Filter interviews by
In my previous organization, I successfully completed multiple projects focusing on efficiency and quality improvements in production processes.
Led a project to reduce production downtime by 15% through process optimization.
Implemented a new quality control system that decreased defects by 20%.
Collaborated on a cross-functional team to launch a new product line, resulting in a 30% increase in sales.
I possess strong skills in manpower handling, focusing on effective communication, team motivation, and conflict resolution.
Experience in leading diverse teams in production settings, ensuring smooth workflow.
Implemented training programs that improved team efficiency by 20%.
Skilled in conflict resolution, having mediated disputes that enhanced team cohesion.
Regularly conduct performance reviews to identify streng...
OEE (Overall Equipment Effectiveness) measures manufacturing productivity by evaluating availability, performance, and quality.
OEE = Availability x Performance x Quality.
Availability = (Operating Time / Planned Production Time). Example: 8 hours of operation vs. 10 hours planned = 80%.
Performance = (Actual Output / Maximum Possible Output). Example: 400 units produced vs. 500 units possible = 80%.
Quality = (Good U...
Yes, I am open to relocating for this position as it aligns with my career goals and personal growth.
Relocating allows me to immerse myself in the company's culture and operations.
I have previously relocated for a job, which helped me develop professionally and personally.
Being in the right location can enhance collaboration with team members and stakeholders.
I am adaptable and have a positive attitude towards new...
The 4-step training method enhances learning through demonstration, practice, feedback, and evaluation.
1. Preparation: The trainer prepares the training environment and materials, ensuring all tools are available.
2. Demonstration: The trainer demonstrates the task or skill, explaining each step clearly. For example, showing how to operate a machine.
3. Practice: Trainees practice the skill under supervision, allowi...
Condenser is a device used to convert a gas or vapor to a liquid state by cooling it.
Condensers are commonly used in refrigeration systems to remove heat from the refrigerant gas and convert it back to a liquid state.
They are also used in power plants to condense steam back into water after it has passed through a turbine.
Condensers work by transferring heat from the hot gas to a cooler surface, causing the gas to...
Yes, transformers are categorized as electrical machines.
Transformers are considered electrical machines because they are used to transfer electrical energy between two or more circuits through electromagnetic induction.
They do not have any moving parts like motors or generators, but they still fall under the category of electrical machines.
Transformers play a crucial role in power distribution and voltage regulat...
Electrical machines are devices that convert electrical energy into mechanical energy or vice versa. There are various types including motors, generators, transformers, and more.
Electrical machines are devices that convert electrical energy into mechanical energy or vice versa
Types of electrical machines include motors, generators, transformers, and more
Motors are machines that convert electrical energy into mecha...
Purchase is a crucial aspect of any business that involves acquiring goods or services to meet the needs of the organization.
Purchase involves identifying the needs of the organization and sourcing the right products or services to meet those needs.
It is important to establish relationships with reliable suppliers and negotiate favorable terms and prices.
Effective purchase management involves monitoring inventory ...
The most important step after D1 in G8D is D2 - Containment
D2 - Containment is crucial to prevent further defects or issues from occurring
It involves implementing temporary measures to isolate the problem and prevent its spread
Examples of containment actions include stopping production, segregating affected products, or implementing temporary fixes
Containment helps in minimizing the impact of the problem while the...
I appeared for an interview in Mar 2025, where I was asked the following questions.
I applied via Approached by Company and was interviewed in Jun 2024. There were 2 interview rounds.
In my previous organization, I successfully completed multiple projects focusing on efficiency and quality improvements in production processes.
Led a project to reduce production downtime by 15% through process optimization.
Implemented a new quality control system that decreased defects by 20%.
Collaborated on a cross-functional team to launch a new product line, resulting in a 30% increase in sales.
I possess strong skills in manpower handling, focusing on effective communication, team motivation, and conflict resolution.
Experience in leading diverse teams in production settings, ensuring smooth workflow.
Implemented training programs that improved team efficiency by 20%.
Skilled in conflict resolution, having mediated disputes that enhanced team cohesion.
Regularly conduct performance reviews to identify strengths a...
The 4-step training method enhances learning through demonstration, practice, feedback, and evaluation.
1. Preparation: The trainer prepares the training environment and materials, ensuring all tools are available.
2. Demonstration: The trainer demonstrates the task or skill, explaining each step clearly. For example, showing how to operate a machine.
3. Practice: Trainees practice the skill under supervision, allowing th...
OEE (Overall Equipment Effectiveness) measures manufacturing productivity by evaluating availability, performance, and quality.
OEE = Availability x Performance x Quality.
Availability = (Operating Time / Planned Production Time). Example: 8 hours of operation vs. 10 hours planned = 80%.
Performance = (Actual Output / Maximum Possible Output). Example: 400 units produced vs. 500 units possible = 80%.
Quality = (Good Units ...
Yes, I am open to relocating for this position as it aligns with my career goals and personal growth.
Relocating allows me to immerse myself in the company's culture and operations.
I have previously relocated for a job, which helped me develop professionally and personally.
Being in the right location can enhance collaboration with team members and stakeholders.
I am adaptable and have a positive attitude towards new envi...
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
Condenser is a device used to convert a gas or vapor to a liquid state by cooling it.
Condensers are commonly used in refrigeration systems to remove heat from the refrigerant gas and convert it back to a liquid state.
They are also used in power plants to condense steam back into water after it has passed through a turbine.
Condensers work by transferring heat from the hot gas to a cooler surface, causing the gas to cond...
I appeared for an interview in Nov 2024, where I was asked the following questions.
I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.
Electrical machines are devices that convert electrical energy into mechanical energy or vice versa. There are various types including motors, generators, transformers, and more.
Electrical machines are devices that convert electrical energy into mechanical energy or vice versa
Types of electrical machines include motors, generators, transformers, and more
Motors are machines that convert electrical energy into mechanical...
Yes, transformers are categorized as electrical machines.
Transformers are considered electrical machines because they are used to transfer electrical energy between two or more circuits through electromagnetic induction.
They do not have any moving parts like motors or generators, but they still fall under the category of electrical machines.
Transformers play a crucial role in power distribution and voltage regulation i...
I appeared for an interview in Sep 2024.
Assignment was good thanks you hr
I applied via LinkedIn and was interviewed in Oct 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Projects of saving involve implementing cost-saving measures to improve efficiency and reduce expenses.
Analyze current processes to identify areas for improvement
Implement lean manufacturing techniques to reduce waste
Negotiate with suppliers for better pricing
Invest in automation to increase productivity
Train employees on cost-saving strategies
Track and monitor expenses to measure savings
Examples: implementing energy-e...
I applied via Campus Placement and was interviewed in Jun 2024. There was 1 interview round.
Maths ,reasoning, gk&gs,Technical
Top trending discussions
The duration of Mahle Anand Thermal Systems interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 43 interview experiences
Difficulty level
Duration
based on 375 reviews
Rating in categories
Junior Engineer
247
salaries
| ₹2.8 L/yr - ₹5 L/yr |
Oprating Engineer
123
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Engineer
80
salaries
| ₹3.6 L/yr - ₹6.7 L/yr |
Assistant Manager
74
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
71
salaries
| ₹4.4 L/yr - ₹7.8 L/yr |
JBM Group
Subros
Varroc Group
Endurance Technologies