I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
ASPICE (Automotive SPICE) is a process framework for software development in the automotive industry.
ASPICE is a standard developed by the automotive industry to assess and improve software development processes.
It provides a framework for evaluating and improving the maturity of software development processes.
ASPICE defines a set of process areas and capability levels that organizations can achieve.
It helps in ensurin...
Doors is a requirements management tool used in software development.
Doors is used to capture, trace, analyze and manage requirements.
It helps in ensuring that all requirements are met and tracked throughout the development process.
Doors can be linked to other tools like JIRA for better collaboration.
It is widely used in industries like aerospace, defense, and automotive.
Doors has a user-friendly interface and provides...
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Sep 2020. There were 5 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 19 Jan 2021
I appeared for an interview in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
based on 1 interview
Interview experience
Design Engineer
144
salaries
| ₹3 L/yr - ₹9 L/yr |
Senior Engineer
110
salaries
| ₹7 L/yr - ₹20.4 L/yr |
Lead Engineer
91
salaries
| ₹10 L/yr - ₹23 L/yr |
Assistant Manager
84
salaries
| ₹8 L/yr - ₹21.1 L/yr |
Senior Design Engineer
68
salaries
| ₹5.5 L/yr - ₹12.5 L/yr |
Bosch
JBM Group
Samvardhana Motherson Group
Subros