Improving production can be achieved by optimizing processes, increasing efficiency, and reducing waste.
Implement lean manufacturing principles to streamline operations
Invest in automation technology to increase productivity
Regularly analyze production data to identify bottlenecks and areas for improvement
Train employees on best practices and provide opportunities for continuous learning
Collaborate with suppliers to im
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
Assembly BIW production process involves various parameters to ensure weld quality.
Ensure proper fit-up of components before welding
Maintain correct welding parameters such as voltage, current, and travel speed
Use appropriate shielding gas and welding consumables
Regularly inspect and maintain welding equipment
Implement quality control measures such as visual inspection and non-destructive testing
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
posted on 10 Jan 2025
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
Five is a numerical value representing the quantity of five items.
Five is the third prime number.
There are five fingers on a human hand.
A pentagon has five sides.
A standard dice has five dots on one side.
Five S is a mnemonic used in the oil and gas industry to remember the key steps in drilling a well.
Safety - prioritize safety measures to prevent accidents
Survey - conduct a survey to determine the best location for drilling
Spud - begin drilling the well
Set casing - install casing to stabilize the wellbore
Squeeze - perform cement squeeze to seal off any leaks
Types of engines include internal combustion engines, steam engines, and electric engines.
Internal combustion engines: Most common type, fueled by gasoline or diesel (e.g. car engines)
Steam engines: Use steam to generate power (e.g. steam locomotives)
Electric engines: Powered by electricity (e.g. electric vehicles)
The company uses a total of 5 engines for production purposes.
There are 3 engines used for manufacturing equipment
There is 1 engine used for transportation vehicles
There is 1 backup engine in case of emergencies
Mathamatics resoning
based on 1 interview
Interview experience
Assistant Engineer
410
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Engineer
285
salaries
| ₹1.9 L/yr - ₹5 L/yr |
Quality Engineer
221
salaries
| ₹1.2 L/yr - ₹4.8 L/yr |
Production Engineer
182
salaries
| ₹1.2 L/yr - ₹5 L/yr |
Senior Engineer
142
salaries
| ₹3 L/yr - ₹8 L/yr |
Rane Holdings
Sundaram Clayton
Samvardhana Motherson Group
Bharat Forge