the correct specification.

    • Tensioning Tool: Devices like hydraulic tensioners that apply a precise amount of tension to bolts, often used in large structures.

    • Torque Angle Gauge: Measures the angle of rotation after a fastener has b...

  • Answered by AI
  • Q12. Complete detail work of preparation for erection
  • Q13. Detail work process of MCC
  • Ans. 

    MCC (Motor Control Center) work process involves design, installation, and maintenance of electrical control systems for motors.

    • Design: Create layout and specifications for the MCC based on project requirements.

    • Installation: Assemble and install MCC components like circuit breakers, contactors, and control panels.

    • Testing: Conduct functional tests to ensure all components operate correctly and safely.

    • Maintenance: Regula...

  • Answered by AI
  • Q14. Process of MCC closing
  • Ans. 

    MCC closing involves safely shutting down a Motor Control Center, ensuring equipment and personnel safety.

    • 1. Ensure all equipment is in a safe state before closing the MCC.

    • 2. Notify all personnel involved in the operation about the MCC closure.

    • 3. Follow lockout/tagout (LOTO) procedures to prevent accidental re-energization.

    • 4. Gradually reduce load on the MCC by shutting down connected equipment.

    • 5. Monitor voltage and c...

  • Answered by AI
  • Q15. Punch point close plan
  • Q16. How you can stop the mishandling of tools and tackle and major components in site
  • Ans. 

    Implementing strict protocols and training can prevent tool mishandling and ensure safety on site.

    • Conduct regular training sessions on proper tool handling and safety protocols.

    • Implement a tool tracking system to monitor the usage and location of tools.

    • Establish a designated storage area for tools and components to prevent loss and damage.

    • Use color-coded tags or labels to identify tools and their designated users.

    • Condu...

  • Answered by AI
  • Q17. How you can control of tools damages
  • Ans. 

    Implementing preventive measures and regular maintenance can effectively control tool damage in engineering projects.

    • Conduct regular inspections to identify wear and tear, e.g., checking drill bits for dullness.

    • Implement proper storage solutions to prevent accidental damage, such as using toolboxes or racks.

    • Train staff on correct usage techniques to minimize misuse, e.g., demonstrating proper handling of power tools.

    • Es...

  • Answered by AI
  • Q18. Process of pre-com
  • Ans. 

    Pre-com is the process of preparing and organizing project components before execution.

    • Define project scope and objectives clearly.

    • Gather and analyze all necessary data and resources.

    • Develop a detailed project plan with timelines.

    • Identify and allocate roles and responsibilities among team members.

    • Conduct risk assessments and develop mitigation strategies.

  • Answered by AI
  • Q19. Post-com plan at site
  • Ans. 

    A post-com plan outlines the steps for project completion and site handover, ensuring all tasks are finalized efficiently.

    • Conduct a final site inspection to ensure all work meets quality standards.

    • Compile and submit all necessary documentation, including as-built drawings and warranties.

    • Organize a handover meeting with stakeholders to discuss project outcomes and address any concerns.

    • Ensure all safety measures are revi...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General question related to profile.
Round 3 - Technical 

(1 Question)

  • Q1. In depth technical questions.
Round 4 - One-on-one 

(1 Question)

  • Q1. Related to presentation skills

I appeared for an interview in Jul 2020.

Interview Questionnaire 

1 Question

  • Q1. What is the biggest challenge in your last company...

Interview Preparation Tips

Interview preparation tips for other job seekers - Good place for a process oriented person...

I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your previous work experiences and processes that you have worked.
  • Q2. Tell me about yourself
  • Q3. What was your initiative in your team

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident while giving answers
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. HSE matters, construction
Round 3 - One-on-one 

(1 Question)

  • Q1. Previous experience on

Interview Preparation Tips

Interview preparation tips for other job seekers - Be bold, show your expertise, answer all the questions

I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Asked questions about my experience till date with all projects.
  • Q2. Checked the knowledge about how to track and complete the fast track project.
  • Q3. Asked skill of computer knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - You have to deep knowledge of ur experience and handled different projects with micro level of all worked with site system.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic HR Questions
Round 3 - One-on-one 

(1 Question)

  • Q1. About Work-Profile & Technical Questions
Round 4 - One-on-one 

(1 Question)

  • Q1. Finalisation & Closure of Interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I appeared for an interview in Jan 2025.

Round 1 - HR 

(1 Question)

  • Q1. How to manage the team
  • Ans. 

    Managing a team involves effective communication, setting clear goals, providing support, and fostering a positive work environment.

    • Communicate clearly and regularly with team members to ensure everyone is on the same page

    • Set specific, achievable goals for the team and individuals, and provide feedback on progress

    • Support team members by offering guidance, resources, and training as needed

    • Create a positive work environm...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Previous experience

Medhaj Techno Concept Interview FAQs

How many rounds are there in Medhaj Techno Concept Deputy Project Manager interview?
Medhaj Techno Concept interview process usually has 2 rounds. The most common rounds in the Medhaj Techno Concept interview process are One-on-one Round and HR.
What are the top questions asked in Medhaj Techno Concept Deputy Project Manager interview?

Some of the top questions asked at the Medhaj Techno Concept Deputy Project Manager interview -

  1. What is main element of Any Struct...read more
  2. What are the node in Stadd ...read more
  3. Development length of Welded ...read more

Tell us how to improve this page.

Medhaj Techno Concept Deputy Project Manager Interview Process

based on 2 interviews

Interview experience

2.5
  
Poor
View more

Interview Questions from Similar Companies

Bureau Veritas Interview Questions
3.9
 • 117 Interviews
SGS Interview Questions
3.9
 • 97 Interviews
TÜV NORD Interview Questions
3.7
 • 66 Interviews
Intertek Interview Questions
3.7
 • 56 Interviews
CMS Infosystems Interview Questions
3.7
 • 55 Interviews
Cashify Interview Questions
3.8
 • 41 Interviews
Titan Eye Plus Interview Questions
4.3
 • 30 Interviews
Reliance Group Interview Questions
4.2
 • 20 Interviews
Gold Plus Glass Interview Questions
3.6
 • 17 Interviews
View all
Medhaj Techno Concept Deputy Project Manager Salary
based on 18 salaries
₹5.5 L/yr - ₹12.5 L/yr
25% less than the average Deputy Project Manager Salary in India
View more details

Medhaj Techno Concept Deputy Project Manager Reviews and Ratings

based on 9 reviews

3.3/5

Rating in categories

3.2

Skill development

3.7

Work-life balance

4.1

Salary

1.7

Job security

3.2

Company culture

2.8

Promotions

3.3

Work satisfaction

Explore 9 Reviews and Ratings
Senior Engineer
184 salaries
unlock blur

₹2.3 L/yr - ₹7.6 L/yr

Deputy Manager
150 salaries
unlock blur

₹3.1 L/yr - ₹9.6 L/yr

Field Engineer
135 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Electrical Engineer
131 salaries
unlock blur

₹1.4 L/yr - ₹4 L/yr

Site Engineer
101 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Explore more salaries
Compare Medhaj Techno Concept with

Bureau Veritas

3.9
Compare

SGS

3.9
Compare

CMS Infosystems

3.6
Compare

Intertek

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview