L&T Power Transmission & Distribution Interview Questions and Answers

Updated 12 Jan 2025

L&T Power Transmission & Distribution Interview Experiences

Popular Designations

2 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Behavioral 

(4 Questions)

  • Q1. Only cv need to check the background
  • Q2. Then select this post
  • Q3. What is your institution?
  • Q4. As per instruction in my profile or other problems
Round 2 - Direct recruitment 

(2 Questions)

  • Q1. Only formula for asking for construction used
  • Q2. What is cement?
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials.

    • Cement is a fine powder made from limestone, clay, and other minerals.

    • When mixed with water, cement forms a paste that hardens and binds materials together.

    • Common types of cement include Portland cement, which is used in most construction projects.

    • Cement is a key ingredient in concrete, mortar, and grout.

    • It plays a cr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Properly working time to time and advice to good 😊
Hard working.

Civil Site Engineer & Site Incharge Interview Questions asked at other Companies

Q1. steel lenght which will be not considered as wastage?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical
  • Q2. Technical
Round 2 - Technical 

(2 Questions)

  • Q1. Technical questions.
  • Q2. Technical

Interview Preparation Tips

Topics to prepare for L&T Power Transmission & Distribution Electrical Engineer interview:
  • Electrical Machines
  • Transformers
Interview preparation tips for other job seekers - Electrical Engineer Question

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)

Interview questions from similar companies

I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. Starting from curriculum to end up with experience and some small personal details in between
  • Answered Anonymously
  • Q2. Where do you see yourself in next 5 year
  • Ans. Look at the company hierarchy and look at yourself as growth perspective.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Please ensure that your resume and skills set should be matched with JD it will boost your chance to get a call.

All the best for future.

I appeared for an interview in Sep 2020.

Interview Questionnaire 

1 Question

  • Q1. There was many technical and project related questions they asked me.

Interview Preparation Tips

Interview preparation tips for other job seekers - We should prepare for competency as per our core functions

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

I applied via Recruitment Consultant and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Position & JD

Interview Preparation Tips

Interview preparation tips for other job seekers - Please go thorugh the JD throughly to succeed.

Interview Questionnaire 

1 Question

  • Q1. VRV system, mep related, fire fighting,

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How will you analyse the total consumption of diesel in equipment
  • Ans. 

    To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.

    • Collect data on equipment usage and fuel consumption

    • Calculate fuel efficiency by dividing fuel consumption by equipment usage

    • Compare fuel efficiency across different equipment to identify outliers

    • Identify factors that may affect fuel efficiency, such as maintenance or operator behavior

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be precise and explain whatever you know

I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer wanted to best knowledge of your profile and your communication skills .
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Working Experience in electrical project
  • Ans. 

    I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.

    • Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.

    • Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.

    • Collaborated wi...

  • Answered by AI
  • Q2. Working process of project
  • Ans. 

    The working process of a project involves planning, execution, monitoring, and completion.

    • Planning phase includes defining project goals, scope, and deliverables.

    • Execution phase involves assigning tasks, managing resources, and implementing the project plan.

    • Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.

    • Completion phase involves finalizing deliverables, conducting proj

  • Answered by AI
  • Q3. From survey execution up to billing and closer
  • Ans. 

    The question is asking about the process from survey execution to billing and closure.

    • Survey execution involves designing and distributing surveys to collect data.

    • Data collected from surveys is then analyzed and processed.

    • Based on the analysis, billing is done for the services provided.

    • Finally, the project is closed, and any remaining tasks or documentation are completed.

  • Answered by AI

L&T Power Transmission & Distribution Interview FAQs

How many rounds are there in L&T Power Transmission & Distribution interview?
L&T Power Transmission & Distribution interview process usually has 2 rounds. The most common rounds in the L&T Power Transmission & Distribution interview process are Technical and Behavioral.
What are the top questions asked in L&T Power Transmission & Distribution interview?

Some of the top questions asked at the L&T Power Transmission & Distribution interview -

  1. What is ceme...read more
  2. Only formula for asking for construction u...read more
  3. Only cv need to check the backgro...read more

Tell us how to improve this page.

L&T Power Transmission & Distribution Interview Process

based on 6 interviews

Interview experience

4.8
  
Excellent
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 227 Interviews
ReNew Interview Questions
4.2
 • 89 Interviews
Vestas Interview Questions
4.3
 • 88 Interviews
Jakson Group Interview Questions
4.2
 • 81 Interviews
Siemens Energy Interview Questions
4.1
 • 75 Interviews
Waaree Energies Interview Questions
3.9
 • 59 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
View all

L&T Power Transmission & Distribution Reviews and Ratings

based on 142 reviews

4.3/5

Rating in categories

4.4

Skill development

3.8

Work-life balance

4.1

Salary

4.3

Job security

4.1

Company culture

4.1

Promotions

4.1

Work satisfaction

Explore 142 Reviews and Ratings
Project Accountant
6 salaries
unlock blur

₹7 L/yr - ₹10.2 L/yr

Construction Management
5 salaries
unlock blur

₹20.6 L/yr - ₹36 L/yr

Manager
4 salaries
unlock blur

₹12 L/yr - ₹15 L/yr

Assistant Manager
4 salaries
unlock blur

₹12 L/yr - ₹30.2 L/yr

Senior Electrical Engineer
4 salaries
unlock blur

₹5.1 L/yr - ₹8.7 L/yr

Explore more salaries
Compare L&T Power Transmission & Distribution with

Adani Power

3.9
Compare

ReNew

4.2
Compare

Adani Green Energy

4.1
Compare

Vestas

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview