Premium Employer

i

This company page is being actively managed by KONE Team. If you also belong to the team, you can get access from here

KONE Verified Tick Work with us arrow

Compare button icon Compare button icon Compare

Filter interviews by

KONE Interview Questions and Answers

Updated 30 Jun 2025
Popular Designations

58 Interview questions

An Installation & Service Engineer was asked 2mo ago
Q. What is the process for fixing a motor?
Ans. 

Fixing a motor involves diagnosing issues, disassembling, repairing or replacing parts, and reassembling for proper functionality.

  • 1. Diagnose the issue: Check for unusual noises, overheating, or failure to start.

  • 2. Disconnect power: Ensure safety by turning off power supply before working on the motor.

  • 3. Disassemble the motor: Remove covers and components to access internal parts.

  • 4. Inspect components: Look for wo...

View all Installation & Service Engineer interview questions
An Installation & Service Engineer was asked 2mo ago
Q. What is the process for working with Switched Mode Power Supplies (SMPS)?
Ans. 

Working with SMPS involves understanding their design, operation, and troubleshooting techniques for efficient power conversion.

  • Understand the basic operation of SMPS: They convert AC to DC using high-frequency switching.

  • Familiarize yourself with components: Key components include transformers, inductors, capacitors, and switching devices like MOSFETs.

  • Learn about different topologies: Common types include buck, bo...

View all Installation & Service Engineer interview questions
An Installation & Service Engineer was asked 2mo ago
Q. What is the power factor?
Ans. 

Power factor measures the efficiency of electrical power usage, indicating how effectively electrical energy is converted into useful work.

  • Power factor (PF) is the ratio of real power (kW) to apparent power (kVA).

  • A power factor of 1 (or 100%) indicates all the power is being effectively converted into work.

  • Low power factor (e.g., 0.5) means more apparent power is needed for the same amount of work, leading to inef...

View all Installation & Service Engineer interview questions
An Installation Executive was asked 3mo ago
Q. What is the installation process?
Ans. 

The installation process involves planning, executing, and verifying the setup of systems or equipment.

  • 1. Planning: Assess requirements and create a detailed installation plan.

  • 2. Preparation: Gather necessary tools and materials, ensuring compatibility.

  • 3. Execution: Follow the plan to install equipment, such as software or hardware.

  • 4. Testing: Verify functionality through tests to ensure proper operation.

  • 5. Docume...

View all Installation Executive interview questions
An Elevator Installation Technician was asked 8mo ago
Q. How do you align elevator rails?
Ans. 

Rail alignment is achieved by ensuring the rails are straight, level, and properly spaced.

  • Use a laser level to check for straightness and levelness of the rails

  • Measure the distance between the rails to ensure proper spacing

  • Adjust the rail supports as needed to achieve proper alignment

  • Check for any obstructions or debris that may affect alignment

  • Test the alignment by running the elevator car up and down the rails

View all Elevator Installation Technician interview questions
An Elevator Installation Technician was asked 8mo ago
Q. How do you install a motor?
Ans. 

Motor installation involves mounting the motor securely and connecting it to the elevator system.

  • Securely mount the motor to the designated location in the elevator shaft.

  • Connect the motor to the power source and control panel using appropriate wiring.

  • Ensure proper alignment and tension of the motor belts for smooth operation.

  • Test the motor to ensure it is functioning correctly before putting it into regular use.

View all Elevator Installation Technician interview questions
An Elevator Installation Technician was asked 8mo ago
Q. How do you install an elevator cabin?
Ans. 

Cabin installation involves precise assembly, alignment, and safety checks to ensure smooth elevator operation.

  • 1. Prepare the site: Ensure the shaft is clean and free of debris before installation.

  • 2. Assemble the cabin: Follow manufacturer guidelines to assemble the cabin components accurately.

  • 3. Install the cabin: Use a hoist to lift the cabin into the shaft, ensuring it is level and aligned with the rails.

  • 4. Con...

View all Elevator Installation Technician interview questions
Are these interview questions helpful?
A Data Scientist Intern was asked 10mo ago
Q. How would you read a CSV file in Python?
Ans. 

Use pandas library to read csv files in Python.

