Filter interviews by
I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.
The process for preparing a Single Line Diagram (SLD) involves identifying all electrical components and their connections.
Identify all electrical components in the system
Determine the connections between the components
Represent the components and connections using standardized symbols
Include power sources, distribution panels, transformers, circuit breakers, switches, and loads
Ensure the diagram is clear, organized, a
Sizing a cable tray involves considering the number and type of cables, environmental conditions, and support spacing. Cable trays are classified by material (steel, aluminum, fiberglass) and size (light duty, medium duty, heavy duty).
Consider the number and type of cables to be installed in the cable tray
Take into account environmental conditions such as temperature, moisture, and corrosive elements
Determine the suppo...
A rig platform is a structure used in offshore drilling operations to support drilling equipment and personnel.
Rig platforms are typically located in bodies of water and are used for extracting oil and gas from beneath the seabed.
They provide a stable base for drilling rigs, equipment, and crew to operate in harsh offshore environments.
Rig platforms can be fixed (attached to the seabed) or floating (anchored to the sea...
EPC stands for Engineering, Procurement, and Construction. EPCIC stands for Engineering, Procurement, Construction, Installation, and Commissioning. FEED stands for Front End Engineering Design.
EPC projects involve the design, procurement, and construction of a project by a single contractor.
EPCIC projects include installation and commissioning in addition to the EPC scope.
FEED projects focus on the initial engineering...
The standards followed for cable trays are typically NEMA VE 1 and NEC, while the standards for earthing include IEEE 80 and IEC 60364.
Cable trays are usually designed according to NEMA VE 1 and NEC standards.
Earthing systems are typically designed following IEEE 80 and IEC 60364 standards.
Compliance with these standards ensures safety, reliability, and proper functioning of electrical systems.
For example, NEMA VE 1 pr...
Lux levels are calculated using the formula Lux = Lumens / Area (in square meters). Required lux levels vary depending on the specific application.
Lux levels are calculated by dividing the total lumens of light by the area in square meters that the light is illuminating.
For roads, recommended lux levels range from 10 to 20 lux for residential streets to 50 to 100 lux for highways.
Workstations typically require lux leve...
I am a highly skilled electrical design engineer with a proven track record of successfully completing projects on time and within budget.
I have a strong background in electrical engineering and design principles
I have experience working on a variety of projects, from small-scale residential to large-scale commercial
I am proficient in using CAD software and other design tools
I have excellent problem-solving skills and ...
My best quality is my attention to detail and problem-solving skills. I perceive the vision of your organization as innovative and focused on cutting-edge technology.
Attention to detail: I have a strong ability to meticulously review designs and catch any errors or inconsistencies.
Problem-solving skills: I enjoy tackling complex problems and finding creative solutions to overcome challenges.
Perception of organization's...
I expect to utilize my technical skills to design innovative electrical systems and contribute to the success of the company.
Expectation to work on challenging projects that allow for creativity and problem-solving
Desire to collaborate with a team of experienced engineers to learn and grow professionally
Goal to contribute to the development of cutting-edge technologies in the field of electrical design
Seeking new challenges and opportunities for professional growth.
Desire for new challenges and opportunities
Looking to expand skill set and knowledge
Seeking career advancement
Company restructuring or downsizing
Relocation to a different city or country
I led a team to implement a new ticketing system to streamline IT support processes.
Led a team to implement a new ticketing system
Streamlined IT support processes
Improved efficiency and response time
Trained staff on how to use the new system
I am a dedicated and hardworking individual with experience in operating machinery and ensuring smooth production processes.
Explain your relevant experience in operating machinery
Mention any certifications or training related to machine operation
Highlight your ability to troubleshoot and problem-solve in a fast-paced environment
Lamprell interview questions for popular designations
I applied via Recruitment Consultant and was interviewed before Jan 2019. There was 1 interview round.
WPS stands for Welding Procedure Specification. It is a document that provides detailed instructions for welding operations.
WPS is a written document that outlines the welding process, including materials, equipment, and techniques.
It specifies the welding parameters such as current, voltage, travel speed, and preheat temperature.
WPS ensures consistency and quality in welding operations by providing a standardized proc...
WPS and PQR are both related to welding procedures, but they serve different purposes.
WPS stands for Welding Procedure Specification, which outlines the specific welding parameters and techniques to be used for a particular welding job.
PQR stands for Procedure Qualification Record, which is a document that verifies the welder's ability to produce welds meeting the required standards.
WPS is prepared before the welding j...
Multiple repairs in the same joint can be identified by visual inspection and non-destructive testing.
Visual inspection can reveal signs of previous repairs such as weld spatter, grinding marks, or mismatched weld beads.
Non-destructive testing methods such as ultrasonic testing or radiography can detect hidden repairs or defects.
Documentation and record keeping can also help identify previous repairs in the same joint.
...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 6 interview rounds.
posted on 25 Aug 2023
Group discussion will be tough
posted on 29 Aug 2024
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 3 interview rounds.
End to end project phases involve initiation, planning, execution, monitoring and controlling, and closure.
Initiation: Define project scope, objectives, and stakeholders.
Planning: Develop project plan, schedule, and budget.
Execution: Implement project plan and deliver the desired outcomes.
Monitoring and Controlling: Track progress, identify issues, and make necessary adjustments.
Closure: Formalize project completion, h...
Scrum events include Sprint Planning, Daily Standup, Sprint Review, Sprint Retrospective
Sprint Planning: Team plans the work to be done in the upcoming sprint
Daily Standup: Team members discuss progress, plan for the day, and identify any obstacles
Sprint Review: Team demonstrates the work completed during the sprint to stakeholders
Sprint Retrospective: Team reflects on the sprint and identifies areas for improvement
A typical Business Requirements Document (BRD) includes project scope, objectives, stakeholders, functional requirements, non-functional requirements, assumptions, constraints, and acceptance criteria.
Project scope - defines the boundaries of the project
Objectives - goals to be achieved by the project
Stakeholders - individuals or groups affected by the project
Functional requirements - specific features and functions of...
1 que was asked regading linked list , little bit complex
Some of the top questions asked at the Lamprell interview -
based on 9 interviews
Interview experience
based on 155 reviews
Rating in categories
Safety Officer
7
salaries
| ₹5.8 L/yr - ₹14.5 L/yr |
Welder
6
salaries
| ₹4 L/yr - ₹11 L/yr |
Material Controller
5
salaries
| ₹12 L/yr - ₹14 L/yr |
Pipe Fabricator
5
salaries
| ₹0.6 L/yr - ₹10.5 L/yr |
QA QC Engineer
5
salaries
| ₹22.5 L/yr - ₹25 L/yr |
Reliance Industries
Indian Oil Corporation
Shell
Bharat Petroleum