Calibration procedure involves comparing the measurement device with a known standard to ensure accuracy.
Select a known standard with a higher accuracy than the device being calibrated
Perform measurements on the standard and record the readings
Compare the readings with the device being calibrated
Adjust the device if necessary to match the standard
Repeat the process until the readings match within an acceptable range
Hazardous zones are classified based on the likelihood of explosive gas or dust. Protection techniques include explosion-proof equipment and ventilation.
Hazardous zones are classified into Zone 0, Zone 1, and Zone 2 based on the likelihood of explosive gas or dust.
Zone 0 is where explosive gas or dust is present continuously or for long periods of time.
Zone 1 is where explosive gas or dust is likely to occur during nor...
Top trending discussions
posted on 9 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
posted on 12 Feb 2025
I appeared for an interview before Feb 2024.
SCADA stands for Supervisory Control and Data Acquisition, while PLC stands for Programmable Logic Controller.
SCADA is a system used for monitoring and controlling industrial processes in real-time.
PLC is a type of industrial computer control system that continuously monitors the state of input devices and makes decisions based upon a custom program to control the state of output devices.
SCADA systems are typically use...
I want to join Egis because of their reputation for innovation and commitment to excellence in the field of Electrical & Instrumentation engineering.
Egis has a strong reputation for innovation and cutting-edge technology in the field of Electrical & Instrumentation engineering.
I am impressed by Egis' commitment to excellence and their track record of successful projects.
I believe that joining Egis will provide ...
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
Assistant Manager
726
salaries
| ₹4.9 L/yr - ₹19 L/yr |
Manager
328
salaries
| ₹10.2 L/yr - ₹30 L/yr |
Senior Engineer
253
salaries
| ₹4.3 L/yr - ₹12 L/yr |
Piping Engineer
138
salaries
| ₹2.5 L/yr - ₹11 L/yr |
Assistant General Manager
118
salaries
| ₹17 L/yr - ₹35 L/yr |
AECOM
Apco Infratech
Saipem
Aarvee Associates