  • Import pandas library: import pandas as pd

  • Use pd.read_csv() function to read csv file

  • Specify file path as argument in read_csv() function

  • Assign the result to a variable to store the data

  • Example: df = pd.read_csv('file.csv')

View all Data Scientist Intern interview questions
A Data Scientist Intern was asked 10mo ago
Q. Tell me about the libraries you have used in Python.
Ans. 

I have used libraries like NumPy, Pandas, Matplotlib, and Scikit-learn in Python for data analysis and machine learning tasks.

  • NumPy: Used for numerical computing and array operations.

  • Pandas: Used for data manipulation and analysis.

  • Matplotlib: Used for data visualization.

  • Scikit-learn: Used for machine learning algorithms and model building.

View all Data Scientist Intern interview questions
A Data Scientist Intern was asked 10mo ago
Q. Write an SQL query.
Ans. 

SQL queries allow users to retrieve and manipulate data from databases using structured commands.

  • SELECT statement: Used to select data from a database. Example: SELECT * FROM employees;

  • WHERE clause: Filters records based on specified conditions. Example: SELECT * FROM employees WHERE age > 30;

  • JOIN operations: Combines rows from two or more tables based on a related column. Example: SELECT * FROM orders JOIN cus...

View all Data Scientist Intern interview questions

KONE Interview Experiences

117 interviews found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Kone instlater (TA) mod job
  • Q2. I m intrest in job work exprance is Abal abal
  • Q3. Thes is a smart elavoter and the way safety from clound
  • Q4. I m 5 year exprance and I plajer my work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There were 4 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Mujhe kone company me service engineer ke liye join karna hai
  • Q2. Kone is the best company
Round 2 - HR 

(2 Questions)

  • Q1. Good company kone
  • Q2. Good company kone
Round 3 - HR 

(2 Questions)

  • Q1. Good company kone
  • Q2. Good company kone
Round 4 - Technical 

(2 Questions)

  • Q1. Good company kone
  • Q2. Good company kone

Interview Preparation Tips

Interview preparation tips for other job seekers - Service engineer and maintenance
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Elevator template fixing in shaft
  • Ans. 

    Elevator template fixing in shaft involves securing the template to the shaft walls for accurate installation of elevator components.

    • Ensure the template is properly aligned with the shaft walls

    • Use appropriate fasteners to secure the template in place

    • Check for any obstructions or obstacles that may affect the installation process

  • Answered by AI
  • Q2. Entrance frame install
  • Q3. How to Motor install
  • Ans. 

    Motor installation involves mounting the motor securely and connecting it to the elevator system.

    • Securely mount the motor to the designated location in the elevator shaft.

    • Connect the motor to the power source and control panel using appropriate wiring.

    • Ensure proper alignment and tension of the motor belts for smooth operation.

    • Test the motor to ensure it is functioning correctly before putting it into regular use.

  • Answered by AI
  • Q4. Cabin install how
  • Ans. 

    Cabin installation involves precise assembly, alignment, and safety checks to ensure smooth elevator operation.

    • 1. Prepare the site: Ensure the shaft is clean and free of debris before installation.

    • 2. Assemble the cabin: Follow manufacturer guidelines to assemble the cabin components accurately.

    • 3. Install the cabin: Use a hoist to lift the cabin into the shaft, ensuring it is level and aligned with the rails.

    • 4. Connect ...

  • Answered by AI
  • Q5. Rail alignment how
  • Ans. 

    Rail alignment is achieved by ensuring the rails are straight, level, and properly spaced.

    • Use a laser level to check for straightness and levelness of the rails

    • Measure the distance between the rails to ensure proper spacing

    • Adjust the rail supports as needed to achieve proper alignment

    • Check for any obstructions or debris that may affect alignment

    • Test the alignment by running the elevator car up and down the rails

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Mar 2025. There was 0 interview round.

  • Q1. Plumb drop and bracket fixing
  • Q2. Customer handling
  • Q3. Rail hosting and rail alignment
  • Q4. Motor wasting with wiring
  • Q5. Roping door fixing whith safety
  • Q6. Car body assembly

Maintenance Technician Interview Questions & Answers

user image linuaisw eliyas

posted on 31 May 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. You know about KFM?
  • Ans. 

