Filter interviews by
I applied via Approached by Company and was interviewed before Dec 2023. There were 3 interview rounds.
Generic questions about calculations and GK
Top trending discussions
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
Inventory control is the process of managing and overseeing the ordering, storage, and usage of a company's inventory.
It involves monitoring inventory levels to ensure optimal stock levels are maintained.
Inventory control helps prevent stockouts and overstock situations.
It includes tracking inventory turnover rates and identifying slow-moving or obsolete items.
Utilizes tools like barcode scanners, inventory management ...
FIFO and LIFO are inventory management methods used to track the flow of goods in and out of a store.
FIFO (First-In, First-Out) method assumes that the oldest inventory items are sold first, so the goods that were purchased first are also the first to be used or sold.
LIFO (Last-In, First-Out) method assumes that the newest inventory items are sold first, so the goods that were purchased last are the first to be used or...
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
I applied via Job Fair and was interviewed before Nov 2022. There were 2 interview rounds.
How work in your group
Handling materials involves the physical movement, storage, and control of goods or products.
Physical movement of goods
Storage of goods
Control of goods
Ensuring proper handling and transportation
Inventory management
I applied via Recruitment Consulltant and was interviewed in May 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Aug 2021. There were 3 interview rounds.
Time management is the process of planning and organizing how much time you spend on various activities.
It involves setting goals and priorities
Creating a schedule or to-do list
Eliminating distractions
Delegating tasks when possible
Tracking progress and making adjustments
Examples: Using a planner, setting reminders, breaking tasks into smaller chunks
RM steel grades and their properties depend on the intended use and manufacturing process.
RM stands for 'refined material' and is a type of steel that has undergone additional processing to improve its properties.
Common RM steel grades include RM10, RM12, and RM15, each with varying levels of strength and ductility.
Properties of RM steel grades can include high tensile strength, good weldability, and resistance to corr...
CRCA D and CRCA EDD are two different types of cold-rolled steel sheets with varying properties.
CRCA D has a lower yield strength and is more ductile than CRCA EDD.
CRCA EDD has a higher yield strength and is less ductile than CRCA D.
CRCA D is used for applications that require high formability, while CRCA EDD is used for applications that require high strength.
CRCA D is cheaper than CRCA EDD due to its lower strength.
C...
posted on 18 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
Handling critical situations with suppliers requires proactive communication and contingency planning.
Establish clear communication channels with suppliers
Develop contingency plans for potential supply chain disruptions
Regularly review and update supplier contracts
Maintain a diverse supplier base to mitigate risk
Monitor supplier performance and address issues promptly
Collaborate with cross-functional teams to identify
There are three types of purchase orders: Standard, Blanket, and Contract.
Standard Purchase Order: Used for one-time purchases of goods or services.
Blanket Purchase Order: Used for recurring purchases of goods or services over a period of time.
Contract Purchase Order: Used for long-term purchases of goods or services with a specific supplier.
Each type of purchase order has its own unique characteristics and is used in ...
Open PO and Close PO are different in terms of their status and completion.
Open PO refers to a purchase order that is still active and has not been fully processed or completed.
Close PO, on the other hand, refers to a purchase order that has been fully processed and completed.
Open POs may still require actions such as receiving goods or services, invoicing, or payment.
Close POs indicate that all necessary actions have ...
Direct suppliers provide goods or services directly to the company, while indirect suppliers provide goods or services to the direct suppliers.
Direct suppliers are involved in the production process, while indirect suppliers are not.
Direct suppliers are usually larger and have a closer relationship with the company.
Examples of direct suppliers include raw material providers, while indirect suppliers include packaging s...
I was interviewed in Oct 2023.
Expected CTC is negotiable and I am willing to relocate nearby for the job.
Expected CTC is negotiable based on the job role and responsibilities.
I am open to relocating to a nearby location for the Store Incharge position.
I am flexible with the location as long as it is within a reasonable distance for commuting.
I am excited about the opportunity and willing to discuss further details during the interview.
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
My stability is defined by my ability to adapt to changes and handle challenges with a calm and rational approach.
I am able to maintain a positive attitude even in difficult situations
I have a strong support system of family and friends
I prioritize self-care and stress management techniques
I am open to learning and growing from my experiences
I have a consistent work history and have demonstrated reliability in my past
based on 1 review
Rating in categories
Oprating Engineer
76
salaries
| ₹1.1 L/yr - ₹3.7 L/yr |
Junior Engineer
75
salaries
| ₹2.8 L/yr - ₹4.4 L/yr |
Senior Design Engineer
39
salaries
| ₹4 L/yr - ₹8.3 L/yr |
Assistant Manager
35
salaries
| ₹5 L/yr - ₹11.3 L/yr |
Design Engineer
35
salaries
| ₹3.1 L/yr - ₹6.7 L/yr |
Bosch
Valeo
DENSO
UNO Minda