Upload Button Icon Add office photos

Filter interviews by

M/S PROTOMAC CONSTRUCTION Deputy Manager Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Quants , Logical and Verbal reasoning are the three sections we were tested on

Round 3 - Technical 

(2 Questions)

  • Q1. Questions were asked based on my resume and my favourite subjects
  • Q2. Interview took place for 20 mins

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Deputy Manager interview:
  • Project management
Interview preparation tips for other job seekers - Prepare aptitude well and be thorough with resume and favourite subjects

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Ans. 

    Yes, corrections can be made in an invoice by following certain steps.

    • The correction should be made as soon as possible to avoid any confusion.

    • The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.

    • A new invoice should be created with the correct information and a reference to the original invoice.

    • The reason for the correction should be clearly stated on the new invoice.

    • Both the origin...

  • Answered by AI
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Gst Questions, Audit exposure, Past Experience and personal skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give your best and brief as told by interviewer

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I appeared for an interview before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in

I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. General accounting and tax related questions

Interview Preparation Tips

Topics to prepare for Kalpataru Projects International Deputy Manager interview:
  • Key Accounts
Interview preparation tips for other job seekers - Be confident and lead the interviewer they will see how confident you are

I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What is Experience in Oi; & Gas Sector in which Department
  • Ans. 

    I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.

    • I have worked in the Operations department of an oil and gas company for 5 years.

    • During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.

    • I have successfully managed various projects related to drilling, production optimization, and cost re...

  • Answered by AI
  • Q2. How much Experience in Planning Department
  • Q3. Where are you from
  • Q4. How do you Preparation of RA BILL
  • Ans. 

    Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.

    • Gather all necessary information such as product or service details, quantity, and pricing

    • Create a detailed invoice with clear descriptions and itemized costs

    • Include any applicable taxes or discounts

    • Ensure accuracy and completeness of the bill before submitting to the client

    • Follow up with th

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The job description may also give you ideas about questions the employer When an interviewer asks you to describe your strengths

I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Asked about grade of concrete and mix design

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a practical work about day to day activities
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About wtp, oht, sump, pump house, pipe laying, and about whole drinking water projects system.
Round 2 - HR 

(1 Question)

  • Q1. Ctc negotiation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Related to project life cycle and how to manage in intermediate levels
  • Q2. Regarding planning and programming procedures
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding methodology of works handled
  • Q2. Regarding work responsibilities performed
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a good experience

Tell us how to improve this page.

Compare M/S PROTOMAC CONSTRUCTION with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview