Filter interviews by
To repair a pot hole, clean the area, fill it with asphalt or cold patch, and compact the material.
Clean the pot hole by removing any debris or loose material.
Fill the pot hole with asphalt or cold patch material.
Compact the material using a tamper or roller to ensure a smooth surface.
Seal the edges of the repaired pot hole to prevent water infiltration.
Regularly inspect and maintain the repaired area to prevent f...
IRC Code of Road studs specifies the standards for installation and maintenance of road studs on highways.
IRC: Indian Roads Congress
Code provides guidelines for color, size, spacing, and placement of road studs
Helps improve visibility and safety for drivers, especially at night
Examples: White studs on the center line, red studs on the edge of the road
The thickness of BT and BC laying varies depending on the specific project requirements and specifications.
The thickness of BT (Bituminous Concrete) and BC (Bituminous Macadam) laying can range from 25mm to 100mm.
The thickness is determined based on factors such as traffic volume, soil conditions, and intended use of the pavement.
For example, a highway pavement may require a thicker BT and BC laying compared to a ...
Sign boards are used for providing information, directions, warnings, regulations, and advertising.
Provide information to the public
Give directions to specific locations
Warn about potential hazards or dangers
Display regulations or rules
Advertise products or services
The thickness of BT and BC laying varies depending on the specific project requirements and specifications.
The thickness of BT (Bituminous Concrete) typically ranges from 25mm to 40mm.
The thickness of BC (Brick Concrete) can vary from 75mm to 150mm depending on the load-bearing requirements.
The thickness of BT and BC laying is determined by factors such as traffic load, climate conditions, and project specificatio...
Different types of sign boards include regulatory signs, warning signs, guide signs, and informational signs.
Regulatory signs: Signs that give instructions or convey regulations, such as speed limit signs or stop signs.
Warning signs: Signs that warn of potential hazards, such as slippery road signs or deer crossing signs.
Guide signs: Signs that provide information about directions, distances, services, etc., such ...
The procedure of repairing a pot hole involves cleaning the area, filling it with suitable material, and compacting it properly.
Clean the pot hole by removing any debris or loose material
Fill the pot hole with suitable material such as asphalt or concrete mix
Compact the filled material properly to ensure a strong and durable repair
Seal the edges of the pot hole to prevent water infiltration and further damage
Regul...
I applied via Naukri.com and was interviewed before Oct 2022. There were 3 interview rounds.
What I am submitting in the resume is this correct like adress, qualification, experience
Yes I am working at Hyderabad yadagiri tollways pvt limited
To repair a pot hole, clean the area, fill it with asphalt or cold patch, and compact the material.
Clean the pot hole by removing any debris or loose material.
Fill the pot hole with asphalt or cold patch material.
Compact the material using a tamper or roller to ensure a smooth surface.
Seal the edges of the repaired pot hole to prevent water infiltration.
Regularly inspect and maintain the repaired area to prevent future...
IRC Code of Road studs specifies the standards for installation and maintenance of road studs on highways.
IRC: Indian Roads Congress
Code provides guidelines for color, size, spacing, and placement of road studs
Helps improve visibility and safety for drivers, especially at night
Examples: White studs on the center line, red studs on the edge of the road
The thickness of BT and BC laying varies depending on the specific project requirements and specifications.
The thickness of BT (Bituminous Concrete) and BC (Bituminous Macadam) laying can range from 25mm to 100mm.
The thickness is determined based on factors such as traffic volume, soil conditions, and intended use of the pavement.
For example, a highway pavement may require a thicker BT and BC laying compared to a resid...
I applied via Naukri.com and was interviewed before Oct 2022. There were 3 interview rounds.
The procedure of repairing a pot hole involves cleaning the area, filling it with suitable material, and compacting it properly.
Clean the pot hole by removing any debris or loose material
Fill the pot hole with suitable material such as asphalt or concrete mix
Compact the filled material properly to ensure a strong and durable repair
Seal the edges of the pot hole to prevent water infiltration and further damage
Regular ma...
IRC Code of road studs specifies the standards for installation and maintenance of road studs on highways.
