posted on 5 May 2024
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
posted on 19 Oct 2021
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
I applied via Walk-in
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
Explanation of how to calculate OEE, use 7QC tools, TMP, productivity, team building, manpower management, SAP module, inventory control, and scrap reduction.
OEE calculation involves multiplying availability, performance, and quality percentages
7QC tools include Pareto chart, fishbone diagram, control chart, etc.
TMP stands for Total Maintenance Productivity and measures maintenance efficiency
Productivity can be calcula...
I applied via Naukri.com and was interviewed in Oct 2022. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There was 1 interview round.
Productivity in business refers to the efficiency and effectiveness of the production process.
Productivity is the measure of output per unit of input.
It is important for businesses to maximize productivity to increase profits and remain competitive.
Factors that can affect productivity include technology, employee training, and management practices.
Examples of productivity measures include units produced per hour, reven...
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
I have a Bachelor's degree in Mechanical Engineering and 5 years of experience in production engineering.
Bachelor's degree in Mechanical Engineering
5 years of experience in production engineering
A BIW fixture is a tool used in automotive manufacturing to hold and position the body-in-white during assembly.
BIW stands for Body-In-White, which refers to the stage of automotive manufacturing where the car body is assembled but not yet painted or trimmed.
The fixture is designed to hold the car body in a precise position during assembly, ensuring that all components fit together correctly.
BIW fixtures are typically ...
321 principle is a method of prioritizing tasks based on their urgency and importance.
The principle suggests dividing tasks into three categories: important and urgent, important but not urgent, and urgent but not important.
Tasks that are both important and urgent should be given the highest priority.
Examples of tasks that fall into each category include: important and urgent - a deadline for a project, important but n...
based on 2 interviews
Interview experience
based on 45 reviews
Rating in categories
Junior Engineer
437
salaries
| ₹0 L/yr - ₹0 L/yr |
Oprating Engineer
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
169
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
128
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
126
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
Mann And Hummel Filter
Donaldson India Filter Systems
Cummins