    KFM stands for Key Facility Management, focusing on optimizing facility operations and maintenance.

    • KFM involves managing physical assets like buildings and equipment efficiently.

    • It includes preventive maintenance to reduce downtime, such as regular HVAC checks.

    • KFM utilizes technology for monitoring systems, like using IoT sensors for real-time data.

    • It emphasizes sustainability practices, such as energy-efficient upgrad...

  • Answered by AI
  • Q2. Which are the basic modules?
  • Ans. 

    Basic modules in maintenance include mechanical, electrical, plumbing, HVAC, and safety systems.

    • Mechanical: Involves machinery repair and maintenance, e.g., motors and pumps.

    • Electrical: Covers wiring, circuit breakers, and lighting systems.

    • Plumbing: Focuses on water supply and drainage systems, e.g., pipes and fixtures.

    • HVAC: Deals with heating, ventilation, and air conditioning systems.

    • Safety: Ensures compliance with s...

  • Answered by AI
  • Q3. Types of controller, machine?
  • Ans. 

    Controllers in machines regulate operations, ensuring efficiency and precision in various applications.

    • 1. Programmable Logic Controllers (PLCs) - Used in industrial automation for controlling machinery.

    • 2. Distributed Control Systems (DCS) - Common in large-scale processes like oil refining.

    • 3. Supervisory Control and Data Acquisition (SCADA) - Monitors and controls infrastructure and facility-based processes.

    • 4. Motion C...

  • Answered by AI
  • Q4. Sill to sill clearence
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

It was a written round consists of Apti, coding and Verbal, cognitive.

Round 2 - Technical 

(3 Questions)

  • Q1. What is the features of Java and difference between JDK, JVM, JRE?
  • Ans. 

    Java is a popular programming language known for its features like platform independence, object-oriented programming, and automatic memory management.

    • JDK (Java Development Kit) is a software development kit used for developing Java applications. It includes JRE, compiler, debugger, and other tools.

    • JVM (Java Virtual Machine) is an abstract machine that provides a runtime environment for Java bytecode to be executed. It...

  • Answered by AI
  • Q2. Cocept of Inheritance
  • Ans. 

    Inheritance is a concept in object-oriented programming where a class inherits properties and behaviors from another class.

    • Inheritance allows for code reusability by creating a new class that is based on an existing class.

    • The new class, known as the subclass or derived class, inherits attributes and methods from the parent class, known as the superclass or base class.

    • Subclasses can also add new attributes or methods, o...

  • Answered by AI
  • Q3. And Many more questions related to JAVA, DSA, and React,Js
Round 3 - One-on-one 

(1 Question)

  • Q1. React js related questions and Javascript
Round 4 - HR 

(1 Question)

  • Q1. Family Background , relocation

Interview Preparation Tips

Topics to prepare for KONE Full Stack Developer interview:
  • Java
  • React.Js
  • DSA
  • Node.Js
  • Javascript
Interview preparation tips for other job seekers - Prepare well in React and DSA.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. MBM work procedure, CarTop Entry, Pit Entry Access , Take-5
  • Q2. Lift Running Clearance, V3F Working Principle, Encoder Function, Open Loop and closed Loop Different
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical questions core subject
  • Q2. Core subject related question you must attempt all the questions no negative marking
Round 2 - Group Discussion 

My Gd topic was AI will take job or create job

Round 3 - One-on-one 

(2 Questions)

  • Q1. Panel interview
  • Q2. Basic questions about life then technical questions and about elevator industry

Interview Preparation Tips

Topics to prepare for KONE Installation Engineer interview:
  • Thermodynamics
  • Automobile Engineering
  • strength of material
Interview preparation tips for other job seekers - You must read your core subject project you made in your final year also do read about elevator

Technician Interview Questions & Answers

user image Anonymous

posted on 21 Apr 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Main motor roping
  • Q2. Guide rail alignment
  • Q3. Shaft Plum dropping

Interview Questions & Answers

user image Anonymous

posted on 17 Apr 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. What did you learn over the course of one year?
  • Ans. 

