Filter interviews by
Top trending discussions
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There were 3 interview rounds.
High pressure molding line is a manufacturing process where materials are compressed under high pressure to create products.
Materials are placed in a mold cavity and compressed under high pressure to form the desired shape.
Parameters such as temperature, pressure, and cooling time are carefully controlled to ensure quality and consistency.
Examples of products made using high pressure molding line include automotive par...
Sand plant functions to wash, screen, and classify sand for various construction purposes.
Sand plant washes the sand to remove impurities and clay particles.
It screens the sand to separate different sizes for specific applications.
Sand plant classifies the sand based on particle size and shape.
Examples: Sand plants are used in concrete production, glass manufacturing, and foundries.
Sand plant additive dosing percentage is the amount of additive added to the sand in the plant to improve its properties. Controlling raw material consumption involves monitoring and adjusting the dosing percentage.
Monitor the dosing percentage regularly to ensure it is within the desired range
Adjust the dosing percentage based on the quality of the sand and production requirements
Use automation and control systems to ...
DISA molding parameters and box size are crucial factors in controlling mold-related rejection.
DISA molding parameters include factors like sand temperature, compactability, and moisture content.
Box size refers to the dimensions of the mold box used in the molding process.
To control mold-related rejection, ensure proper calibration of DISA molding parameters.
Regularly monitor and adjust box size to meet the requirement...
Vertical pouring system involves pouring metal vertically into the mold, while horizontal pouring system involves pouring metal horizontally.
Vertical pouring system allows for better control over the flow of metal into the mold.
Horizontal pouring system is typically used for larger molds where the weight of the metal could cause issues in a vertical system.
Challenges in vertical molding include ensuring even distributi...
Core making process involves creating sand cores to be placed inside molds for casting metal parts. Raw material control in core shop is crucial for quality cores.
Core making process involves mixing sand with a binder to create a core that is then placed inside a mold for casting metal parts.
Raw materials such as sand, binder, and additives need to be carefully controlled in terms of quality, quantity, and consistency ...
Shell core process is a method used in foundry casting to create hollow cavities in metal castings.
Shell core process involves creating a shell of sand mixed with resin around a pattern to create a hollow cavity in the final casting.
Parameters in shell core process include shell thickness, resin type, curing time, and shell permeability.
Example: In automotive industry, shell core process is used to create complex engin
Furnace capacity refers to the maximum amount of material that can be processed in a furnace at one time. In my previous organization, I handled high-grade steel in the furnace.
Furnace capacity is crucial for determining production output and efficiency.
Different types of furnaces have varying capacities based on their design and size.
Handling high-grade materials in the furnace requires precise temperature control and...
Raw material consumption control in melting department involves monitoring and managing the usage of materials to ensure efficiency and cost-effectiveness.
Regularly monitor raw material inventory levels
Analyze consumption patterns and identify areas for improvement
Implement measures to reduce waste and optimize material usage
Collaborate with procurement team to ensure timely supply of materials
Utilize software systems
I applied via LinkedIn and was interviewed in Jan 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed before Dec 2021. There was 1 interview round.
I applied via Other and was interviewed before Oct 2020. There were 5 interview rounds.
I will implement preventive maintenance, train operators, and monitor machine performance.
Implement a preventive maintenance program
Train operators on proper machine usage and maintenance
Monitor machine performance and address issues promptly
Regularly inspect machines for signs of wear and tear
Use data analysis to identify patterns and potential issues
Invest in high-quality equipment and parts
Establish clear communicat...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Junior Engineer
430
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Oprating Engineer
221
salaries
| ₹1.2 L/yr - ₹4 L/yr |
Assistant Manager
171
salaries
| ₹5.4 L/yr - ₹15 L/yr |
Production Engineer
128
salaries
| ₹1.8 L/yr - ₹6.1 L/yr |
Senior Engineer
126
salaries
| ₹3.9 L/yr - ₹11.6 L/yr |
Bosch
Yazaki
Delphi TVS
Motherson Automotive Technologies and Engineering