posted on 8 Mar 2024
Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.
Slump test involves filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.
The amount of slump indicates the workability of the concrete mix - higher slump means more workable mix.
Slump test helps in ensuring that the concrete mix has the r...
M30 grade concrete ratio is 1:1:2 (cement:sand:aggregate)
M30 grade concrete has a ratio of 1:1:2 for cement:sand:aggregate
This means for every part of cement, there is an equal part of sand and double the part of aggregate
For example, for 1 cubic meter of M30 concrete, you would need 1 part cement, 1 part sand, and 2 parts aggregate
Slum test is a method used to assess the quality of concrete by observing the flow of concrete through a standard slump cone.
Slump test is performed by filling a slump cone with freshly mixed concrete, then lifting the cone and measuring the amount of slump or settlement of the concrete.
The result of the slump test indicates the workability of the concrete mixture, with different slumps corresponding to different level...
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.
IRR stands for Internal Rate of Return in project management, which is a metric used to evaluate the profitability of a project.
IRR is a financial metric used to calculate the profitability of an investment or project.
It represents the discount rate that makes the net present value (NPV) of all cash flows from a project equal to zero.
A higher IRR indicates a more profitable project, while a lower IRR may signal potenti...
Project safety refers to the measures and protocols put in place to ensure the well-being and security of all individuals involved in a project.
Ensuring compliance with safety regulations and standards
Implementing safety training for all project team members
Conducting regular safety inspections and audits
Providing personal protective equipment (PPE) when necessary
Creating emergency response plans and protocols
Examples:...
posted on 17 Jan 2023
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
The stages of project cycle include initiation, planning, execution, monitoring and control, and closure.
Initiation involves defining the project, identifying stakeholders, and creating a project charter.
Planning involves creating a project plan, defining scope, creating a work breakdown structure, and identifying resources.
Execution involves carrying out the project plan, managing resources, and communicating with sta...
Project IRR is calculated by finding the discount rate that makes the net present value of cash flows equal to zero.
IRR is the rate at which the net present value of cash inflows equals the net present value of cash outflows.
It is calculated by using trial and error or by using software like Microsoft Excel.
IRR is used to evaluate the profitability of a project and to compare it with other investment opportunities.
If t...
based on 2 interviews
1 Interview rounds
based on 72 reviews
Rating in categories
Assistant Project Engineer
370
salaries
| ₹2.6 L/yr - ₹7 L/yr |
Executive
170
salaries
| ₹5.8 L/yr - ₹13.5 L/yr |
Executive Engineer
98
salaries
| ₹5 L/yr - ₹12 L/yr |
Project Engineer
83
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Senior Manager
50
salaries
| ₹13 L/yr - ₹30 L/yr |
Engineers India
BHEL
TCS
Larsen & Toubro Limited