    Over the past year, I learned the importance of adaptability, teamwork, and continuous learning in a fast-paced environment.

    • Adaptability: I learned to quickly adjust to changing project requirements, such as when a client shifted their priorities mid-project.

    • Teamwork: Collaborating with cross-functional teams improved my communication skills, especially during a project where we had to integrate feedback from multiple ...

  • Answered by AI
  • Q2. Can you introduce yourself?
  • Ans. 

    I am a passionate Customer Solution Engineer with a strong background in technology and customer service, dedicated to solving complex problems.

    • Background in Computer Science, with a focus on software development and systems integration.

    • Experience in collaborating with cross-functional teams to deliver tailored solutions, such as implementing a CRM system for a retail client.

    • Strong communication skills, demonstrated by...

  • Answered by AI
  • Q3. Can you describe the project you worked on during your college studies?
  • Ans. 

    Developed a web-based application for managing student projects, enhancing collaboration and tracking progress.

    • Designed a user-friendly interface using HTML, CSS, and JavaScript.

    • Implemented a database using MySQL to store project details and user information.

    • Utilized Git for version control, enabling collaboration among team members.

    • Conducted user testing to gather feedback and improve application functionality.

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about KONE?
Ask anonymously on communities.

KONE Interview FAQs

How many rounds are there in KONE interview?
KONE interview process usually has 2-3 rounds. The most common rounds in the KONE interview process are Technical, HR and Resume Shortlist.
How to prepare for KONE interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KONE. The most common topics and skills that interviewers at KONE expect are Elevators, Sales, Direct Sales, Lifts and Sales Engineering.
What are the top questions asked in KONE interview?

Some of the top questions asked at the KONE interview -

  1. What is Environmental Compliance? Why is it important? How is it linked to P...read more
  2. Different Types of Elevator. The different types of lifts or elevators include ...read more
  3. Types of motor used for Lift installati...read more
What are the most common questions asked in KONE HR round?

The most common HR questions asked in KONE interview are -

  1. What are your strengths and weakness...read more
  2. Tell me about yourse...read more
  3. What are your salary expectatio...read more
How long is the KONE interview process?

The duration of KONE interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.1/5

based on 116 interview experiences

Difficulty level

Easy 19%
Moderate 65%
Hard 17%

Duration

Less than 2 weeks 69%
2-4 weeks 15%
4-6 weeks 6%
6-8 weeks 4%
More than 8 weeks 7%
View more
Join KONE Dedicated to people flow

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 249 Interviews
John Deere Interview Questions
4.1
 • 244 Interviews
Caterpillar Inc Interview Questions
4.2
 • 185 Interviews
Atlas Copco Interview Questions
4.2
 • 93 Interviews
Hitachi Interview Questions
4.0
 • 84 Interviews
Schindler Interview Questions
4.0
 • 83 Interviews
Toshiba Interview Questions
4.0
 • 29 Interviews
View all

KONE Reviews and Ratings

based on 1.5k reviews

4.1/5

Rating in categories

3.8

Skill development

4.1

Work-life balance

3.7

Salary

4.1

Job security

4.0

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 1.5k Reviews and Ratings
Assistant Manager- Modernization Sales

Hyderabad / Secunderabad

10-15 Yrs

Not Disclosed

Software Test Engineer

Chennai

8-13 Yrs

Not Disclosed

Regional Procurement Manager, Logistics - APM

Chennai

10-20 Yrs

Not Disclosed

Explore more jobs
Design Engineer
210 salaries
unlock blur

₹3.3 L/yr - ₹7.4 L/yr

Assistant Manager
149 salaries
unlock blur

₹7.8 L/yr - ₹21 L/yr

Senior Engineer
140 salaries
unlock blur

₹7.9 L/yr - ₹13.4 L/yr

Engineer
116 salaries
unlock blur

₹2.4 L/yr - ₹10.3 L/yr

Process Agent
109 salaries
unlock blur

₹2.3 L/yr - ₹5.4 L/yr

Explore more salaries
Compare KONE with

John Deere

4.0
Compare

ABB

4.1
Compare

Caterpillar Inc

4.2
Compare

Schindler

4.0
Compare
write
Share an Interview