IRC: Indian Roads Congress
IRC Code provides guidelines for the design, placement, and materials used for road studs
It ensures visibility and safety for drivers, especially during night time
Examples of road studs include reflective studs, solar-powered studs, and ceramic studs
The thickness of BT and BC laying varies depending on the specific project requirements and specifications.
The thickness of BT (Bituminous Concrete) typically ranges from 25mm to 40mm.
The thickness of BC (Brick Concrete) can vary from 75mm to 150mm depending on the load-bearing requirements.
The thickness of BT and BC laying is determined by factors such as traffic load, climate conditions, and project specifications.
Sign boards are used for providing information, directions, warnings, regulations, and advertising.
Provide information to the public
Give directions to specific locations
Warn about potential hazards or dangers
Display regulations or rules
Advertise products or services
Different types of sign boards include regulatory signs, warning signs, guide signs, and informational signs.
Regulatory signs: Signs that give instructions or convey regulations, such as speed limit signs or stop signs.
Warning signs: Signs that warn of potential hazards, such as slippery road signs or deer crossing signs.
Guide signs: Signs that provide information about directions, distances, services, etc., such as ex...
I study Civil Engineering, focusing on structural design, construction materials, geotechnical engineering, and transportation engineering.
Structural design
Construction materials
Geotechnical engineering
Transportation engineering
As a Junior Engineer Civil, I focus on assisting in the design, construction, and maintenance of infrastructure projects.
Project Assistance: I support senior engineers in planning and executing civil engineering projects, such as roads and bridges.
Site Inspections: Conduct regular site visits to ensure compliance with design specifications and safety regulations.
Technical Drawings: Help in preparing and reviewing techn...
Top trending discussions
I applied via Company Website and was interviewed before Jun 2021. There were 2 interview rounds.
First round was coding as well as aptitude done together went well I guess focusing on codes helps a lot.
I applied via Naukri.com
Amazon's innovation, customer focus, and diverse opportunities align with my career goals and values.
Customer Obsession: Amazon prioritizes customer satisfaction, evident in initiatives like Prime and personalized recommendations.
Innovation: The company is a leader in technology and logistics, constantly pushing boundaries with services like AWS and drone delivery.
Diversity of Roles: Amazon offers a wide range of caree...
I expect Amazon to foster innovation, provide growth opportunities, and maintain a customer-centric culture.
Opportunities for professional development, such as training programs and mentorship.
A collaborative work environment that encourages teamwork and idea sharing.
Access to cutting-edge technology and resources to drive innovation.
A strong focus on customer satisfaction, ensuring that every decision prioritizes the ...
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There was 1 interview round.
Experienced professional with a strong educational background and clear career ambitions, eager to contribute to the company's success.
I have over 5 years of experience in project management, leading teams to successfully deliver complex projects on time.
I hold a Master's degree in Business Administration from XYZ University, where I specialized in strategic management.
My family has always emphasized the importance of ...
I applied via Naukri.com and was interviewed before Feb 2020. There were 3 interview rounds.
Workflow, trigger, reports, roles, profiles, permission set, and sharing rules are all important features in Salesforce.
Workflow is a series of automated steps that can be used to streamline business processes.
Triggers are used to execute code before or after a record is inserted, updated, or deleted.
Reports are used to display data in a visual format, such as a table or chart.
Roles are used to define the hierarchy of ...
I appeared for an interview before Jul 2020.
Yes, Infosys is listed on the Indian stock exchanges as well as on the NYSE.
Infosys is listed on the Bombay Stock Exchange (BSE) and National Stock Exchange of India (NSE)
It is also listed on the New York Stock Exchange (NYSE)
Infosys has a market capitalization of over $80 billion as of 2021
I applied via Job Fair and was interviewed before Feb 2021. There were 2 interview rounds.
based on 2 interview experiences
Difficulty level
Duration
based on 3 reviews
Rating in categories
Junior Engineer Civil
3
salaries
| ₹3.3 L/yr - ₹5.7 L/yr |
TCS
Accenture
Wipro
Cognizant