I applied via Company Website and was interviewed in Aug 2021. There were 2 interview rounds.
Post-tensioning is a method of reinforcing concrete using high-strength steel strands or bars.
Post-tensioning is used to increase the strength and durability of concrete structures.
The process involves placing high-strength steel strands or bars in the concrete before it sets, and then tensioning them after the concrete has hardened.
The tensioning process compresses the concrete, making it stronger and more resistant t...
The code related to road bridge construction includes various standards and guidelines such as AASHTO, ACI, and ASTM.
AASHTO (American Association of State Highway and Transportation Officials) provides guidelines for design, construction, and maintenance of road bridges.
ACI (American Concrete Institute) provides standards for concrete materials and construction practices.
ASTM (American Society for Testing and Materials...
Top trending discussions
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 12 Oct 2021
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
posted on 12 Nov 2024
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.
Determine the area to be plastered
Calculate the quantity of materials required (cement, sand, water)
Determine the cost of materials per unit
Calculate the cost of labor per unit area
Include the cost of equipment and tools used
Add all costs to get the total cost of plastering
Example: For plas...
BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.
BBS provides details of reinforcement steel required for construction.
BOQ lists all the materials and quantities required for construction.
BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.
BOQ is used for building items like bricks, cement, sand, etc.
Both BBS and BOQ are importa...
posted on 30 Jun 2024
posted on 8 Mar 2024
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
based on 1 interview
Interview experience
based on 16 reviews
Rating in categories
Deputy Engineer
105
salaries
| ₹4.6 L/yr - ₹8.1 L/yr |
Assistant Bridge Engineer
69
salaries
| ₹3.8 L/yr - ₹6.5 L/yr |
Assistant Engineer
55
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Assistant Highway Engineer
49
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
42
salaries
| ₹3.2 L/yr - ₹6.4 L/yr |
ABCI Infrastructures
VIKRAN Engineering & Exim
The Louis Berger Group
Nesma & Partners