Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by L&T Power Transmission & Distribution Team. If you also belong to the team, you can get access from here

L&T Power Transmission & Distribution Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

L&T Power Transmission & Distribution Interview Questions and Answers

Updated 12 Jan 2025

L&T Power Transmission & Distribution Interview Experiences

Popular Designations

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical
  • Q2. Technical
Round 2 - Technical 

(2 Questions)

  • Q1. Technical questions.
  • Q2. Technical

Interview Preparation Tips

Topics to prepare for L&T Power Transmission & Distribution Electrical Engineer interview:
  • Electrical Machines
  • Transformers
Interview preparation tips for other job seekers - Electrical Engineer Question

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (11)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Behavioral 

(4 Questions)

  • Q1. Only cv need to check the background
  • Q2. Then select this post
  • Q3. What is your institution?
  • Q4. As per instruction in my profile or other problems
Round 2 - Direct recruitment 

(2 Questions)

  • Q1. Only formula for asking for construction used
  • Q2. What is cement?
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials.

    • Cement is a fine powder made from limestone, clay, and other minerals.

    • When mixed with water, cement forms a paste that hardens and binds materials together.

    • Common types of cement include Portland cement, which is used in most construction projects.

    • Cement is a key ingredient in concrete, mortar, and grout.

    • It plays a cr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Properly working time to time and advice to good 😊
Hard working.

Civil Site Engineer & Site Incharge Interview Questions asked at other Companies

Q1. steel lenght which will be not considered as wastage?
View answer (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Like current ctc , expected ctc, about family
  • Q2. Why you want to change job. Expected ctc.
Round 3 - One-on-one 

(1 Question)

  • Q1. Type of lit up TG rolling procedure. Bed material specification.
  • Ans. 

    TG rolling procedure and bed material specification are important for Operations Engineer.

    • TG rolling procedure refers to the process of rolling the turbine generator to ensure smooth operation.

    • Bed material specification refers to the type and quality of material used in the fluidized bed boiler.

    • Both are crucial for efficient and safe operation of power plants.

    • TG rolling procedure involves checking alignment, clearance,...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your preparation. Keep good knowledge of lit up.

Interview Questionnaire 

5 Questions

  • Q1. What is bulk density ?
  • Ans. 

    Bulk density refers to the mass of a substance per unit volume, excluding any voids or air spaces.

    • It is a measure of how densely packed the particles or molecules are in a given volume.

    • Bulk density is commonly used in industries such as mining, agriculture, and pharmaceuticals.

    • It is calculated by dividing the mass of the substance by its volume.

    • For example, the bulk density of a soil sample can indicate its compaction ...

  • Answered by AI
  • Q2. Bulk density is the wet soil weight/volume.
  • Q3. What is target mean strength? ?
  • Ans. 

    Target mean strength is the desired strength level of a product or material.

    • It is the strength level that a product or material is designed to meet or exceed.

    • It is determined based on the intended use and expected stresses on the product or material.

    • It is often used in quality control to ensure that products meet the desired strength level.

    • For example, the target mean strength of a steel beam used in construction may b...

  • Answered by AI
  • Q4. Target mean strength is Caracterstrict strength+1.65multiply standard deviation.
  • Q5. How many types of brick test and is code?
  • Ans. 

    There are several types of brick tests and corresponding IS codes.

    • Compressive strength test (IS code: IS 3495 Part 1)

    • Water absorption test (IS code: IS 3495 Part 2)

    • Efflorescence test (IS code: IS 3495 Part 3)

    • Dimensional tolerance test (IS code: IS 3495 Part 4)

    • Warpage test (IS code: IS 3495 Part 5)

    • Soundness test (IS code: IS 3495 Part 6)

    • Density test (IS code: IS 3495 Part 7)

  • Answered by AI

I applied via Naukri.com and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Basic Core PHP,MYSQL Questions
  • Q2. HTML,JS ,AJax question
Round 2 - Coding Test 

Employee Add, Update,Delete using any framework with conditions

Round 3 - HR 

(1 Question)

  • Q1. Basic Introduction,Previous experience related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Before attend interview, Ready for the test

I applied via Company Website and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Which method following in store
  • Ans. Material received & issue in system, documents verification,mis report, inventory management,
  • Answered Anonymously
  • Q2. Which system use in previous company?
  • Ans. 

