Filter interviews by
I applied via AmbitionBox and was interviewed in Jul 2024. There was 1 interview round.
The question is unclear and does not make sense.
The question seems to be incomplete or unclear.
It is difficult to provide a specific answer without more context or clarification.
It is possible that there may be a typo or error in the question.
Bent up bars in slabs provide additional strength and prevent cracking.
Bent up bars help in distributing loads evenly across the slab.
They prevent cracking and improve the overall durability of the structure.
They provide additional reinforcement at the corners and edges of the slab.
Bent up bars are commonly used in areas where heavy loads are expected, such as in industrial buildings or parking garages.
One way slab is a type of reinforced concrete slab where the ratio of longer span to shorter span is greater than or equal to 2.
One way slab is supported on two opposite sides only.
It is designed to carry loads predominantly in one direction.
Commonly used in buildings with rectangular floor plans.
Examples include slabs in residential buildings, offices, and commercial spaces.
Effective depth of beam is the distance from the extreme compression fiber to the centroid of the tensile reinforcement.
Effective depth is crucial for determining the capacity of a beam to resist bending moments.
It is calculated as the overall depth of the beam minus the cover to the reinforcement.
For example, if a beam has a total depth of 500mm and the cover to the reinforcement is 50mm, the effective depth would be
Top trending discussions
posted on 24 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There were 4 interview rounds.
Ok i am ready for interview
Do you best my life is all efforts
My side can do best in company policy
posted on 14 Oct 2024
posted on 19 Dec 2024
I worked at XYZ Company as a Senior Engineer. My family background includes a mix of professionals and entrepreneurs.
Worked at XYZ Company as a Senior Engineer
Family background includes professionals and entrepreneurs
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
posted on 12 Mar 2024
Project safety refers to the measures and protocols put in place to ensure the well-being and protection of individuals involved in a project.
Ensures the physical and mental well-being of workers and stakeholders
Reduces the risk of accidents, injuries, and fatalities
Compliance with safety regulations and standards
Enhances productivity and efficiency by minimizing disruptions
Builds trust and reputation with clients and ...
Project scheduling is the process of creating a timeline for completing tasks and milestones within a project.
Identifying project tasks and their dependencies
Estimating the time required for each task
Sequencing tasks in the most efficient order
Assigning resources to tasks
Monitoring progress and adjusting the schedule as needed
In a fire case situation at a project, it is crucial to follow safety protocols and evacuate all personnel immediately.
Ensure all personnel are aware of the emergency procedures and evacuation routes.
Contact emergency services and alert them of the situation.
Use fire extinguishers if safe to do so, but prioritize safety of personnel.
Account for all personnel after evacuation to ensure everyone is safe.
Investigate the c...
I have used project management tools such as Jira, Trello, and Asana in previous projects.
Jira
Trello
Asana
I have experience using CAD tools such as AutoCAD, SolidWorks, and CATIA for designing and modeling.
AutoCAD
SolidWorks
CATIA
posted on 14 Jun 2024
I applied via LinkedIn and was interviewed in Feb 2024. There were 4 interview rounds.
How to manage site structure to finishing work
Technical/ mathematics
posted on 13 Jan 2024
I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.
The test procedures for cement, steel, coarse aggregate, and sand involve various physical and chemical tests to ensure quality and suitability for construction purposes.
Cement: Tests include fineness, setting time, compressive strength, soundness, and chemical composition.
Steel: Tests involve tensile strength, yield strength, elongation, and chemical composition.
Coarse Aggregate: Tests include sieve analysis, specific...
The grade of concrete refers to its strength and durability.
Concrete is graded based on its compressive strength, measured in megapascals (MPa).
Common grades of concrete include M10, M15, M20, M25, etc.
The higher the grade, the stronger the concrete.
Different grades of concrete are used for different applications, such as foundations, slabs, columns, etc.
28 days cube strength is a measure of the compressive strength of concrete after 28 days of curing.
28 days cube strength refers to the compressive strength of concrete cubes after they have been cured for 28 days.
It is an important parameter to assess the quality and durability of concrete.
The value of 28 days cube strength is typically expressed in megapascals (MPa) or pounds per square inch (psi).
It is determined by ...
based on 1 review
Rating in categories
Civil Site Engineer
44
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Civil Engineer
18
salaries
| ₹1.8 L/yr - ₹5.4 L/yr |
Site Engineer
12
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Project Manager
9
salaries
| ₹9 L/yr - ₹20.2 L/yr |
Lab Technician
8
salaries
| ₹0.2 L/yr - ₹2.9 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd