i
KONE
Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.
I ensure safety protocols by implementing a comprehensive plan and training workers on safety measures.
Develop a safety plan specific to the job site
Train workers on safety procedures and provide necessary safety equipment
Conduct regular safety inspections and address any hazards immediately
Ensure compliance with all relevant safety regulations and standards
Encourage workers to report any safety concerns or incidents
Ho...
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Feb 2021. There were 3 interview rounds.
A motor is a device that converts electrical energy into mechanical energy.
Motors are classified into two types: AC motors and DC motors.
AC motors are powered by alternating current and are commonly used in household appliances and industrial machinery.
DC motors are powered by direct current and are commonly used in electric vehicles and robotics.
The main difference between AC and DC motors is the type of current they ...
PPE is essential for ensuring safety in various industries.
PPE stands for Personal Protective Equipment.
It includes items like helmets, gloves, goggles, masks, etc.
PPE is used to protect workers from hazards and prevent injuries.
Examples of PPE usage include wearing a hard hat on construction sites, using gloves when handling chemicals, and wearing a mask during a pandemic.
Proper training and education on PPE usage are
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
There are various types of transformers, including step-up, step-down, isolation, autotransformer, and distribution transformers.
Step-up transformers increase voltage levels for long-distance power transmission.
Step-down transformers decrease voltage levels for household use.
Isolation transformers provide electrical isolation between circuits.
Autotransformers have a single winding with taps for different voltage levels...
To check if a motor is healthy, perform visual inspection, listen for unusual noises, check for overheating, measure voltage and current, and conduct performance tests.
Perform a visual inspection for any signs of damage or wear
Listen for any unusual noises such as grinding or squealing
Check for overheating by feeling the motor casing during operation
Measure voltage and current to ensure they are within the specified ra...
I applied via Walk-in and was interviewed in Mar 2024. There were 7 interview rounds.
New metric tool one nut is running tool oil plus And all part related quarry
Balancer adjustment and Balancer problam, Q. what this Secondary protection Ans:- wire rope is connected Balancer with beem.
PNR Tool is connected Transuser with ETA Tool Is running Tourq is watching ETA Display. and Another activity Quality Department Checked by Tourqrange
Maintenance is shine and another Activities morning 08:00AM groups meeting and Evaning 04:00 breakdown related query etc.
Maintenance groups is all member spot antorher person
I applied via Job Fair and was interviewed before Apr 2017. There were 5 interview rounds.
I applied via Company Website and was interviewed in Sep 2024. There were 2 interview rounds.
Dealing with a challenging project deadline
Prioritize tasks based on urgency and importance
Communicate effectively with team members and stakeholders
Seek help or resources if needed
Stay organized and focused under pressure
Safety methods and following procedures are essential for ensuring a safe work environment and preventing accidents.
Always follow safety protocols and guidelines provided by the company.
Use personal protective equipment (PPE) as required.
Regularly inspect and maintain equipment to ensure safe operation.
Report any safety concerns or incidents to the appropriate personnel.
Participate in safety training and drills to stay...
Policy accident financial support provides financial assistance to individuals who have experienced accidents covered by their insurance policy.
Policy accident financial support typically includes coverage for medical expenses, lost wages, and rehabilitation costs.
Examples of policy accident financial support include coverage for car accidents, workplace injuries, and slip and fall accidents.
Individuals must meet the c...
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
Quantitative Aptitude, Numerical Ability, Synonym etc
Some of the top questions asked at the KONE Technician interview -
based on 4 interviews
Interview experience
based on 19 reviews
Rating in categories
Design Engineer
188
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
147
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
115
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Agent
112
salaries
| ₹0 L/yr - ₹0 L/yr |
Schindler
Otis Elevator
TK Elevator
Johnson Lifts