    We used an ERP system called SAP in my previous company.

    • Previous company used SAP as the primary system.

    • SAP helped in streamlining business processes and improving efficiency.

    • It integrated various departments like finance, HR, and supply chain.

    • SAP provided real-time data and analytics for informed decision-making.

    • Employees were trained to use SAP for their respective roles.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best policy & rools regulations,
Vision and mission are Great,
Work sop best policy

I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Why you are leaving your previous company ?
  • Ans. 

    Seeking new challenges and growth opportunities.

    • Looking for a company that aligns better with my career goals.

    • Desire to work on more complex projects.

    • Seeking a better work-life balance.

    • Company downsizing or restructuring.

    • Limited opportunities for advancement or professional development.

    • Relocation or personal reasons.

  • Answered by AI
  • Q2. Technical skill questions?
  • Ans. Need to know all testing about electrical equipment
  • Answered Anonymously
  • Q3. Testing about all electrical equipment ?
  • Q4. Relay testing questions?
  • Q5. Drwaing related questions?
  • Q6. CT knee point voltage

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be positive and confident own yourself and need to know all testing and erection related answers.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2022. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Information old Compny worked

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear to the interview round’s well tell us all your details openly we will not panic in any way

IT Solution Expert Interview Questions & Answers

Siemens Energy user image Anonymous

posted on 3 May 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions related to the they’re hiring!
Round 3 - HR 

(1 Question)

  • Q1. General HR discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge comes through experience don’t rush!

I applied via Approached by Company

Round 1 - Technical 

(1 Question)

  • Q1. Inverters understanding,

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on work experience.. stress more on your par work.. highlight are best cost optimisation points

L&T Power Transmission & Distribution Interview FAQs

How many rounds are there in L&T Power Transmission & Distribution interview?
L&T Power Transmission & Distribution interview process usually has 2 rounds. The most common rounds in the L&T Power Transmission & Distribution interview process are Technical and Behavioral.
What are the top questions asked in L&T Power Transmission & Distribution interview?

Some of the top questions asked at the L&T Power Transmission & Distribution interview -

  1. What is ceme...read more
  2. Only formula for asking for construction u...read more
  3. Only cv need to check the backgro...read more

Tell us how to improve this page.

L&T Power Transmission & Distribution Interview Process

based on 6 interviews

Interview experience

4.8
  
Excellent
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 416 Interviews
KEC International Interview Questions
4.0
 • 297 Interviews
ABB Interview Questions
4.1
 • 233 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
Sterlite Power Interview Questions
4.0
 • 25 Interviews
View all

L&T Power Transmission & Distribution Reviews and Ratings

based on 141 reviews

4.3/5

Rating in categories

4.4

Skill development

3.8

Work-life balance

4.1

Salary

4.3

Job security

4.1

Company culture

4.1

Promotions

4.1

Work satisfaction

Explore 141 Reviews and Ratings
Project Accountant
6 salaries
unlock blur

₹7 L/yr - ₹10.2 L/yr

Construction Management
5 salaries
unlock blur

₹20.6 L/yr - ₹36 L/yr

Manager
4 salaries
unlock blur

₹12 L/yr - ₹15 L/yr

Assistant Manager
4 salaries
unlock blur

₹12 L/yr - ₹30.2 L/yr

Senior Electrical Engineer
4 salaries
unlock blur

₹5.1 L/yr - ₹8.7 L/yr

Explore more salaries
Compare L&T Power Transmission & Distribution with

Siemens

4.1
Compare

ABB

4.1
Compare

GE Vernova T&D India

4.3
Compare

Schneider Electric

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview